1
|
|
Executive Engineer, R.W. Dvin.-I, Cuttack
|
RD - EIC-RW CE, RW CE
|
Implementation of SNA -SPARSH in the State of Odisha Authorisation outstanding as onrn30.04.25
|
|
-- |
2
|
|
Executive Engineer, R.W. Dvin.-I, Cuttack
|
RD - Empowered Officer OSRRA, RW CE
|
Implementation of SNA -SPARSH in the State of Odisha Authorisation outstanding as onrn30.04.25
|
|
-- |
3
|
|
Executive Engineer, R.W. Dvin.-I, Cuttack
|
RD - Executive Engineer Establishment, RW CE
|
Your RTI application dated 28.04.2025 under RTI Act 2005.
|
|
-- |
4
|
|
Executive Engineer, R.W. Dvin.-I, Cuttack
|
RD - EIC-RW CE, RW CE
|
Your RTI application dated 28.04.2025 under RTI Act 2005.
|
|
-- |
5
|
|
Executive Engineer, R.W. Dvin.-I, Cuttack
|
RD - Executive Engineer-Establishment & allied works, RW CE
|
Your RTI application dated 28.04.2025 under RTI Act 2005.
|
|
-- |
6
|
|
Executive Engineer, R.W. Dvin.-I, Cuttack
|
RD - Chief Engineer-III, RW CE
|
Your RTI application dated 28.04.2025 under RTI Act 2005.
|
|
-- |
7
|
|
RW EE BALASORE - I
|
RD - EIC-RW CE, RW CE
|
Filling of the vacant posts of Junior Clerks in different Circles/Divisions under Rural Works Organisation
|
|
-- |
8
|
|
RW EE BALASORE - I
|
RD - Chief Engineer, Plan Roads, RW CE
|
Regarding requirement of funds for allotment as well as authorisation
|
|
-- |
9
|
|
RW EE BALASORE - I
|
Chief Engineer, Building and Bridge, RW CE
|
Regarding requirement of funds for allotment as well as authorisation
|
|
-- |
10
|
|
RW EE BALASORE - I
|
RD - EIC-RW CE, RW CE
|
Request for palcement of allotment under D No.28-3054-04-337-1230-02001-007 HRA-OA wages head towards payment of Salary
|
|
-- |
11
|
|
RW EE BALASORE - I
|
RD - EIC-RW CE, RW CE
|
Request for palcement of allotment under D No.28-2059-80-052-0851-03001-007-HRA-OA M and E Work charge head towards payment of salary
|
|
-- |
12
|
|
RW EE BALASORE - I
|
RD - EIC-RW CE, RW CE
|
Request for palcement of allotment under D No.28-3054-04-337-1230-03001-007 HRA-OA work charge head towards payment of Salary
|
|
-- |
13
|
|
RW EE BALASORE - I
|
Chief Engineer, Building and Bridge, RW CE
|
Regarding requirement of funds for allotment as well as authorisation
|
|
-- |
14
|
|
RW EE BALASORE - I
|
RD - Chief Engineer, Plan Roads, RW CE
|
Regarding Construction of road from Chhotatentulia to Padmapokhari road under CMRL in Balasore
|
|
-- |
15
|
|
RW EE BALASORE - I
|
Chief Engineer, Building and Bridge, RW CE
|
Regarding requirement of funds for allotment as well as authorisation
|
|
-- |
16
|
|
RW EE BALASORE - I
|
Chief Engineer, Building and Bridge, RW CE
|
Submission of Hydraulic Particulars along with Sub-Soil exploration report
|
|
-- |
17
|
|
RW EE BALASORE - I
|
RD - Chief Engineer, Plan Roads, RW CE
|
Request for placement of funds towards shifting of Elect. utilities from the alignment of road from Bankipada Chandanpokhari toPWD road Arobinda School Chhak via Biriha Sahi Chintamanipur GP Iswarpur road under MMSY-TRIP
|
|
-- |
18
|
|
RW EE BALASORE - I
|
RD - Chief Engineer, Plan Roads, RW CE
|
Request for placement of funds towards shifting of Elect. utilities from the alignment of road from Bankipada Chandanpokhari toPWD road Arobinda School Chhak via Biriha Sahi Chintamanipur GP Iswarpur road under MMSY-TRIP
|
|
-- |
19
|
|
RW EE BALASORE - I
|
Chief Engineer, Building and Bridge, RW CE
|
Issue of permission towards submission of estimate for repair and renovation works of residential and non-residential buildings pertaining to office of the SP Balasore
|
|
-- |
20
|
|
RW EE BALASORE - I
|
RD - EIC-RW CE, RW CE
|
Submission of Utilisation certificate for flood damaged Roads due to DANA for the year 2024-25
|
|
-- |
21
|
|
RW EE BALASORE - I
|
RD - EIC-RW CE, RW CE
|
Submission of Utilisation certificate for flood damaged Roads due to DANA for the year 2024-25
|
|
-- |
22
|
|
Executive Engineer
|
RD - EIC-RW CE, RW CE
|
Office Order.
|
|
-- |
23
|
|
Executive Engineer
|
RD - Chief Engineer, Plan Roads, RW CE
|
Office Order.
|
|
-- |
24
|
|
Executive Engineer
|
RD - EIC-RW CE, RW CE
|
Office Order.
|
|
-- |
25
|
|
Executive Engineer
|
RD - Chief Engineer, Plan Roads, RW CE
|
Office Order.
|
|
-- |
26
|
|
Executive Engineer
|
RD - Chief Engineer, Plan Roads, RW CE
|
Office Order.
|
|
-- |
27
|
|
Executive Engineer
|
RD - EIC-RW CE, RW CE
|
Office Order.
|
|
-- |
28
|
|
Executive Engineer
|
RD - EIC-RW CE, RW CE
|
Transfer of PR roads to RD Department in the District of Jagatsinghpur.
|
|
-- |
29
|
|
Executive Engineer
|
RD - Chief Engineer, PMGSY, RW CE
|
Work order for the work Periodical Renewal of 5 year completed Post DLP PMGSY road i.e. Katara Parahat via Baranga, (OR-12-71), Dosadki Sanara (OR-12-15), Katara Baranga (OR-12-ADB-58) and Ayodhyapur to Narayani Chhak (OR-12-127) under periodical Maintenance OR-12-PM-43
|
|
-- |
30
|
|
Executive Engineer
|
RD - EIC-RW CE, RW CE
|
Work order for the work Periodical Renewal of 5 year completed Post DLP PMGSY road i.e. Katara Parahat via Baranga, (OR-12-71), Dosadki Sanara (OR-12-15), Katara Baranga (OR-12-ADB-58) and Ayodhyapur to Narayani Chhak (OR-12-127) under periodical Maintenance OR-12-PM-43
|
|
-- |
31
|
|
Executive Engineer
|
RD - Chief Engineer, PMGSY, RW CE
|
Submission of Annual Maintenance Plan for 5 years completed PMGSY roads under Periodical Renewal Scheme for the year 2025-26.
|
|
-- |
32
|
|
Executive Engineer,RW,Nayagarh
|
Chief Engineer, Building and Bridge, RW CE
|
Revised requirement of funds for NHM Buildings under State Plan
|
|
-- |
33
|
|
Executive Engineer,RW,Nayagarh
|
RD - Chief Engineer, Buildings, RW CE
|
Revised requirement of funds for NHM Buildings under State Plan
|
|
-- |
34
|
|
EXECUTIVE ENGINEER, RW, NAYAGARH
|
RD - EIC-RW CE, RW CE
|
Implementation of SNA-SPARSH in the state of Odisha Authorisation outstanding on 30.04.2025
|
|
-- |
35
|
|
EXECUTIVE ENGINEER, RW, NAYAGARH
|
RD - Empowered Officer OSRRA, RW CE
|
Implementation of SNA-SPARSH in the state of Odisha Authorisation outstanding on 30.04.2025
|
|
-- |
36
|
|
EXECUTIVE ENGINEER, RW, NAYAGARH
|
RD-Executive Engineer-PMGSY, RW CE
|
Implementation of SNA-SPARSH in the state of Odisha Authorisation outstanding on 30.04.2025
|
|
-- |
37
|
|
Executive Engineer,RW,Nayagarh
|
RD - Chief Engineer, PMGSY, RW CE
|
Submission of pending SQM ATRs after verification of SQM
|
|
-- |
38
|
|
Executive Engineer
|
RD - EIC-RW CE, RW CE
|
Submission of compliance report on Dept. Grievance Registration No. DEPT 20251182055 dtd.03.05.2025. Regarding Un-utilized earn leave, PRAN amount and retirement benefits.
|
|
-- |
39
|
|
Executive Engineer,RW,Nayagarh
|
Chief Engineer, Building and Bridge, RW CE
|
Requirement of funds for MPH building under head of account 05-4217-60-052-3478-37107-000
|
|
-- |
40
|
|
Executive Engineer,RW,Nayagarh
|
RD - Chief Engineer, Buildings, RW CE
|
Requirement of funds for MPH building under head of account 05-4217-60-052-3478-37107-000
|
|
-- |
41
|
|
Executive Engineer,RW,Nayagarh
|
RD - EIC-RW CE, RW CE
|
Compliance report for IR No.127/2024-25
|
|
-- |
42
|
|
Executive Engineer,RW,Nayagarh
|
Chief Engineer, Building and Bridge, RW CE
|
Requirement of funds for RD Building under State Plan
|
|
-- |
43
|
|
Executive Engineer,RW,Nayagarh
|
RD - Chief Engineer, Buildings, RW CE
|
Requirement of funds for RD Building under State Plan
|
|
-- |
44
|
|
RW SE ELECTRICAL BBSR
|
RD - EIC-RW CE, RW CE
|
Filling of the vacant posts of junior clerks
|
|
-- |
45
|
|
Executive Engineer,RW,Nayagarh
|
RD - Chief Engineer, PMGSY, RW CE
|
Work order for the work “Annual Maintenance Plan for 5 years Completed PMGSY (POST DLP) roads such as (a)NH-5 to Cuttack Sahar (b) NH-5 to Kandhanayagarh (c) Pampada Hansara Narasinghpur road (d) Andharua Samantasingharpur Road (e ) NH-5 to Champagarh under Package No
|
|
-- |
46
|
|
Executive Engineer,RW,Nayagarh
|
RD - EIC-RW CE, RW CE
|
Work order for the work “Annual Maintenance Plan for 5 years Completed PMGSY (POST DLP) roads such as (a)NH-5 to Cuttack Sahar (b) NH-5 to Kandhanayagarh (c) Pampada Hansara Narasinghpur road (d) Andharua Samantasingharpur Road (e ) NH-5 to Champagarh under Package No
|
|
-- |
47
|
|
Executive Engineer
|
RD - EIC-RW CE, RW CE
|
Willful absent and negligence in Govt. Duty.
|
|
-- |
48
|
|
Executive Engineer
|
RD - EIC-RW CE, RW CE
|
Regarding Gradation List of Head Clerk.
|
|
-- |
49
|
|
Executive Engineer
|
RD - EIC-RW CE, RW CE
|
Filling of the vacant posts of Junior Clerk in different circles / Division under Rural Works Organization.
|
|
-- |
50
|
|
Executive Engineer
|
RD - Chief Engineer, Plan Roads, RW CE
|
Issue of LOA & request to furnish required original documents for verification & to submit financial instruments towards ISD & APS & other documents to fulfill the codal procedures & to sign P1 Agreement for the work
|
|
-- |
51
|
|
Executive Engineer
|
RD - Chief Engineer, Buildings, RW CE
|
Requisition of funds for Building works (MPH) in the District of Keonjhar for the year 2025-26.
|
|
-- |
52
|
|
Executive Engineer
|
Chief Engineer, Building and Bridge, RW CE
|
Requisition of funds for Building works (MPH) in the District of Keonjhar for the year 2025-26.
|
|
-- |
53
|
|
Executive Engineer
|
Chief Engineer, Building and Bridge, RW CE
|
Requisition of funds for Bridge work in District of Keonjhar for the year 2025-26.
|
|
-- |
54
|
|
Executive Engineer
|
RD - Chief Engineer, Buildings, RW CE
|
Requisition of funds for Bridge work in District of Keonjhar for the year 2025-26.
|
|
-- |
55
|
|
Executive Engineer
|
RD - Chief Engineer, Buildings, RW CE
|
Submission of sub-soil exploration report for the work.
|
|
-- |
56
|
|
Executive Engineer
|
Chief Engineer, Building and Bridge, RW CE
|
Submission of sub-soil exploration report for the work.
|
|
-- |
57
|
|
Executive Engineer
|
RD - EIC-RW CE, RW CE
|
Submission of sub-soil exploration report for the work.
|
|
-- |
58
|
|
Executive Engineer
|
RD - EIC-RW CE, RW CE
|
Joining Report of Sri Upendra Kumar Das, Junior Clerk.
|
|
-- |
59
|
|
Executive Engineer
|
RD - Empowered Officer OSRRA, RW CE
|
Implementation of SNA-SPARSH in the State of Odisha Authorization Outstanding as on 30.04.2024
|
|
-- |
60
|
|
Executive Engineer
|
Chief Engineer, Building and Bridge, RW CE
|
Requisition of allotment and authorization for SBY work 28-5054-04-101-0186-22115-073
|
|
-- |
61
|
|
Executive Engineer
|
RD - Chief Engineer, Buildings, RW CE
|
Requisition of allotment and authorization for SBY work 28-5054-04-101-0186-22115-073
|
|
-- |
62
|
|
Executive Engineer
|
RD - Chief Engineer, Buildings, RW CE
|
Regarding permission to take up the projects -Construction of additional class room at 23 different location of Vyasanagar Municipality in Jajpur District Sanction under DMF
|
|
-- |
63
|
|
Executive Engineer
|
Chief Engineer, Building and Bridge, RW CE
|
Regarding permission to take up the projects -Construction of additional class room at 23 different location of Vyasanagar Municipality in Jajpur District Sanction under DMF
|
|
-- |
64
|
|
Executive Engineer
|
RD - Chief Engineer, PMGSY, RW CE
|
Escalation bill for the work -Construction of HL Bridge over river Brahmani near Kharipadia of HL Bridge over river Brahmani near Kharipadia on Paramanadapur to mendha via Kharipadia road
|
|
-- |
65
|
|
Executive Engineer
|
RD - Chief Engineer, Buildings, RW CE
|
Submission of pile load test report for the work -Construction of H.L Bridge over river Tantighai at 3rd km on MDR-14 to Kantia via Bhanra -Bhurunga road in the District of Jajpur
|
|
-- |
66
|
|
Executive Engineer
|
Chief Engineer, Building and Bridge, RW CE
|
Submission of pile load test report for the work -Construction of H.L Bridge over river Tantighai at 3rd km on MDR-14 to Kantia via Bhanra -Bhurunga road in the District of Jajpur
|
|
-- |
67
|
|
Executive Engineer
|
RD - Chief Engineer, PMGSY, RW CE
|
Regarding the work -Construction of roads and CD works including maintenance under PMGSY pkg No. OR-13-396 Uttarkhajuria to Sundarpokhari via Tarakot in the District of Jajpur
|
|
-- |
68
|
|
Executive Engineer
|
RD - Chief Engineer, Plan Roads, RW CE
|
Issue of allotment & Authorization for road works
|
|
-- |
69
|
|
Executive Engineer
|
RD - Chief Engineer-I, RW CE
|
Filling of the Vacant posts of Junior Clerks in different Circles/ Division under Rural Works Organization
|
|
-- |
70
|
|
Executive Engineer
|
RD - EIC-RW CE, RW CE
|
Filling of the Vacant posts of Junior Clerks in different Circles/ Division under Rural Works Organization
|
|
-- |
71
|
|
Executive Engineer
|
Chief Engineer, Building and Bridge, RW CE
|
Requisition of allotment and authorization for SBY Works
|
|
-- |
72
|
|
Executive Engineer
|
RD - Chief Engineer, Buildings, RW CE
|
Requisition of allotment and authorization for SBY Works
|
|
-- |
73
|
|
Executive Engineer
|
RD - Chief Engineer, Buildings, RW CE
|
Requisition of allotment and authorization for SBY Works
|
|
-- |
74
|
|
Executive Engineer
|
Chief Engineer, Building and Bridge, RW CE
|
Requisition of allotment and authorization for SBY Works
|
|
-- |
75
|
|
Executive Engineer
|
Chief Engineer, Building and Bridge, RW CE
|
Requisition of allotment and authorization for SBY Works
|
|
-- |
76
|
|
Executive Engineer
|
RD - Chief Engineer, Buildings, RW CE
|
Requisition of allotment and authorization for SBY Works
|
|
-- |
77
|
|
Executive Engineer
|
Chief Engineer, Building and Bridge, RW CE
|
Requisition of allotment and authorization for Building Works
|
|
-- |
78
|
|
Executive Engineer
|
RD - Chief Engineer, Buildings, RW CE
|
Requisition of allotment and authorization for Building Works
|
|
-- |
79
|
|
Executive Engineer
|
RD - Chief Engineer, Buildings, RW CE
|
Requisition of allotment and authorization for building works , Plan Building
|
|
-- |
80
|
|
Executive Engineer
|
Chief Engineer, Building and Bridge, RW CE
|
Requisition of allotment and authorization for building works , Plan Building
|
|
-- |
81
|
|
Executive Engineer
|
RD - Chief Engineer-I, RW CE
|
Office Order
|
|
-- |
82
|
|
Executive Engineer
|
RD - EIC-RW CE, RW CE
|
Office Order
|
|
-- |
83
|
|
Executive Engineer
|
RD - Chief Engineer, PMGSY, RW CE
|
Submission of Annual Maintenance Plan for 5 years completed PMGSY roads under Periodical renewal scheme for the year 2025-26.
|
|
-- |
84
|
|
EE JHARSUGUDA
|
RD - Chief Engineer, PMGSY, RW CE
|
Submission of Annual Maintenance Plan of 5 years completed PMGSY roads under Periodical Renewal Scheme for the year 2025-26.
|
|
-- |
85
|
|
EE JHARSUGUDA
|
RD - EIC-RW CE, RW CE
|
Submission of Annual Maintenance Plan of 5 years completed PMGSY roads under Periodical Renewal Scheme for the year 2025-26.
|
|
-- |
86
|
|
Executive Engineer
|
Chief Engineer, Building and Bridge, RW CE
|
Release of Allotment / LC under head of account- SBY.
|
|
-- |
87
|
|
Executive Engineer
|
RD - Chief Engineer, Buildings, RW CE
|
Release of Allotment / LC under head of account- SBY.
|
|
-- |
88
|
|
EE JHARSUGUDA
|
RD - EIC-RW CE, RW CE
|
Submission of monthly inspection programme of Non-PMGSY works by Chief Construction Engineer of adjacent Rural Works Circle for the month of May -2025.
|
|
-- |
89
|
|
EE JHARSUGUDA
|
Chief Engineer, Building and Bridge, RW CE
|
Submission of monthly inspection programme of Non-PMGSY works by Chief Construction Engineer of adjacent Rural Works Circle for the month of May -2025.
|
|
-- |
90
|
|
EE JHARSUGUDA
|
RD - EIC-RW CE, RW CE
|
Request for demarcation of the road fo the work ' Construction of road from weekly market Rengali to Sunnakhan via. Nuadihi, Attabira GP under Lakhanpur block for the year 2023-24.
|
|
-- |
91
|
|
EE JHARSUGUDA
|
RD - Chief Engineer, Buildings, RW CE
|
Request for demarcation of the road fo the work ' Construction of road from weekly market Rengali to Sunnakhan via. Nuadihi, Attabira GP under Lakhanpur block for the year 2023-24.
|
|
-- |
92
|
|
Executive Engineer
|
RD - Chief Engineer, PMGSY, RW CE
|
Submission of AMP for 5 years completed PMGSY roads under Periodical Renewal Scheme for 2025-26
|
|
-- |
93
|
|
Executive Engineer
|
RD-SE Quality control, RW CE
|
Submission of monthly programme for inspection of Non PMGSY work by CCE of adjustment Rural Circle for month May-2025
|
|
-- |
94
|
|
Executive Engineer
|
RD - Chief Engineer-I, RW CE
|
Submission of monthly programme for inspection of Non PMGSY work by CCE of adjustment Rural Circle for month May-2025
|
|
-- |
95
|
|
Executive Engineer
|
RD-Executive Engineer-Quality Control, RW CE
|
Submission of monthly programme for inspection of Non PMGSY work by CCE of adjustment Rural Circle for month May-2025
|
|
-- |
96
|
|
Executive Engineer
|
RD - Chief Engineer, Plan Roads, RW CE
|
Verification of detailed estimates provided by Executive Engineer (Elect),MED,TPSODL, Malkangiri for Utility Shifting on the road “Improvement to OLD MM Road under SACI Scheme for the year 2023-24 in the District of Malkangiri Kalimela Block”.
|
|
-- |
97
|
|
Executive Engineer
|
Chief Engineer, Building and Bridge, RW CE
|
Submission of PCC for work construction of HL Bridge over Bandhesuni Nalah on Jalada sasan at Khaira road under BSY for 2023-24
|
|
-- |
98
|
|
Executive Engineer
|
RD - Chief Engineer, Plan Roads, RW CE
|
Verification of detailed estimates
|
|
-- |
99
|
|
Executive Engineer
|
RD - Chief Engineer-I, RW CE
|
Requisition of funds for payment of remuneration to outsourced employee for 2025-26
|
|
-- |
100
|
|
Executive Engineer
|
Chief Engineer, Building and Bridge, RW CE
|
Regarding shifting of 11KV line and electric poles near new bridge approach and its alignment.
|
|
-- |
101
|
|
Executive Engineer
|
Chief Engineer, Building and Bridge, RW CE
|
WPC No.1816 of 2025 Madhusudan Roul
|
|
-- |
102
|
|
Executive Engineer
|
RD - Chief Engineer, Plan Roads, RW CE
|
Requirements of funds under SACI
|
|
-- |
103
|
|
RW SE SUNABEDA
|
RD - EIC-RW CE, RW CE
|
Court cases with major implications.
|
|
-- |
104
|
|
RW SE SUNABEDA
|
RD - EIC-RW CE, RW CE
|
WPC No.14263 of 2024 filed by Gopal Bahadur Gurum-Vrs-State of Odisha and Others.
|
|
-- |
105
|
|
EE JHARSUGUDA
|
RD - Chief Engineer, Buildings, RW CE
|
Work order for the work ' Construction of road from Weekly Market REngali to Sunnakhan via. Nuadihi, Attabira GP under Lakhanpur Block under DMF for the year 2023-24.
|
|
-- |
106
|
|
EE JHARSUGUDA
|
RD - EIC-RW CE, RW CE
|
Work order for the work ' Construction of road from Weekly Market REngali to Sunnakhan via. Nuadihi, Attabira GP under Lakhanpur Block under DMF for the year 2023-24.
|
|
-- |
107
|
|
RW SE CUTTACK
|
RD - EIC-RW CE, RW CE
|
Submission of court cases with major implication
|
|
-- |
108
|
|
RW SE CUTTACK
|
RD - Chief Engineer, PMGSY, RW CE
|
Submission of EOT application for the work Costn of rural road and CD work PMGSY pkg no.OR-07-335
|
|
-- |
109
|
|
Executive Engineer
|
RD - EIC-RW CE, RW CE
|
Submission of pension documents in favour of Sri Kota Prasada Rao , Executive Engineer of this Division.
|
|
-- |
110
|
|
Executive Engineer
|
RD - EIC-RW CE, RW CE
|
Wilful absence in Govt. duty.
|
|
-- |
111
|
|
Executive Engineer
|
RD - EIC-RW CE, RW CE
|
Resubmit the proposal for lnter-departmental Transfer of roads.
|
|
-- |
112
|
|
Executive Engineer
|
RD - EIC-RW CE, RW CE
|
Submission of revised database of all employees under this Division.
|
|
-- |
113
|
|
Executive Engineer
|
RD - Chief Engineer, Plan Roads, RW CE
|
Resubmission of Revised estimate along with deviation statement for the work – “Construction and maintenance of Gadadharpur to Arjunbilla road under TRIP in the district of Keonjhar for the year 2022-23.
|
|
-- |
114
|
|
Executive Engineer
|
Chief Engineer, Building and Bridge, RW CE
|
Re-submission of utilization certificate under RMSA (17 nos. New Upgraded School Buildings) for the year 2011-12 period ending November’2017.
|
|
-- |
115
|
|
Executive Engineer
|
RD - Empowered Officer OSRRA, RW CE
|
Submission of Bio-data for entry the name and Bank details of Suresh Kumar Ghadei B class contractor in OMMAS site
|
|
-- |
116
|
|
Executive Engineer
|
Chief Engineer, Building and Bridge, RW CE
|
Submission of Utilization Certificate and refund of interest o9n OMBADA funds for the year 2024-25.
|
|
-- |
117
|
|
Executive Engineer
|
RD - EIC-RW CE, RW CE
|
Requirement of funds under D.No. 28-5054-col on Road and Bridges programme Expenditure State Sectir04-DoR-S-P337 0ad
|
|
-- |
118
|
|
Executive Engineer
|
RD - EIC-RW CE, RW CE
|
Office Order
|
|
-- |
119
|
|
Executive Engineer
|
RD - Empowered Officer OSRRA, RW CE
|
Requisition of Bank Authorization for Administrative Expenses fund for the month of April2025.
|
|
-- |
120
|
|
Executive Engineer
|
RD - Chief Engineer, Plan Roads, RW CE
|
Issue of LOA and request to furnish required original documents for verification and to submit financial instruments towards ISD and APS and other documents to fulfill the codal procedures and to sign P1 Agreement for the work Construction of Gopalopur NH 20 to Basantpu
|
|
-- |
121
|
|
Executive Engineer
|
RD - Chief Engineer, Plan Roads, RW CE
|
Issue of LOA and request to furnish required original documents for verification and to submit financial instruments towards ISD and APS and other documents to fulfill the codal procedures and to sign P1 agreement for the work Construction of PWD(Ramachandrapur) road t
|
|
-- |
122
|
|
RW SE Angul
|
RD - EIC-RW CE, RW CE
|
Serving of Provisional Gradation list of Head Clerk
|
|
-- |
123
|
|
RW SE Angul
|
RD - EIC-RW CE, RW CE
|
Filling of the vacant posts of Junior Clerks in different circles/Divisions under Rural Works Organization
|
|
-- |
124
|
|
RW SE Angul
|
RD - EIC-RW CE, RW CE
|
Submission of grivance report against Sri Rupeash Kumar Pradhan A class contractor for the work Constn of road from Analabereni to Khandabar road under SACI for the year 2023-24
|
|
-- |
125
|
|
RW SE Angul
|
RD - Chief Engineer, Plan Roads, RW CE
|
Submission of grivance report against Sri Rupeash Kumar Pradhan A class contractor for the work Constn of road from Analabereni to Khandabar road under SACI for the year 2023-24
|
|
-- |
126
|
|
RW SE Angul
|
RD - EIC-RW CE, RW CE
|
Representation of Sri Rajat Kumar Behera AE(Under suspension for reinstatement
|
|
-- |
127
|
|
RW SE Angul
|
RD - EIC-RW CE, RW CE
|
Pension Paper of Sri B.B.Padhi,Senior Stenographer
|
|
-- |