1
|
|
E.E., R.W. Divn., Kuchinda
|
RD - EIC-RW CE, RW CE
|
Submission of Earned Leave application of Sri Ashok Kumar Das, Ex-Assistant Executive Engineer
|
|
-- |
|
2
|
|
Executive Engineer
|
RD - Chief Engineer-I, RW CE
|
Monthly Expenditure statement for the month of 10/2026 under Demand No. 28-2059-P.W (O) -80-General-001-(D&A)-0453-Execution -000400-R.W.Division-01003-Salary items (Non-Plan) for the year 2026-27
|
|
-- |
|
3
|
|
Executive Engineer
|
RD - EIC-RW CE, RW CE
|
Monthly Expenditure statement for the month of 10/2026 under Demand No. 28-2059-P.W (O) -80-General-001-(D&A)-0453-Execution -000400-R.W.Division-01003-Salary items (Non-Plan) for the year 2026-27
|
|
-- |
|
4
|
|
Executive Engineer
|
RD - EIC-RW CE, RW CE
|
Repair & maintenance of 20 K.V.A kirloskar D,G of Rural Works Division, Jajpur
|
|
-- |
|
5
|
|
Executive Engineer
|
RD - Chief Engineer, Buildings, RW CE
|
Repair & maintenance of 20 K.V.A kirloskar D,G of Rural Works Division, Jajpur
|
|
-- |
|
6
|
|
Executive Engineer
|
Chief Engineer, Building and Bridge, RW CE
|
Repair & maintenance of 20 K.V.A kirloskar D,G of Rural Works Division, Jajpur
|
|
-- |
|
7
|
|
Executive Engineer
|
RD - Chief Engineer-I, RW CE
|
Repair & maintenance of 20 K.V.A kirloskar D,G of Rural Works Division, Jajpur
|
|
-- |
|
8
|
|
Executive Engineer
|
RD - EIC-RW CE, RW CE
|
Office Order
|
|
-- |
|
9
|
|
Executive Engineer
|
RD - Chief Engineer-I, RW CE
|
Office Order
|
|
-- |
|
10
|
|
Executive Engineer
|
RD - Chief Engineer, Buildings, RW CE
|
Clarification regarding admissibility and payment of Escalation bill of M/s Biraja Construction arising out of W.P (C) No. 30943 of 2026 related to the work-Construction of HL Bridge over river Baitarani at 5th km on Patapur to Jatantara road under BSY inthe District of
|
|
-- |
|
11
|
|
Executive Engineer
|
Chief Engineer, Building and Bridge, RW CE
|
Clarification regarding admissibility and payment of Escalation bill of M/s Biraja Construction arising out of W.P (C) No. 30943 of 2026 related to the work-Construction of HL Bridge over river Baitarani at 5th km on Patapur to Jatantara road under BSY inthe District of
|
|
-- |
|
12
|
|
Executive Engineer
|
RD - EIC-RW CE, RW CE
|
Clarification regarding admissibility and payment of Escalation bill of M/s Biraja Construction arising out of W.P (C) No. 30943 of 2026 related to the work-Construction of HL Bridge over river Baitarani at 5th km on Patapur to Jatantara road under BSY inthe District of
|
|
-- |
|
13
|
|
Executive Engineer
|
RD - Chief Engineer-I, RW CE
|
Clarification regarding admissibility and payment of Escalation bill of M/s Biraja Construction arising out of W.P (C) No. 30943 of 2026 related to the work-Construction of HL Bridge over river Baitarani at 5th km on Patapur to Jatantara road under BSY inthe District of
|
|
-- |
|
14
|
|
Executive Engineer
|
Chief Engineer, Building and Bridge, RW CE
|
Re-Submission of Estimate RD Res/Non-res building works during the year 2026-27
|
|
-- |
|
15
|
|
Executive Engineer
|
RD - Chief Engineer, Buildings, RW CE
|
Re-Submission of Estimate RD Res/Non-res building works during the year 2026-27
|
|
-- |
|
16
|
|
Executive Engineer
|
RD - Chief Engineer, PMGSY, RW CE
|
Request for entering the Bank Details PMGSY (ADministrative Expenses Fund) in favour of Smt. Lopamudra Nayak & Smt Satybhama Das
|
|
-- |
|
17
|
|
Executive Engineer
|
RD - Empowered Officer OSRRA, RW CE
|
Request for entering the Bank Details PMGSY (ADministrative Expenses Fund) in favour of Smt. Lopamudra Nayak & Smt Satybhama Das
|
|
-- |
|
18
|
|
Executive Engineer
|
Chief Engineer, Building and Bridge, RW CE
|
Requirement of funds for RI office Berhampur.
|
|
-- |
|
19
|
|
Executive Engineer
|
Chief Engineer, Building and Bridge, RW CE
|
Requirement of funds for MPH building works.
|
|
-- |
|
20
|
|
Executive Engineer
|
RD - Chief Engineer, Buildings, RW CE
|
Requirement of funds for PHC building works.
|
|
-- |
|
21
|
|
Executive Engineer
|
RD - EIC-RW CE, RW CE
|
Office order No 2 W/C of 2026-27 (Retirement of Sri Mahendra Prasad Nayak, Gangmulia).
|
|
-- |
|
22
|
|
Executive Engineer
|
RD - EIC-RW CE, RW CE
|
Requirement of additional allotment of funds for office expenses towards other contingency.
|
|
-- |
|
23
|
|
Executive Engineer
|
RD - EIC-RW CE, RW CE
|
Nomination one Nodal Officer of the Master Trainer for Capacity building integrated Road Safety Dash Board.
|
|
-- |
|
24
|
|
Executive Engineer
|
RD - Chief Engineer, Plan Roads, RW CE
|
Submission of road proposal of Tihidi and Bonth block under SDMF Scheme for 26-27.
|
|
-- |
|
25
|
|
Executive Engineer
|
RD - Chief Engineer, Plan Roads, RW CE
|
Submission of requisition format for routine maintenance of completed road works.
|
|
-- |
|
26
|
|
Executive Engineer
|
RD - EIC-RW CE, RW CE
|
Submission of road proposal to be taken up under CWA scheme during the year 2026-27 of Rairakhol Constituency
|
|
-- |
|
27
|
|
Executive Engineer
|
RD - Chief Engineer, Plan Roads, RW CE
|
Requirement of funds for CMRL works
|
|
-- |
|
28
|
|
Executive Engineer
|
RD - Chief Engineer, Buildings, RW CE
|
Requirement of funds for work subcenter building
|
|
-- |
|
29
|
|
Executive Engineer
|
RD - Chief Engineer, PMGSY, RW CE
|
Deduction of Withheld Amounts towards 3.04 Miscellaneous Deposit in respect ofrnPMGSY Package No. OR-25-360 & PMGSY Package No. OR-25-356.
|
|
-- |
|
30
|
|
Executive Engineer
|
RD - EIC-RW CE, RW CE
|
Acceptance of tender for the work ' Construction of Toilet for PWDs and Transgender at thernCourt premises of Tumudibandha in the district of Kandhamal for the year 2026-27.
|
|
-- |
|
31
|
|
Executive Engineer
|
Chief Engineer, Building and Bridge, RW CE
|
Acceptance of tender for the work ' Construction of Toilet for PWDs and Transgender at thernCourt premises of Tumudibandha in the district of Kandhamal for the year 2026-27.
|
|
-- |
|
32
|
|
Executive Engineer
|
RD - Chief Engineer, Plan Roads, RW CE
|
Bid Identification No. Online Tender-11/SERWD BLG/2026-27.
|
|
-- |
|
33
|
|
Executive Engineer
|
RD - EIC-RW CE, RW CE
|
Bid Identification No. Online Tender-11/SERWD BLG/2026-27.
|
|
-- |
|
34
|
|
Executive Engineer
|
Chief Engineer, Building and Bridge, RW CE
|
Bid Identification No. Online Tender-11/SERWD BLG/2026-27.
|
|
-- |
|
35
|
|
Executive Engineer
|
RD - EIC-RW CE, RW CE
|
Submlsslon of requisition of funds for payment of bills.Construction of PWD Road to Debabhuin Road under MMSY- Impvt to Existing RD Road for the Year 2025-26
|
|
-- |
|
36
|
|
Executive Engineer
|
RD - Chief Engineer, Plan Roads, RW CE
|
Submlsslon of requisition of funds for payment of bills.Construction of PWD Road to Debabhuin Road under MMSY- Impvt to Existing RD Road for the Year 2025-26
|
|
-- |
|
37
|
|
Executive Engineer
|
RD - EIC-RW CE, RW CE
|
Identification No. Online Tender/10-2026-27/BLG.
|
|
-- |
|
38
|
|
Executive Engineer
|
RD - Chief Engineer, Plan Roads, RW CE
|
Identification No. Online Tender/10-2026-27/BLG.
|
|
-- |
|
39
|
|
Executive Engineer
|
Chief Engineer, Building and Bridge, RW CE
|
Identification No. Online Tender/10-2026-27/BLG.
|
|
-- |
|
40
|
|
Executive Engineer
|
RD - Chief Engineer-III, RW CE
|
Supply of Information to RTI application on dtd.01-07.2026 of Sri Asish Panda.
|
|
-- |
|
41
|
|
Executive Engineer
|
RD - EIC-RW CE, RW CE
|
Supply of Information to RTI application on dtd.01-07.2026 of Sri Asish Panda.
|
|
-- |
|
42
|
|
Superitendent Engineer
|
RD - EIC-RW CE, RW CE
|
OFFICE ORDER
|
|
-- |
|
43
|
|
Superitendent Engineer
|
RD - Chief Engineer, Plan Roads, RW CE
|
Improvement to Sarki to Dinabali road
|
|
-- |
|
44
|
|
Superitendent Engineer
|
RD - Chief Engineer, Schemes, RW CE
|
Improvement to Sarki to Dinabali road
|
|
-- |
|
45
|
|
Superitendent Engineer
|
RD - Chief Engineer, Schemes, RW CE
|
Construction of road from Taraput to Tadipaju under MMSY TRIP
|
|
-- |
|
46
|
|
Superitendent Engineer
|
RD - Chief Engineer, Plan Roads, RW CE
|
Construction of road from Taraput to Tadipaju under MMSY TRIP
|
|
-- |
|
47
|
|
Superitendent Engineer
|
RD - Chief Engineer, Plan Roads, RW CE
|
Submission of DPR project under MMSY TRIP
|
|
-- |
|
48
|
|
Superitendent Engineer
|
RD - Chief Engineer, Schemes, RW CE
|
Submission of DPR project under MMSY TRIP
|
|
-- |
|
49
|
|
Superitendent Engineer
|
RD - EIC-RW CE, RW CE
|
Proposed bridge over river Bahuda 0/150 km on Sirisiganda to Lakaisuni
|
|
-- |
|
50
|
|
Superitendent Engineer
|
RD - Chief Engineer, Schemes, RW CE
|
Construction of HL bridge over Bahuda river
|
|
-- |
|
51
|
|
Superitendent Engineer
|
RD - Chief Engineer, Plan Roads, RW CE
|
Construction of HL bridge over Bahuda river
|
|
-- |
|
52
|
|
Superitendent Engineer
|
RD - Chief Engineer, Buildings, RW CE
|
Construction of HL bridge over Bahuda river
|
|
-- |
|
53
|
|
Superitendent Engineer
|
RD - Chief Engineer, Schemes, RW CE
|
Construction of Kankroda to Gambhariguda via Sansara road
|
|
-- |
|
54
|
|
Superitendent Engineer
|
RD - Chief Engineer, Plan Roads, RW CE
|
Construction of Kankroda to Gambhariguda via Sansara road
|
|
-- |
|
55
|
|
Superitendent Engineer
|
RD - EIC-RW CE, RW CE
|
Regarding appointment of Smt Neeladri Mahakuda
|
|
-- |
|
56
|
|
Superitendent Engineer
|
RD - EIC-RW CE, RW CE
|
Transfer of RTI application dtd 29.9.2026 of Sri Debananda panda
|
|
-- |
|
57
|
|
Superitendent Engineer
|
RD - EIC-RW CE, RW CE
|
Transfer of RTI application dtd 18.09.2026
|
|
-- |
|
58
|
|
Executive Engineer
|
RD - EIC-RW CE, RW CE
|
Requisition of funds for DGPS Survey, Map preparation, and submission for online processing of thernforest diversion proposal for the road under the MMSY-CUVDA Scheme.
|
|
-- |
|
59
|
|
Superitendent Engineer
|
RD - Chief Engineer, Plan Roads, RW CE
|
Improvement to Dadang to Srigundi
|
|
-- |
|
60
|
|
Superitendent Engineer
|
RD - Chief Engineer, Schemes, RW CE
|
Improvement to Dadang to Srigundi
|
|
-- |
|
61
|
|
Superitendent Engineer
|
RD - Chief Engineer, PMGSY, RW CE
|
Improvement to road and CD works under PMGSY Package no OR-25-623
|
|
-- |
|
62
|
|
Superitendent Engineer
|
RD - Chief Engineer, PMGSY, RW CE
|
Regarding Technical evaluation
|
|
-- |
|
63
|
|
Superitendent Engineer
|
RD - Chief Engineer, PMGSY, RW CE
|
Improvement to road and CD works under PMGSY Package no OR-25-596
|
|
-- |
|
64
|
|
Superitendent Engineer
|
RD - Chief Engineer, PMGSY, RW CE
|
Improvement to road and CD works under PMGSY Package no OR-25-594
|
|
-- |
|
65
|
|
Superitendent Engineer
|
RD - Chief Engineer, PMGSY, RW CE
|
Improvement to road and CD works under PMGSY Package no OR-25-589
|
|
-- |
|
66
|
|
Superitendent Engineer
|
RD - Chief Engineer, PMGSY, RW CE
|
Improvement to road and CD works under PMGSY Package no OR-25-588
|
|
-- |
|
67
|
|
Superitendent Engineer
|
RD - Chief Engineer, PMGSY, RW CE
|
Improvement to road and CD works under PMGSY Package no OR-25-587
|
|
-- |
|
68
|
|
Superitendent Engineer
|
RD - Chief Engineer, PMGSY, RW CE
|
Improvement to road and CD works under PMGSY Package no OR-25-586
|
|
-- |
|
69
|
|
Superitendent Engineer
|
RD - Chief Engineer, PMGSY, RW CE
|
Improvement to road and CD works under PMGSY Package no OR-25-584
|
|
-- |
|
70
|
|
Superitendent Engineer
|
RD - Chief Engineer, PMGSY, RW CE
|
Improvement to road and CD works under PMGSY Package no OR-25-507
|
|
-- |
|
71
|
|
Superitendent Engineer
|
RD - Chief Engineer, PMGSY, RW CE
|
Improvement to road and CD works under PMGSY Package no OR-25-506
|
|
-- |
|
72
|
|
Superitendent Engineer
|
RD - Chief Engineer, PMGSY, RW CE
|
Improvement to PMGSY Package No OR-25-604
|
|
-- |
|
73
|
|
Superitendent Engineer
|
RD - Chief Engineer, PMGSY, RW CE
|
Improvement to PMGSY Package No OR-25-592
|
|
-- |
|
74
|
|
Superitendent Engineer
|
RD - Chief Engineer, PMGSY, RW CE
|
Improvement to PMGSY Package No OR-25-547
|
|
-- |
|
75
|
|
Superitendent Engineer
|
RD - Chief Engineer, PMGSY, RW CE
|
Improvement to PMGSY Package No OR-25-580
|
|
-- |
|
76
|
|
Superitendent Engineer
|
RD - Chief Engineer, PMGSY, RW CE
|
Improvement to PMGSY Package No OR-25-528
|
|
-- |
|
77
|
|
Superitendent Engineer
|
RD - Chief Engineer, PMGSY, RW CE
|
Improvement to PMGSY Package No OR-25-570
|
|
-- |
|
78
|
|
Superitendent Engineer
|
RD - Chief Engineer, PMGSY, RW CE
|
Improvement to PMGSY Package No OR-25-530
|
|
-- |
|
79
|
|
Superitendent Engineer
|
RD - Chief Engineer, PMGSY, RW CE
|
Improvement to PMGSY Package No OR-25-505
|
|
-- |
|
80
|
|
Superitendent Engineer
|
RD - EIC-RW CE, RW CE
|
Information regarding sunserviceable Govt Vehicle road
|
|
-- |
|
81
|
|
Supt. Engineer
|
RD-SE Quality control, RW CE
|
Submission of Plugging Proposal for fixation of founding RL of Pier Well-01 (P-01 ) for the work:-Construction of Bridge over Ichha Nallah on Chhatenpali to Gamardihi Road under SBY scheme in the District of Sundargarh for the year 2022-23.
|
|
-- |
|
82
|
|
Supt. Engineer
|
SE Design, RW CE
|
Submission of Plugging Proposal for fixation of founding RL of Pier Well-01 (P-01 ) for the work:-Construction of Bridge over Ichha Nallah on Chhatenpali to Gamardihi Road under SBY scheme in the District of Sundargarh for the year 2022-23.
|
|
-- |
|
83
|
|
Superitendent Engineer
|
RD - EIC-RW CE, RW CE
|
Intimation of revised project proposal approval
|
|
-- |
|
84
|
|
Superitendent Engineer
|
RD - Chief Engineer, Plan Roads, RW CE
|
Construction of HL bridge over Ghodahada nalah
|
|
-- |
|
85
|
|
Superitendent Engineer
|
RD - Chief Engineer, Schemes, RW CE
|
Construction of HL bridge over Ghodahada nalah
|
|
-- |
|
86
|
|
Executive Engineer
|
RD - Chief Engineer-I, RW CE
|
Requirement of funds of ongoing Bridge project
|
|
-- |
|
87
|
|
Executive Engineer
|
Chief Engineer, Building and Bridge, RW CE
|
Requirement of funds of ongoing Bridge project
|
|
-- |
|
88
|
|
Executive Engineer
|
Chief Engineer, Building and Bridge, RW CE
|
Requirement of funds of ongoing Bridge project
|
|
-- |
|
89
|
|
Executive Engineer
|
RD - Chief Engineer-I, RW CE
|
Requirement of funds of ongoing Bridge project
|
|
-- |
|
90
|
|
Executive Engineer
|
RD - Chief Engineer-I, RW CE
|
Requirement of funds
|
|
-- |
|
91
|
|
Executive Engineer
|
RD - Chief Engineer, Buildings, RW CE
|
Requirement of funds
|
|
-- |
|
92
|
|
Executive Engineer
|
Chief Engineer, Building and Bridge, RW CE
|
Requirement of funds
|
|
-- |
|
93
|
|
Executive Engineer
|
RD - EIC-RW CE, RW CE
|
Submission of information on pending pension cases for Group-C and Group-D for the month ofrnOctober-2026
|
|
-- |
|
94
|
|
Executive Engineer
|
RD - Executive Engineer Establishment, RW CE
|
Submission of information on pending pension cases for Group-C and Group-D for the month ofrnOctober-2026
|
|
-- |
|
95
|
|
Executive Engineer
|
RD - Executive Engineer Establishment, RW CE
|
Submission of monthly staff position of different grades of posts starting from Group-A tornGroup-D on regular establishment under this Division for the month of October-2026
|
|
-- |
|
96
|
|
Executive Engineer
|
RD - EIC-RW CE, RW CE
|
Submission of monthly staff position of different grades of posts starting from Group-A tornGroup-D on regular establishment under this Division for the month of October-2026
|
|
-- |
|
97
|
|
Executive Engineer
|
RD - EIC-RW CE, RW CE
|
Submission of information on pending disciplinary proceeding against Gort. Servants inrnHRMS portal and review of pendency for the month of october-2026
|
|
-- |
|
98
|
|
Executive Engineer
|
RD - Executive Engineer Establishment, RW CE
|
Submission of information on pending disciplinary proceeding against Gort. Servants inrnHRMS portal and review of pendency for the month of october-2026
|
|
-- |
|
99
|
|
Executive Engineer
|
RD - EIC-RW CE, RW CE
|
Submission of information on extent of damaged due to very server Cylon 'ARNAB' & consequent heavy rain/flood-2026.
|
|
-- |
|
100
|
|
Superitendent Engineer
|
RD - Chief Engineer, Schemes, RW CE
|
Improvement to Purusottampur Ranigam Sikula road
|
|
-- |
|
101
|
|
Superitendent Engineer
|
RD - Chief Engineer, Plan Roads, RW CE
|
Improvement to Purusottampur Ranigam Sikula road
|
|
-- |
|
102
|
|
Executive Engineer
|
RD - Chief Engineer, Buildings, RW CE
|
Regarding submission of EOT application for the work.
|
|
-- |
|
103
|
|
Executive Engineer
|
RD - Chief Engineer, Buildings, RW CE
|
Regarding submission of EOT application for the work.
|
|
-- |
|
104
|
|
RW SE CUTTACK
|
RD - Chief Engineer, Plan Roads, RW CE
|
Show cause of contractors regarding prima facie indications of Cartelization, Collusive and Coordinated Bidding, and Anti-Competitive Practices in Plan Road tenders
|
|
-- |
|
105
|
|
RW SE CUTTACK
|
RD - Chief Engineer, Plan Roads, RW CE
|
Show cause of contractors regarding prima facie indications of Cartelization, Collusive and Coordinated Bidding, and Anti-Competitive Practices in Plan Road tenders
|
|
-- |
|
106
|
|
RW SE CUTTACK
|
RD - Chief Engineer, Plan Roads, RW CE
|
Show cause of contractors regarding prima facie indications of Cartelization, Collusive and Coordinated Bidding, and Anti-Competitive Practices in Plan Road tenders
|
|
-- |
|
107
|
|
RW SE CUTTACK
|
RD - Chief Engineer, Plan Roads, RW CE
|
Show cause of contractors regarding prima facie indications of Cartelization, Collusive and Coordinated Bidding, and Anti-Competitive Practices in Plan Road tenders
|
|
-- |
|
108
|
|
RW SE CUTTACK
|
RD - Chief Engineer, Plan Roads, RW CE
|
Show cause of contractors regarding prima facie indications of Cartelization, Collusive and Coordinated Bidding, and Anti-Competitive Practices in Plan Road tenders
|
|
-- |
|
109
|
|
RW SE CUTTACK
|
RD - Chief Engineer, Plan Roads, RW CE
|
Show cause of contractors regarding prima facie indications of Cartelization, Collusive and Coordinated Bidding, and Anti-Competitive Practices in Plan Road tenders
|
|
-- |
|
110
|
|
RW SE CUTTACK
|
RD - Chief Engineer, Plan Roads, RW CE
|
Show cause of contractors regarding prima facie indications of Cartelization, Collusive and Coordinated Bidding, and Anti-Competitive Practices in Plan Road tenders
|
|
-- |
|
111
|
|
RW SE CUTTACK
|
RD - Chief Engineer, Plan Roads, RW CE
|
Show cause of contractors regarding prima facie indications of Cartelization, Collusive and Coordinated Bidding, and Anti-Competitive Practices in Plan Road tenders
|
|
-- |
|
112
|
|
RW SE CUTTACK
|
RD - Chief Engineer, Plan Roads, RW CE
|
Show cause of contractors regarding prima facie indications of Cartelization, Collusive and Coordinated Bidding, and Anti-Competitive Practices in Plan Road tenders
|
|
-- |
|
113
|
|
RW SE CUTTACK
|
RD - Chief Engineer, Plan Roads, RW CE
|
Show cause of contractors regarding prima facie indications of Cartelization, Collusive and Coordinated Bidding, and Anti-Competitive Practices in Plan Road tenders
|
|
-- |
|
114
|
|
RW SE CUTTACK
|
RD - Chief Engineer, Plan Roads, RW CE
|
Show cause of contractors regarding prima facie indications of Cartelization, Collusive and Coordinated Bidding, and Anti-Competitive Practices in Plan Road tenders
|
|
-- |
|
115
|
|
RW SE CUTTACK
|
RD - Chief Engineer, Plan Roads, RW CE
|
Show cause of contractors regarding prima facie indications of Cartelization, Collusive and Coordinated Bidding, and Anti-Competitive Practices in Plan Road tenders
|
|
-- |
|
116
|
|
RW SE CUTTACK
|
RD - Chief Engineer, Plan Roads, RW CE
|
Show cause of contractors regarding prima facie indications of Cartelization, Collusive and Coordinated Bidding, and Anti-Competitive Practices in Plan Road tenders
|
|
-- |
|
117
|
|
RW SE CUTTACK
|
RD - Chief Engineer, Plan Roads, RW CE
|
Show cause of contractors regarding prima facie indications of Cartelization, Collusive and Coordinated Bidding, and Anti-Competitive Practices in Plan Road tenders
|
|
-- |
|
118
|
|
RW SE CUTTACK
|
RD - Chief Engineer, Plan Roads, RW CE
|
Show cause of contractors regarding prima facie indications of Cartelization, Collusive and Coordinated Bidding, and Anti-Competitive Practices in Plan Road tenders
|
|
-- |
|
119
|
|
RW SE CUTTACK
|
RD - Chief Engineer, Plan Roads, RW CE
|
Show cause of contractors regarding prima facie indications of Cartelization, Collusive and Coordinated Bidding, and Anti-Competitive Practices in Plan Road tenders
|
|
-- |
|
120
|
|
RW SE CUTTACK
|
RD - Chief Engineer, Plan Roads, RW CE
|
Show cause of contractors regarding prima facie indications of Cartelization, Collusive and Coordinated Bidding, and Anti-Competitive Practices in Plan Road tenders
|
|
-- |
|
121
|
|
RW SE CUTTACK
|
RD - Chief Engineer, Plan Roads, RW CE
|
Show cause of contractors regarding prima facie indications of Cartelization, Collusive and Coordinated Bidding, and Anti-Competitive Practices in Plan Road tenders
|
|
-- |
|
122
|
|
RW SE CUTTACK
|
RD - Chief Engineer, Plan Roads, RW CE
|
Show cause of contractors regarding prima facie indications of Cartelization, Collusive and Coordinated Bidding, and Anti-Competitive Practices in Plan Road tenders
|
|
-- |
|
123
|
|
RW SE CUTTACK
|
RD - Chief Engineer, Plan Roads, RW CE
|
Show cause of contractors regarding prima facie indications of Cartelization, Collusive and Coordinated Bidding, and Anti-Competitive Practices in Plan Road tenders
|
|
-- |
|
124
|
|
RW SE CUTTACK
|
RD - Chief Engineer, Plan Roads, RW CE
|
Show cause of contractors regarding prima facie indications of Cartelization, Collusive and Coordinated Bidding, and Anti-Competitive Practices in Plan Road tenders
|
|
-- |
|
125
|
|
RW SE CUTTACK
|
RD - Chief Engineer, Plan Roads, RW CE
|
Show cause of contractors regarding prima facie indications of Cartelization, Collusive and Coordinated Bidding, and Anti-Competitive Practices in Plan Road tenders
|
|
-- |
|
126
|
|
Executive Engineer,RW,Nayagarh
|
RD - EIC-RW CE, RW CE
|
Submission of served order copy along with joining report in favour of Sri Keshaba Subudhi, J.E.R.W.Section, Bhapur
|
|
-- |
|
127
|
|
Executive Engineer,RW,Nayagarh
|
RD - Executive Engineer Establishment, RW CE
|
Submission of served order copy along with joining report in favour of Sri Keshaba Subudhi, J.E.R.W.Section, Bhapur
|
|
-- |
|
128
|
|
Executive Engineer,RW,Nayagarh
|
RD - Executive Engineer-Establishment & allied works, RW CE
|
Submission of served order copy along with joining report in favour of Sri Keshaba Subudhi, J.E.R.W.Section, Bhapur
|
|
-- |
|
129
|
|
RW SE CUTTACK
|
RD - Chief Engineer, Plan Roads, RW CE
|
Show cause of contractors regarding prima facie indications of Cartelization, Collusive and Coordinated Bidding, and Anti-Competitive Practices in Plan Road tenders
|
|
-- |
|
130
|
|
RW SE CUTTACK
|
RD - Chief Engineer, Plan Roads, RW CE
|
Show cause of contractors regarding prima facie indications of Cartelization, Collusive and Coordinated Bidding, and Anti-Competitive Practices in Plan Road tenders
|
|
-- |
|
131
|
|
Executive Engineer
|
RD - Chief Engineer, Plan Roads, RW CE
|
Release of Allotment / LC under head of account 28-5054-04-337-11230-37342-073-MMSY TRIP.
|
|
-- |
|
132
|
|
RW SE KEONJHAR
|
RD - Chief Engineer, Buildings, RW CE
|
Clarification on Abnormally low bid for the following work:- (1) Construction of H.L Bridge over Local Nallah at 7th km on PWD Road to Kankana Road for the year 2026-27.
|
|
-- |
|
133
|
|
RW SE KEONJHAR
|
RD - Chief Engineer, Buildings, RW CE
|
Clarification on Abnormally low bid for the following work:- (1) Construction of H.L Bridge over Dandamara Nallah on Pokharia to Bankia Road for the year 2026-27.
|
|
-- |
|
134
|
|
Executive Engineer
|
SE Design, RW CE
|
Re submission of Hydraulic Particulars for Construction of Proposed Bridge over Gobari Nallaha at TarapadaKharianta (KB Dandia GP Suniti Road)
|
|
-- |
|
135
|
|
Executive Engineer
|
RD - Chief Engineer, Buildings, RW CE
|
Re submission of Hydraulic Particulars for Construction of Proposed Bridge over Gobari Nallaha at TarapadaKharianta (KB Dandia GP Suniti Road)
|
|
-- |
|
136
|
|
Executive Engineer
|
Chief Engineer, Building and Bridge, RW CE
|
Re submission of Hydraulic Particulars for Construction of Proposed Bridge over Gobari Nallaha at TarapadaKharianta (KB Dandia GP Suniti Road)
|
|
-- |
|
137
|
|
Executive Engineer
|
RD - EIC-RW CE, RW CE
|
Submission of CWA proposal of Mahakalpada Assembly Constituency for the financial year 2026-2027.
|
|
-- |
|
138
|
|
Executive Engineer
|
RD - EIC-RW CE, RW CE
|
Post abandonment of Sri Harish Jena, Junior Engineer (C)
|
|
-- |
|
139
|
|
Executive Engineer
|
Chief Engineer, Building and Bridge, RW CE
|
E’ PROCUREMENT NOTICE NO. RWD / KPD-08 / 2026-27
|
|
-- |
|
140
|
|
Executive Engineer
|
RD - EIC-RW CE, RW CE
|
E’ PROCUREMENT NOTICE NO. RWD / KPD-08 / 2026-27
|
|
-- |
|
141
|
|
Executive Engineer
|
Chief Engineer, Building and Bridge, RW CE
|
E’ PROCUREMENT NOTICE NO. RWD / KPD-09 / 2026-27
|
|
-- |
|
142
|
|
Executive Engineer
|
RD - EIC-RW CE, RW CE
|
E’ PROCUREMENT NOTICE NO. RWD / KPD-09 / 2026-27
|
|
-- |
|
143
|
|
Executive Engineer
|
RD - Chief Engineer, Buildings, RW CE
|
Estimate for Construction of RW Sub Division Office Building at Marsaghai for A/A
|
|
-- |
|
144
|
|
Executive Engineer
|
Chief Engineer, Building and Bridge, RW CE
|
Estimate for Construction of RW Sub Division Office Building at Marsaghai for A/A
|
|
-- |
|
145
|
|
Executive Engineer
|
RD - EIC-RW CE, RW CE
|
OFFICE ORDER FOR CANCELATION OF TENDER
|
|
-- |
|
146
|
|
Executive Engineer
|
RD - Chief Engineer, Plan Roads, RW CE
|
Requirement of funds under (TRIP) for the year 2026-27.
|
|
-- |
|
147
|
|
Executive Engineer
|
RD - EIC-RW CE, RW CE
|
Requirement of funds under (TRIP) for the year 2026-27.
|
|
-- |
|
148
|
|
FAA NUAPADA
|
RD - Empowered Officer OSRRA, RW CE
|
Requisition fro Authorisation of 5 year completed PMGSY Roads through Post DLP-Emarg Module under Center Incentive of R.W.Division, Nuapada
|
|
-- |
|
149
|
|
FAA NUAPADA
|
RD - EIC-RW CE, RW CE
|
Requisition fro Authorisation of 5 year completed PMGSY Roads through Post DLP-Emarg Module under Center Incentive of R.W.Division, Nuapada
|
|
-- |
|
150
|
|
FAA NUAPADA
|
RD - Chief Engineer, PMGSY, RW CE
|
Requisition fro Authorisation of 5 year completed PMGSY Roads through Post DLP-Emarg Module under Center Incentive of R.W.Division, Nuapada
|
|
-- |
|
151
|
|
Executive Engineer
|
RD - Chief Engineer, Plan Roads, RW CE
|
Requirement of funds under CMRL for the year 2026-27
|
|
-- |
|
152
|
|
Executive Engineer
|
RD - EIC-RW CE, RW CE
|
Requirement of funds under CMRL for the year 2026-27
|
|
-- |
|
153
|
|
Executive Engineer
|
RD - EIC-RW CE, RW CE
|
Submission of damage report during Cyclone Arnab October 2026.
|
|
-- |
|
154
|
|
Executive Engineer
|
Chief Engineer, Building and Bridge, RW CE
|
Revised requirement for allotment of funds to the tune of Rs.64.00 lakhs for the work “construction of Bridge over River Harabhangi at 3rd Km on Bamadeipada to Gurujhuli PS Road in the district of Gajapati under BSY for the year 2022-23”.
|
|
-- |
|
155
|
|
Executive Engineer
|
Chief Engineer, Building and Bridge, RW CE
|
Submission of closure proposal for the work Construction of Multi Purpose Hall Near Anukul Mandir (500 capacity) under Jaleshwar Block for the year 2023-24 relocated site at Padhiarypur near Jaleshwar Court.
|
|
-- |
|
156
|
|
Executive Engineer
|
Chief Engineer, Building and Bridge, RW CE
|
Submission of copy of affidevit for stay for further proceeding in execution petition No. 40 of 2026 against Arbitral Award dt. 04.03.2025 passed in Arbitration Proceeding case No. 06 of 2022 against ARBP No. 42/2020 filed by M/S Das Construction vrs State of Odisha and
|
|
-- |
|
157
|
|
Executive Engineer
|
Chief Engineer, Building and Bridge, RW CE
|
Submission of copy of affidevit for stay for further proceeding in execution petition No. 39 of 2026 against Arbitral Award dt. 04.03.2025 passed in Arbitration Proceeding case No. 05 of 2022 against ARBP No. 41/2020 filed by M/S Das Construction vrs State of Odisha and
|
|
-- |
|
158
|
|
Executive Engineer
|
Chief Engineer, Building and Bridge, RW CE
|
Requirement of funds
|
|
-- |
|
159
|
|
Executive Engineer
|
RD - EIC-RW CE, RW CE
|
pension case of Nilamani Purohit, Asst. Engineer retired Missing since 2007
|
|
-- |
|
160
|
|
Executive Engineer
|
Chief Engineer, Building and Bridge, RW CE
|
Requirement of funds
|
|
-- |
|
161
|
|
RW SE BALESWAR
|
RD - Executive Engineer- Bridge Design, RW CE
|
Bid Identification No. CCE-BLS-NCB-16 of 2026-27
|
|
-- |
|
162
|
|
RW SE BALESWAR
|
Chief Engineer, Building and Bridge, RW CE
|
Bid Identification No. CCE-BLS-NCB-16 of 2026-27
|
|
-- |
|
163
|
|
RW SE BALESWAR
|
RD-Executive Engineer-Plan Road, RW CE
|
Bid Identification No. CCE-BLS-NCB-16 of 2026-27
|
|
-- |
|
164
|
|
RW SE BALESWAR
|
RD - EIC-RW CE, RW CE
|
Bid Identification No. CCE-BLS-NCB-16 of 2026-27
|
|
-- |
|
165
|
|
RW SE BALESWAR
|
RD - Chief Engineer IV, RW CE
|
Bid Identification No. CCE-BLS-NCB-16 of 2026-27
|
|
-- |
|
166
|
|
RW SE BALESWAR
|
RD - Executive Engineer- Monitoring, RW CE
|
Bid Identification No. CCE-BLS-NCB-16 of 2026-27
|
|
-- |
|
167
|
|
RW SE BALESWAR
|
RD - Executive Engineer Establishment, RW CE
|
Bid Identification No. CCE-BLS-NCB-16 of 2026-27
|
|
-- |
|
168
|
|
RW SE BALESWAR
|
RD - Chief Engineer-I, RW CE
|
Bid Identification No. CCE-BLS-NCB-16 of 2026-27
|
|
-- |
|
169
|
|
RW SE BALESWAR
|
RD - Empowered Officer OSRRA, RW CE
|
Bid Identification No. CCE-BLS-NCB-16 of 2026-27
|
|
-- |
|
170
|
|
RW SE BALESWAR
|
RD - Chief Engineer, PMGSY, RW CE
|
Bid Identification No. CCE-BLS-NCB-16 of 2026-27
|
|
-- |
|
171
|
|
RW SE BALESWAR
|
RD - Chief Engineer, Buildings, RW CE
|
Bid Identification No. CCE-BLS-NCB-16 of 2026-27
|
|
-- |
|
172
|
|
RW SE BALESWAR
|
RD - Executive Engineer-Rural Building, RW CE
|
Bid Identification No. CCE-BLS-NCB-16 of 2026-27
|
|
-- |
|
173
|
|
RW SE BALESWAR
|
SE Design, RW CE
|
Bid Identification No. CCE-BLS-NCB-16 of 2026-27
|
|
-- |
|
174
|
|
RW SE BALESWAR
|
RD - Executive Engineer-Establishment & allied works, RW CE
|
Bid Identification No. CCE-BLS-NCB-16 of 2026-27
|
|
-- |
|
175
|
|
RW SE BALESWAR
|
RD - Chief Engineer-III, RW CE
|
Bid Identification No. CCE-BLS-NCB-16 of 2026-27
|
|
-- |
|
176
|
|
RW SE BALESWAR
|
RD - S.E. Building, RW CE
|
Bid Identification No. CCE-BLS-NCB-16 of 2026-27
|
|
-- |
|
177
|
|
RW SE BALESWAR
|
RD - Executive Engineer-I, RW CE
|
Bid Identification No. CCE-BLS-NCB-16 of 2026-27
|
|
-- |
|
178
|
|
RW SE BALESWAR
|
RD - Chief Engineer, Plan Roads, RW CE
|
Bid Identification No. CCE-BLS-NCB-16 of 2026-27
|
|
-- |
|
179
|
|
RW SE BALESWAR
|
RD - Chief Engineer-II, RW CE
|
Bid Identification No. CCE-BLS-NCB-16 of 2026-27
|
|
-- |
|
180
|
|
RW SE BALESWAR
|
RD-Executive Engineer-ADB, RW CE
|
Bid Identification No. CCE-BLS-NCB-16 of 2026-27
|
|
-- |
|
181
|
|
RW SE BALESWAR
|
RD-Executive Engineer-Quality Control, RW CE
|
Bid Identification No. CCE-BLS-NCB-16 of 2026-27
|
|
-- |
|
182
|
|
RW SE BALESWAR
|
RD-Executive Engineer-PMGSY, RW CE
|
Bid Identification No. CCE-BLS-NCB-16 of 2026-27
|
|
-- |
|
183
|
|
RW SE BALESWAR
|
RD-Executive Engineer-Scheme, RW CE
|
Bid Identification No. CCE-BLS-NCB-16 of 2026-27
|
|
-- |
|
184
|
|
RW SE BALESWAR
|
RD - Sr. D.A.O, RW CE
|
Bid Identification No. CCE-BLS-NCB-16 of 2026-27
|
|
-- |
|
185
|
|
RW SE BALESWAR
|
RD-SE Quality control, RW CE
|
Bid Identification No. CCE-BLS-NCB-16 of 2026-27
|
|
-- |
|
186
|
|
RW SE BALESWAR
|
RD - RCTRC, RW CE
|
Bid Identification No. CCE-BLS-NCB-16 of 2026-27
|
|
-- |
|
187
|
|
RW SE BALESWAR
|
RD - Asst. Executive Engineer Road, RW CE
|
Bid Identification No. CCE-BLS-NCB-16 of 2026-27
|
|
-- |
|
188
|
|
RW SE BALESWAR
|
RD - Chief Engineer, Schemes, RW CE
|
Bid Identification No. CCE-BLS-NCB-16 of 2026-27
|
|
-- |
|
189
|
|
RD - SE, Banspal
|
RD - EIC-RW CE, RW CE
|
Requirement of funds for Road Works under DMF.
|
|
-- |
|
190
|
|
Executive Engineer
|
RD - Chief Engineer, Plan Roads, RW CE
|
Request for Site inspection regarding remedial measures for damaged portion of roads under SDMF.
|
|
-- |
|
191
|
|
Executive Engineer
|
RD - Chief Engineer, PMGSY, RW CE
|
Requisition of Bank Authorisation for release of Security Deposit and Performances Security Deposit of PMGSY Work.
|
|
-- |
|
192
|
|
Executive Engineer,
|
RD - EIC-RW CE, RW CE
|
Alleged irregularities and errors in the list of DLRs published by the Chief Engineer, Rural Works Odisha, Bhubaneswar.
|
|
-- |
|
193
|
|
Executive Engineer
|
RD - EIC-RW CE, RW CE
|
Requisition of funds under OSRRA Administrative expenses Fund forrnpayment of Reconciliation of PMGSY Accounts bill of CharteredrnAccountant.
|
|
-- |
|
194
|
|
Executive Engineer
|
RD - Chief Engineer, PMGSY, RW CE
|
Requisition of funds under OSRRA Administrative expenses Fund forrnpayment of Reconciliation of PMGSY Accounts bill of CharteredrnAccountant.
|
|
-- |
|
195
|
|
Executive Engineer
|
RD - EIC-RW CE, RW CE
|
Requisition of Fund for payment of OSRRA Administrative bill for the month of November-2026
|
|
-- |
|
196
|
|
Executive Engineer
|
RD - Chief Engineer, PMGSY, RW CE
|
Requisition of Fund for payment of OSRRA Administrative bill for the month of November-2026
|
|
-- |
|
197
|
|
Executive Engineer
|
RD - EIC-RW CE, RW CE
|
Time petition for Civil_Suit (III) No.173/2026 filed by Er. Biswajit samantaray vrs-State of Odisha and Others.
|
|
-- |
|
198
|
|
Executive Engineer
|
RD - EIC-RW CE, RW CE
|
Your R.T.I Application on dtd.02.09.2026 received by this office on 12.10.2026
|
|
-- |
|
199
|
|
Executive Engineer
|
RD - EIC-RW CE, RW CE
|
Your R.T.I Application on dtd.02.09.2026 received by this office on 12.10.2026
|
|
-- |
|
200
|
|
Executive Engineer
|
RD - Chief Engineer, Buildings, RW CE
|
Tender-Online -BBSR 21 / 2026-27
|
|
-- |
|
201
|
|
Executive Engineer
|
RD - Chief Engineer, Plan Roads, RW CE
|
Tender-Online -BBSR 21 / 2026-27
|
|
-- |
|
202
|
|
Executive Engineer
|
RD - Chief Engineer, PMGSY, RW CE
|
Tender-Online -BBSR 21 / 2026-27
|
|
-- |
|
203
|
|
Executive Engineer
|
RD - Chief Engineer, Schemes, RW CE
|
Tender-Online -BBSR 21 / 2026-27
|
|
-- |
|
204
|
|
Executive Engineer
|
RD - EIC-RW CE, RW CE
|
Tender-Online -BBSR 21 / 2026-27
|
|
-- |
|
205
|
|
Executive Engineer
|
RD - Chief Engineer, PMGSY, RW CE
|
Tender-Online -BBSR 20 / 2026-27
|
|
-- |
|
206
|
|
Executive Engineer
|
RD - Chief Engineer, Buildings, RW CE
|
Tender-Online -BBSR 20 / 2026-27
|
|
-- |
|
207
|
|
Executive Engineer
|
Chief Engineer, Building and Bridge, RW CE
|
Tender-Online -BBSR 20 / 2026-27
|
|
-- |
|
208
|
|
Executive Engineer
|
RD - Chief Engineer, Schemes, RW CE
|
Tender-Online -BBSR 20 / 2026-27
|
|
-- |
|
209
|
|
Executive Engineer
|
RD - EIC-RW CE, RW CE
|
Tender-Online -BBSR 20 / 2026-27
|
|
-- |
|
210
|
|
Executive Engineer
|
RD - Chief Engineer, PMGSY, RW CE
|
Requisition of funds under OSRRA Administrative expenses Fund for the month of October-2026.
|
|
-- |
|
211
|
|
Executive Engineer
|
RD - EIC-RW CE, RW CE
|
Requisition of funds under OSRRA Administrative expenses Fund for the month of October-2026.
|
|
-- |
|
212
|
|
Executive Engineer
|
Chief Engineer, Building and Bridge, RW CE
|
Feasibility report for new bridge proposal for 2027-28 under Chikiti Constituency Assembly.
|
|
-- |
|
213
|
|
Executive Engineer
|
Chief Engineer, Building and Bridge, RW CE
|
Requirement of funds under D.no. 28-5054-80-796-0186-37257.
|
|
-- |
|
214
|
|
Executive Engineer
|
RD - EIC-RW CE, RW CE
|
Submission of report on damages due to heavy Rain/Flood due to Cyclone Arnab
|
|
-- |
|
215
|
|
Executive Engineer
|
RD - EIC-RW CE, RW CE
|
Online Tender-13/SERWD-II/2026-27
|
|
-- |
|
216
|
|
Executive Engineer
|
Chief Engineer, Building and Bridge, RW CE
|
Online Tender-13/SERWD-II/2026-27
|
|
-- |
|
217
|
|
Executive Engineer
|
RD - Chief Engineer, Plan Roads, RW CE
|
Placement of funds for shifting and erecting of 11 KV Jhadankuli feeder from work site of Improvement to Nh-217 to Satakutuni via Badagumula road under MMSY-Improvement to existing RD road for 2024-25.30P1/2025-26
|
|
-- |
|
218
|
|
Executive Engineer
|
Chief Engineer, Building and Bridge, RW CE
|
Placement of funds for shifting and erecting of 11 KV linefrom work site of Construction of HL bridge over Bahuda on BAdagaon to Kharanipada road under inter district ,inter block connectivity scheme for the year 2021-22.
|
|
-- |
|
219
|
|
Executive Engineer
|
Chief Engineer, Building and Bridge, RW CE
|
Requirement of funds for building works different department under programme expenditure for the year 2026-27 (Requirement of Health Department).
|
|
-- |