1
|
|
Executive Engineer
|
RD - EIC-RW CE, RW CE
|
Submission of DPR for the work Construction of H.L. bridge over Lingipur Distributary atrnJaripatana (Jaripatana Radhakanta Temple to Lakheswar Temple canal road up to MallickrnSahi) Road in the district of Khordha.
|
|
-- |
|
2
|
|
Executive Engineer
|
Chief Engineer, Building and Bridge, RW CE
|
Submission of DPR for the work Construction of H.L. bridge over Lingipur Distributary atrnJaripatana (Jaripatana Radhakanta Temple to Lakheswar Temple canal road up to MallickrnSahi) Road in the district of Khordha.
|
|
-- |
|
3
|
|
Executive Engineer
|
Chief Engineer, Building and Bridge, RW CE
|
Submission of Hydraulic particular and Soil Investigation Report for the work:-Constructionrnof Bridge over Kantabania Nallah at 1.50 kin on Kalupada Ghat to Tarimi road in the District of Khordha.
|
|
-- |
|
4
|
|
Executive Engineer
|
RD - EIC-RW CE, RW CE
|
Submission of Hydraulic particular and Soil Investigation Report for the work:-Constructionrnof Bridge over Kantabania Nallah at 1.50 kin on Kalupada Ghat to Tarimi road in the District of Khordha.
|
|
-- |
|
5
|
|
Executive Engineer
|
RD - EIC-RW CE, RW CE
|
Submission of detailed estimate for the following work to be taken up underrnMMSY-Improvement, to Existing RD Road scheme in the Dist. of Khordha for thernyear 2026-27
|
|
-- |
|
6
|
|
Executive Engineer
|
RD - Chief Engineer, Plan Roads, RW CE
|
Submission of detailed estimate for the following work to be taken up underrnMMSY-Improvement, to Existing RD Road scheme in the Dist. of Khordha for thernyear 2026-27
|
|
-- |
|
7
|
|
Executive Engineer
|
RD - EIC-RW CE, RW CE
|
Requisition of funds for the work - Construction and Maintenance of Banamalipur to Balanga road under for the year 2018-19 in the Dist of Khordha underrnKhordha constituency
|
|
-- |
|
8
|
|
Executive Engineer
|
RD - Chief Engineer, PMGSY, RW CE
|
TCN No. 15/2026-27of S.E. R.W. Divn. BBSR
|
|
-- |
|
9
|
|
Executive Engineer
|
RD - Chief Engineer, Buildings, RW CE
|
TCN No. 15/2026-27of S.E. R.W. Divn. BBSR
|
|
-- |
|
10
|
|
Executive Engineer
|
Chief Engineer, Building and Bridge, RW CE
|
TCN No. 15/2026-27of S.E. R.W. Divn. BBSR
|
|
-- |
|
11
|
|
Executive Engineer
|
RD - EIC-RW CE, RW CE
|
TCN No. 15/2026-27of S.E. R.W. Divn. BBSR
|
|
-- |
|
12
|
|
Executive Engineer
|
RD - EIC-RW CE, RW CE
|
Submission of requisition of fund for payment of work under the Head of Account-rn12-4210-DS-02-110-3261-18078-119
|
|
-- |
|
13
|
|
Executive Engineer
|
Chief Engineer, Building and Bridge, RW CE
|
Submission of requisition of fund for payment of work under the Head of Account-rn12-4210-DS-02-110-3261-18078-119
|
|
-- |
|
14
|
|
Executive Engineer
|
Chief Engineer, Building and Bridge, RW CE
|
Requisition of Funds for Bridge works
|
|
-- |
|
15
|
|
Executive Engineer
|
RD - EIC-RW CE, RW CE
|
Requisition of Funds for Bridge works
|
|
-- |
|
16
|
|
Executive Engineer
|
RD - EIC-RW CE, RW CE
|
OFFICE ORDER
|
|
-- |
|
17
|
|
Executive Engineer, R.W. Dvin.-I, Cuttack
|
Chief Engineer, Building and Bridge, RW CE
|
Cash transfer through IOTMS of Rs. 65706.00 for the work 'Construction of HL Bridgernover Sanagenguti on Cheda to Baula Road in the district Cuttack
|
|
-- |
|
18
|
|
Executive Engineer, R.W. Dvin.-I, Cuttack
|
RD - EIC-RW CE, RW CE
|
Cash transfer through IOTMS of Rs. 65706.00 for the work 'Construction of HL Bridgernover Sanagenguti on Cheda to Baula Road in the district Cuttack
|
|
-- |
|
19
|
|
Executive Engineer, R.W. Dvin.-I, Cuttack
|
RD - EIC-RW CE, RW CE
|
Requirement of allotment and authorization in IOTMS under the Head of Account 28-5054-80rn796-1230-37247-073.
|
|
-- |
|
20
|
|
Executive Engineer, R.W. Dvin.-I, Cuttack
|
RD - Chief Engineer, Plan Roads, RW CE
|
Requirement of allotment and authorization in IOTMS under the Head of Account 28-5054-80rn796-1230-37247-073.
|
|
-- |
|
21
|
|
Executive Engineer
|
Chief Engineer, Building and Bridge, RW CE
|
Format for requisition of funds for ongoing works under programme expenditure for the year 2026-27.
|
|
-- |
|
22
|
|
Executive Engineer
|
Chief Engineer, Building and Bridge, RW CE
|
Format for requisition of funds for ongoing works under programme expenditure for the year 2026-27.
|
|
-- |
|
23
|
|
Executive Engineer
|
Chief Engineer, Building and Bridge, RW CE
|
Requirement of funds for building works different department under programme expenditure for the year 2026-27. Requirement for Health Department
|
|
-- |
|
24
|
|
Executive Engineer
|
RD - Chief Engineer, Plan Roads, RW CE
|
Requirement of funds under D.no-28-5054-80-789-1230-37247-073-imp to existing RD road
|
|
-- |
|
25
|
|
PIO PURI
|
RD - EIC-RW CE, RW CE
|
RTI application of Sri Uma Sankar Sahu on Dtd.09.06.2026.
|
|
-- |
|
26
|
|
RW EE BALASORE - I
|
RD - Chief Engineer, Plan Roads, RW CE
|
Submission of Interim Deviation and Revised estimate for the work Constn. of NH-5 Chilapada road under MMSY in Balasore
|
|
-- |
|
27
|
|
RW EE BALASORE - I
|
Chief Engineer, Building and Bridge, RW CE
|
Request for preparation and supplying of slab design for constn of Bridge over Dubdubi Nallha on Lunkundi Kasafal gahamagadia via Sahua Chhak Ferry Ghat Road in Balasore
|
|
-- |
|
28
|
|
RW EE BALASORE - I
|
SE Design, RW CE
|
Request for preparation and supplying of slab design for constn of Bridge over Dubdubi Nallha on Lunkundi Kasafal gahamagadia via Sahua Chhak Ferry Ghat Road in Balasore
|
|
-- |
|
29
|
|
RW EE BALASORE - I
|
RD-SE Quality control, RW CE
|
Request for preparation and supplying of slab design for constn of Bridge over Dubdubi Nallha on Lunkundi Kasafal gahamagadia via Sahua Chhak Ferry Ghat Road in Balasore
|
|
-- |
|
30
|
|
RW EE BALASORE - I
|
RD - EIC-RW CE, RW CE
|
Request for preparation and supplying of slab design for constn of Bridge over Dubdubi Nallha on Lunkundi Kasafal gahamagadia via Sahua Chhak Ferry Ghat Road in Balasore
|
|
-- |
|
31
|
|
RW EE BALASORE - I
|
Chief Engineer, Building and Bridge, RW CE
|
Submission of Plan and Detailed estimate
|
|
-- |
|
32
|
|
RW EE BALASORE - I
|
RD - EIC-RW CE, RW CE
|
Substitute proposal under Impvt. to Existing RD road in place of CMRL during the year 2026-27
|
|
-- |
|
33
|
|
RW EE BALASORE - I
|
RD - Chief Engineer, Plan Roads, RW CE
|
Substitute proposal under Impvt. to Existing RD road in place of CMRL during the year 2026-27
|
|
-- |
|
34
|
|
RW EE BALASORE - I
|
RD - Chief Engineer, Plan Roads, RW CE
|
Requirement of funds for the work under D.No.28-5054-04-337-2161-37342-073-
|
|
-- |
|
35
|
|
RW EE BALASORE - I
|
RD - Chief Engineer, Plan Roads, RW CE
|
office order
|
|
-- |
|
36
|
|
RW EE BALASORE - I
|
RD - Chief Engineer, Plan Roads, RW CE
|
Requirement of funds for the work under D.No.28-5054-04-337-2161-37342-073-
|
|
-- |
|
37
|
|
RW EE BALASORE - I
|
RD - Chief Engineer, Plan Roads, RW CE
|
Office order
|
|
-- |
|
38
|
|
RW EE BALASORE - I
|
RD - Empowered Officer OSRRA, RW CE
|
Release of funds for the work- Constn. and Maintenance of road from under PMGSY programme fund under PMGSY PKG No.OR-02484/ PMGSY-III
|
|
-- |
|
39
|
|
RW EE BALASORE - I
|
RD - Chief Engineer, PMGSY, RW CE
|
Release of funds for the work- Constn. and Maintenance of road from under PMGSY programme fund under PMGSY PKG No.OR-02484/ PMGSY-III
|
|
-- |
|
40
|
|
RW EE BALASORE - I
|
Chief Engineer, Building and Bridge, RW CE
|
Submission of revised estimate and deviation statement for the work Constn. of road from Jamudiha GP chhak to Baishnab Bandha Baba Ashram Road under MMSY TRIP
|
|
-- |
|
41
|
|
RW EE BALASORE - I
|
Chief Engineer, Building and Bridge, RW CE
|
Submission of Feasibility report of Bridge proposal furnished by the Honble MLA Nilgiri during 2026-27
|
|
-- |
|
42
|
|
Executive Engineer
|
Chief Engineer, Building and Bridge, RW CE
|
Representation filed by Amita Choudhury regarding willful harassment for payment of escalation amount and compelling the agency to take shelter of law and following double standard role in awarding escalation amount to other contractors of same category.
|
|
-- |
|
43
|
|
Executive Engineer
|
RD - EIC-RW CE, RW CE
|
Submission of LPC in favour of Smt. Dipika Majhi, Ex-Junior Engineer.
|
|
-- |
|
44
|
|
Executive Engineer
|
RD - Chief Engineer, Plan Roads, RW CE
|
Acceptender of tender for the work Construction of Kumbhara Chhak to Bartira Via Majurasi road under MMSY-TRIP road for the year 2025-26 in the District of Jagatsinghpur.
|
|
-- |
|
45
|
|
Executive Engineer
|
RD - EIC-RW CE, RW CE
|
Acceptender of tender for the work Construction of Kumbhara Chhak to Bartira Via Majurasi road under MMSY-TRIP road for the year 2025-26 in the District of Jagatsinghpur.
|
|
-- |
|
46
|
|
Executive Engineer
|
RD - Chief Engineer, Plan Roads, RW CE
|
Submission of DPRs of road project under MMSY-TRIP road for the year 2026-27 in the District of Jagatsinghpur.
|
|
-- |
|
47
|
|
Executive Engineer
|
RD - EIC-RW CE, RW CE
|
Submission of DPRs of road project under MMSY-TRIP road for the year 2026-27 in the District of Jagatsinghpur.
|
|
-- |
|
48
|
|
Executive Engineer
|
RD - Chief Engineer, Plan Roads, RW CE
|
Acceptance of tender for the work Improvement to Dainlo to Lankapada road under MMSY-Improvement to Existing RD road for the year 2025-26 in the District of Jagatsinghpur.
|
|
-- |
|
49
|
|
Executive Engineer
|
RD - EIC-RW CE, RW CE
|
Acceptance of tender for the work Improvement to Dainlo to Lankapada road under MMSY-Improvement to Existing RD road for the year 2025-26 in the District of Jagatsinghpur.
|
|
-- |
|
50
|
|
Executive Engineer
|
RD - EIC-RW CE, RW CE
|
Acceptance of tender for the work Construction of Kuamanga Bridge (Sidhabhuin Tarikunda) RD road to Birat Cuttack via Sibapur (Jagannath Temple) road under MMSY-TRIP road for the year 2025-26 in the District of Jagatsinghpur.
|
|
-- |
|
51
|
|
Executive Engineer
|
RD - Chief Engineer, Plan Roads, RW CE
|
Acceptance of tender for the work Construction of Kuamanga Bridge (Sidhabhuin Tarikunda) RD road to Birat Cuttack via Sibapur (Jagannath Temple) road under MMSY-TRIP road for the year 2025-26 in the District of Jagatsinghpur.
|
|
-- |
|
52
|
|
Executive Engineer
|
RD - EIC-RW CE, RW CE
|
Acceptance of tender for the work Construction of Sasmgagol (Jail Chhaka ) to Balisahi via Duadia road under MMSY-TRIP for the year 2025-26 in the District of Jagatsinghpur.
|
|
-- |
|
53
|
|
Executive Engineer
|
RD - Chief Engineer, Plan Roads, RW CE
|
Acceptance of tender for the work Construction of Sasmgagol (Jail Chhaka ) to Balisahi via Duadia road under MMSY-TRIP for the year 2025-26 in the District of Jagatsinghpur.
|
|
-- |
|
54
|
|
Executive Engineer
|
RD - EIC-RW CE, RW CE
|
CMRL road proposal 2026-27 regarding.
|
|
-- |
|
55
|
|
Executive Engineer
|
RD - Chief Engineer, Plan Roads, RW CE
|
CMRL road proposal 2026-27 regarding.
|
|
-- |
|
56
|
|
Executive Engineer
|
RD - EIC-RW CE, RW CE
|
Office Order.
|
|
-- |
|
57
|
|
Executive Engineer
|
RD - Chief Engineer, Plan Roads, RW CE
|
Office Order.
|
|
-- |
|
58
|
|
Executive Engineer
|
RD - EIC-RW CE, RW CE
|
Work order for the work Construction of road from Anantapur to Nendera Linking Bhuasuni Khadikadanda Kusupur G.P Office road under MMSY-DRR for the year 2025-26 in the District of Jagatsisnghpur.
|
|
-- |
|
59
|
|
Executive Engineer
|
RD - Chief Engineer, Plan Roads, RW CE
|
Work order for the work Construction of road from Anantapur to Nendera Linking Bhuasuni Khadikadanda Kusupur G.P Office road under MMSY-DRR for the year 2025-26 in the District of Jagatsisnghpur.
|
|
-- |
|
60
|
|
Executive Engineer
|
RD - Chief Engineer-I, RW CE
|
Tender for the work- S/R to Lo61-Badapalli to Badabela road for the year 2026-27.
|
|
-- |
|
61
|
|
Executive Engineer
|
RD - Chief Engineer-I, RW CE
|
Tender for the work- S/R to SH road to Jagannathpur road for the year 2026-27.
|
|
-- |
|
62
|
|
Executive Engineer
|
Chief Engineer, Building and Bridge, RW CE
|
Submission of hydraulic particular and sub-soil investigation report for the work- Construction of HL bridge over local nallah on Basudevpur to Arakhapur road for the year 2026-27 in the district of Ganjam.
|
|
-- |
|
63
|
|
Executive Engineer
|
RD - Chief Engineer-I, RW CE
|
S/R to PWD Road to Talasakara Road for the year 2026-27.
|
|
-- |
|
64
|
|
Executive Engineer
|
RD - Chief Engineer, Plan Roads, RW CE
|
Work order for the work Construction of road long approach of Bridge over Devi on Bhokanji Mundilo road under MMSY-TRIP for the year 2025-26 in the District of Jagatsinghpur.
|
|
-- |
|
65
|
|
Executive Engineer
|
RD - EIC-RW CE, RW CE
|
Work order for the work Construction of road long approach of Bridge over Devi on Bhokanji Mundilo road under MMSY-TRIP for the year 2025-26 in the District of Jagatsinghpur.
|
|
-- |
|
66
|
|
Executive Engineer
|
RD - Chief Engineer, Plan Roads, RW CE
|
Work order for the work Improvement to PWD road to Baingol road in the District of Jagatsinghpur MMSY-Improvement existing RD road for the year 2025-26.
|
|
-- |
|
67
|
|
Executive Engineer
|
RD - EIC-RW CE, RW CE
|
Work order for the work Improvement to PWD road to Baingol road in the District of Jagatsinghpur MMSY-Improvement existing RD road for the year 2025-26.
|
|
-- |
|
68
|
|
Executive Engineer
|
Chief Engineer, Building and Bridge, RW CE
|
Tender for the work- S/R to RI office Karchuli for the year 2026-27.
|
|
-- |
|
69
|
|
Executive Engineer
|
Chief Engineer, Building and Bridge, RW CE
|
Tender for the work- S/R to RI office Motabadi for the year 2026-27.
|
|
-- |
|
70
|
|
Executive Engineer
|
Chief Engineer, Building and Bridge, RW CE
|
Tender for the work- S/R to RI office Chirikipada Sasan for the year 2026-27.
|
|
-- |
|
71
|
|
Executive Engineer
|
RD - Chief Engineer, Buildings, RW CE
|
Cancellation of Tender
|
|
-- |
|
72
|
|
Executive Engineer
|
RD - EIC-RW CE, RW CE
|
Cancellation of Tender
|
|
-- |
|
73
|
|
Executive Engineer
|
RD - Chief Engineer, Plan Roads, RW CE
|
Cancellation of Tender
|
|
-- |
|
74
|
|
Executive Engineer
|
Chief Engineer, Building and Bridge, RW CE
|
Cancellation of Tender
|
|
-- |
|
75
|
|
Executive Engineer
|
RD - Chief Engineer, PMGSY, RW CE
|
Cancellation of Tender
|
|
-- |
|
76
|
|
Executive Engineer
|
Chief Engineer, Building and Bridge, RW CE
|
Submission of new bridge proposals under Setu Bandhan Yojana for the Year 2027-28
|
|
-- |
|
77
|
|
SE RW Kendrapara
|
RD - EIC-RW CE, RW CE
|
RTI Application on dtd. 14.07.2026 of Sri Rashmi Ranjan Beura.
|
|
-- |
|
78
|
|
SE RW Kendrapara
|
RD - EIC-RW CE, RW CE
|
RTI Application on dtd. 14.08.2026 of Sarbeswar Samal.
|
|
-- |
|
79
|
|
SE RW Kendrapara
|
RD - Chief Engineer, Buildings, RW CE
|
Hindrance for the work Constn. of Bridge over Pandra Nallah on Haripur to Mangarajpur Road for the year 2023-24.
|
|
-- |
|
80
|
|
SE RW Kendrapara
|
RD - Chief Engineer, Buildings, RW CE
|
Hindrance for the work Constn. of Bridge over Damsala Nallah at 0.80km on Kaliapani to Dihabahali PS Road for the year 2023-24.
|
|
-- |
|
81
|
|
SE RW Kendrapara
|
RD - EIC-RW CE, RW CE
|
Submission o Hydraulic Particular and Soil Investigation Report for the work “Constn. of Bridge over river Genguti on Manduka to Achutabasanta Road under SBY” in the Dist. of Jajpur for the year 2026-27.
|
|
-- |
|
82
|
|
RW SE SUNABEDA
|
RD - EIC-RW CE, RW CE
|
Submission of compliance of inspection report-179/2025-26
|
|
-- |
|
83
|
|
Executive Engineer
|
RD - Chief Engineer-I, RW CE
|
Submission of List of works under state funded (Road/Bridge/Building) projects along with deposit works for assignment of Quality Monitors for the month Sepetember 2026.
|
|
-- |
|
84
|
|
SE RW Kendrapara
|
RD - EIC-RW CE, RW CE
|
Cancellation of Deployment / Redeployment orders.
|
|
-- |
|
85
|
|
Executive Engineer
|
RD - Chief Engineer, PMGSY, RW CE
|
Requisition for re-issue of payment 5000 requisition in favour of SQM Sri Pradipta Bhola.
|
|
-- |
|
86
|
|
Executive Engineer
|
Chief Engineer, Building and Bridge, RW CE
|
Requirement of funds for building of R.D. Department.
|
|
-- |
|
87
|
|
Executive Engineer,R.W.D-II, Nayagarh
|
RD - EIC-RW CE, RW CE
|
Letter of acceptance for the work “Construction of PWD road to Raisara Road in the District of Nayagarh under MMSY for the year 2026-27
|
|
-- |
|
88
|
|
Executive Engineer,R.W.D-II, Nayagarh
|
RD - Chief Engineer, Plan Roads, RW CE
|
Letter of acceptance for the work “Construction of PWD road to Raisara Road in the District of Nayagarh under MMSY for the year 2026-27
|
|
-- |
|
89
|
|
Executive Engineer,R.W.D-II, Nayagarh
|
RD - EIC-RW CE, RW CE
|
Letter of acceptance for the work “Construction of road from RD road to Polara road under MMSY” in the district of Nayagarh for the year 2026-27
|
|
-- |
|
90
|
|
Executive Engineer,R.W.D-II, Nayagarh
|
RD - Chief Engineer, Plan Roads, RW CE
|
Letter of acceptance for the work “Construction of road from RD road to Polara road under MMSY” in the district of Nayagarh for the year 2026-27
|
|
-- |
|
91
|
|
Executive Engineer,R.W.D-II, Nayagarh
|
RD - EIC-RW CE, RW CE
|
Letter of acceptance for the work “Construction of PWD road to Budhabari Road in the District of Nayagarh under MMSY for the year 2026-27
|
|
-- |
|
92
|
|
Executive Engineer,R.W.D-II, Nayagarh
|
RD - Chief Engineer, Plan Roads, RW CE
|
Letter of acceptance for the work “Construction of PWD road to Budhabari Road in the District of Nayagarh under MMSY for the year 2026-27
|
|
-- |
|
93
|
|
Executive Engineer,R.W.D-II, Nayagarh
|
RD - EIC-RW CE, RW CE
|
Letter of acceptance for the work “Construction of PWD road to Dantura Road in the District of Nayagarh under MMSY for the year 2026-27
|
|
-- |
|
94
|
|
Executive Engineer,R.W.D-II, Nayagarh
|
RD - Chief Engineer, Plan Roads, RW CE
|
Letter of acceptance for the work “Construction of PWD road to Dantura Road in the District of Nayagarh under MMSY for the year 2026-27
|
|
-- |