1
|
|
Executive Engineer
|
RD - EIC-RW CE, RW CE
|
Requirement of funds under D.no-28-5054-04-337-1230-37247-073
|
|
-- |
|
2
|
|
Executive Engineer
|
RD - Chief Engineer, Plan Roads, RW CE
|
Requirement of funds under D.no-28-5054-04-337-1230-37247-073
|
|
-- |
|
3
|
|
Executive Engineer
|
RD - EIC-RW CE, RW CE
|
Submission of Utilization certificate under Demand No.42-2245-Relief on account of natural calamities -02-flood ,Cyvlone Etc .Cyclone Montha.
|
|
-- |
|
4
|
|
Executive Engineer Patnagarh
|
Chief Engineer, Building and Bridge, RW CE
|
Submission of requisition of Health Department projects in shape of challan deposit form
|
|
-- |
|
5
|
|
Executive Engineer
|
RD - Chief Engineer, Plan Roads, RW CE
|
Requirement of funds for work under CMRL.
|
|
-- |
|
6
|
|
Executive Engineer
|
RD - Chief Engineer, Plan Roads, RW CE
|
Non-submission of required documents/ information for the work Imp. to Charampa Dungura road towards compliance for availing incentive in project completed before the stipulated date of completion.
|
|
-- |
|
7
|
|
Executive Engineer
|
RD - EIC-RW CE, RW CE
|
Submission of representation of Honble MLA Bhadak assembly constituency Sri Sitansu Sekhar Mohapatra regarding allotment of funds for periodical maintenance and urgent repair/ restoration of daily communication roads.
|
|
-- |
|
8
|
|
Executive Engineer
|
RD - Chief Engineer, Plan Roads, RW CE
|
Submission of representation of Honble MLA Bhandaripokhari assembly constituency Sri Sanjeeb Kumar Mallik regarding proposal for Construction and Strengthening of roads.
|
|
-- |
|
9
|
|
Executive Engineer
|
RD - EIC-RW CE, RW CE
|
Information on Govt. vehicles.
|
|
-- |
|
10
|
|
Executive Engineer
|
RD - EIC-RW CE, RW CE
|
Information on un-serviceable vehicles and road rollers.
|
|
-- |
|
11
|
|
Executive Engineer
|
RD - Chief Engineer, Plan Roads, RW CE
|
Submission of road proposal under MMSY (Mission Powar) scheme for 26-27.
|
|
-- |
|
12
|
|
Executive Engineer
|
RD - EIC-RW CE, RW CE
|
Construction of HL bridge over Nalia river on Arnapal to Barjisahi road.
|
|
-- |
|
13
|
|
Executive Engineer
|
RD - Chief Engineer, Plan Roads, RW CE
|
Supply of required records with fundamental summaries about the case WPC 3624 filed by Sri Sarat Kumar Samal.
|
|
-- |
|
14
|
|
Executive Engineer
|
RD - Chief Engineer, Plan Roads, RW CE
|
Requirement of fund for rod works.
|
|
-- |
|
15
|
|
Executive Engineer
|
RD - Chief Engineer, Buildings, RW CE
|
Submission of Division Details and Agency Code for Transfer of fund through SNA SPARSH.
|
|
-- |
|
16
|
|
Executive Engineer
|
RD - Chief Engineer-I, RW CE
|
Submission of Division Details and Agency Code for Transfer of fund through SNA SPARSH.
|
|
-- |
|
17
|
|
Executive Engineer
|
RD - Chief Engineer, Plan Roads, RW CE
|
Requirement of funds under MMSY- CMRL work for payment of R/A bill
|
|
-- |
|
18
|
|
Executive Engineer
|
RD - Chief Engineer-I, RW CE
|
Requirement of funds under MMSY- CMRL work for payment of R/A bill
|
|
-- |
|
19
|
|
Executive Engineer
|
RD - Chief Engineer-I, RW CE
|
Requirement of funds under CMRL Head of Account for payment of 1st Year Maintenance
|
|
-- |
|
20
|
|
Executive Engineer
|
RD - Chief Engineer, Plan Roads, RW CE
|
Requirement of funds under CMRL Head of Account for payment of 1st Year Maintenance
|
|
-- |
|
21
|
|
Executive Engineer
|
RD - Chief Engineer, Plan Roads, RW CE
|
Requirement of funds under SDMF head of account for payment of running bill
|
|
-- |
|
22
|
|
Executive Engineer
|
RD - Chief Engineer-I, RW CE
|
Requirement of funds under SDMF head of account for payment of running bill
|
|
-- |
|
23
|
|
Executive Engineer
|
RD - Chief Engineer, Plan Roads, RW CE
|
Submission of DPR for projects proposal under the scheme MMSY Improvement to existing RD road
|
|
-- |
|
24
|
|
Executive Engineer
|
RD - Chief Engineer-I, RW CE
|
Submission of DPR for projects proposal under the scheme MMSY Improvement to existing RD road
|
|
-- |
|
25
|
|
Executive Engineer
|
Chief Engineer, Building and Bridge, RW CE
|
Requirement of funds for completion of ongoing bridge projects
|
|
-- |
|
26
|
|
Executive Engineer
|
RD - Chief Engineer-I, RW CE
|
Requirement of funds for completion of ongoing bridge projects
|
|
-- |
|
27
|
|
Executive Engineer
|
Chief Engineer, Building and Bridge, RW CE
|
Submission of requisition of Health Department projects in shape challan deposit
|
|
-- |
|
28
|
|
Executive Engineer
|
RD - Chief Engineer-I, RW CE
|
Submission of requisition of Health Department projects in shape challan deposit
|
|
-- |
|
29
|
|
Executive Engineer
|
RD - Empowered Officer OSRRA, RW CE
|
Requisition of funds for PMGSY-III
|
|
-- |
|
30
|
|
Executive Engineer
|
RD - Chief Engineer, PMGSY, RW CE
|
Requisition of funds for PMGSY-III
|
|
-- |
|
31
|
|
Executive Engineer
|
Chief Engineer, Building and Bridge, RW CE
|
Submission of DPR for the work construction of Bridge over local nallah at 0.050 km from Anantapur to Bankeswarpur
|
|
-- |
|
32
|
|
Executive Engineer
|
RD - Chief Engineer-I, RW CE
|
Submission of DPR for the work construction of Bridge over local nallah at 0.050 km from Anantapur to Bankeswarpur
|
|
-- |
|
33
|
|
Supt. Engineer
|
RD - Chief Engineer, Plan Roads, RW CE
|
Tender Notice No. RWCCESNG- 08 of 2026-27.
|
|
-- |
|
34
|
|
Supt. Engineer
|
RD - Chief Engineer, PMGSY, RW CE
|
Tender Notice No. RWCCESNG- 08 of 2026-27.
|
|
-- |
|
35
|
|
Supt. Engineer
|
Chief Engineer, Building and Bridge, RW CE
|
Tender Notice No. RWCCESNG- 08 of 2026-27.
|
|
-- |
|
36
|
|
Supt. Engineer
|
RD - EIC-RW CE, RW CE
|
Tender Notice No. RWCCESNG- 08 of 2026-27.
|
|
-- |
|
37
|
|
Supt. Engineer
|
RD - Chief Engineer, Buildings, RW CE
|
Tender Notice No. RWCCESNG- 08 of 2026-27.
|
|
-- |
|
38
|
|
Executive Engineer
|
RD - EIC-RW CE, RW CE
|
Submission of revised AMP proposal of Rural Roads for the year 2026-27.
|
|
-- |
|
39
|
|
Executive Engineer
|
RD - Chief Engineer, Plan Roads, RW CE
|
Re-Submission of DPR for work- Construction of H.L Bridge over Prachi on PW road to Belabari Temple road.
|
|
-- |
|
40
|
|
Executive Engineer
|
RD - Chief Engineer, Plan Roads, RW CE
|
Submission of DPR for work - Construction of road from Bagabasta Chhaka to Alanda road.
|
|
-- |
|
41
|
|
Executive Engineer
|
RD - Chief Engineer, Plan Roads, RW CE
|
Letter of Acceptance for the work- Construction of flood Resilient road from Kotarnga Chhak to Andara Ichhapur G.P office road in the dist of Puri under SDMF for the year 2024-25.
|
|
-- |
|
42
|
|
Executive Engineer
|
RD - Chief Engineer, Plan Roads, RW CE
|
Requirement of funds for shifting of 11KV and L.T Lines for work- Construction and Maintainance of Dighalo Chhaka to Terundia Via- Musunpur and Rajarashi under TRIP for 2022-23.
|
|
-- |
|
43
|
|
Executive Engineer
|
RD - Chief Engineer, PMGSY, RW CE
|
Submission of ATR for the road work ’'Tumudibandha to Birimila', Package No-OR-25-rn352.
|
|
-- |
|
44
|
|
Executive Engineer
|
RD-SE Quality control, RW CE
|
Submission of ATR for the road work ’'Tumudibandha to Birimila', Package No-OR-25-rn352.
|
|
-- |
|
45
|
|
Executive Engineer
|
RD - Chief Engineer, PMGSY, RW CE
|
Submission of ATR for the road work ’'Tumudibandha to Birimila', Package No-OR-25-rn352.
|
|
-- |
|
46
|
|
Executive Engineer
|
RD-Executive Engineer-Quality Control, RW CE
|
Submission of ATR for the road work ’'Tumudibandha to Birimila', Package No-OR-25-rn352.
|
|
-- |
|
47
|
|
Executive Engineer
|
RD - Chief Engineer, PMGSY, RW CE
|
Submission of ATR for the road work ’'Lankagarh to Jhiripani ', Package No-OR-25-336.
|
|
-- |
|
48
|
|
Executive Engineer
|
RD-Executive Engineer-Quality Control, RW CE
|
Submission of ATR for the road work ’'Lankagarh to Jhiripani ', Package No-OR-25-336.
|
|
-- |
|
49
|
|
Executive Engineer
|
RD - EIC-RW CE, RW CE
|
Submission of ATR for the road work ’'Lankagarh to Jhiripani ', Package No-OR-25-336.
|
|
-- |
|
50
|
|
Executive Engineer
|
RD - Chief Engineer, PMGSY, RW CE
|
Requisition for bank authorization for periodical maintenance of 5 years completed PMGSY road.
|
|
-- |
|
51
|
|
Executive Engineer
|
RD - Chief Engineer, PMGSY, RW CE
|
Requisition for bank authorization for periodical maintenance of 5 years completed PMGSY road.
|
|
-- |
|
52
|
|
Executive Engineer
|
Chief Engineer, Building and Bridge, RW CE
|
Requirement of allotment of fund for Plan scheme under MMSY-CMRL.
|
|
-- |
|
53
|
|
Executive Engineer
|
Chief Engineer, Building and Bridge, RW CE
|
Requirement of allotment of fund for Plan schemes under Setu Bandhana Yojana.
|
|
-- |
|
54
|
|
Executive Engineer
|
Chief Engineer, Building and Bridge, RW CE
|
Requirement of allotment of fund for Plan schemes under Setu Bandhana Yojana.
|
|
-- |
|
55
|
|
Executive Engineer
|
Chief Engineer, Building and Bridge, RW CE
|
Requirement of allotment of fund for Plan schemes under Setu Bandhana Yojana.
|
|
-- |
|
56
|
|
Executive Engineer
|
Chief Engineer, Building and Bridge, RW CE
|
Requirement of allotment of fund for Setu Bandhan Yajona (SBY).
|
|
-- |
|
57
|
|
Executive Engineer
|
Chief Engineer, Building and Bridge, RW CE
|
Regarding hand over the land for construction of MPH(Multi- purpose hall)at old nonfunctionalrnschool building at ward no.10.
|
|
-- |
|
58
|
|
S.E.Central Circle R.W,BBSR
|
RD - Chief Engineer, Plan Roads, RW CE
|
Tender for the work Const of Road from Madhupur to Kumarbasta Under MMSY-CMRL in the Dist of Khordha Under SDMF for the year 2025-26.
|
|
-- |
|
59
|
|
S.E.Central Circle R.W,BBSR
|
RD - Chief Engineer, Plan Roads, RW CE
|
Submission of Detailed Estimates Under MMSY- Impvt to Existing RD Road for the year 2026-27.
|
|
-- |
|
60
|
|
Executive Engineer
|
Chief Engineer, Building and Bridge, RW CE
|
Release of Allotment / LC under Head of Account 28-5054-04-101-2161-22115-073-SBY. .
|
|
-- |
|
61
|
|
Executive Engineer
|
RD - Chief Engineer, Buildings, RW CE
|
Release of Allotment / LC under Head of Account 28-5054-04-101-2161-22115-073-SBY. .
|
|
-- |
|
62
|
|
Executive Engineer
|
RD - Chief Engineer, Buildings, RW CE
|
Letter of acceptance of your Bid for the Work “Construction of 5 nos of class room, one girls common room, one Ridding Room at Derabish College” in the District of Kendrapara for the year 2025-2026.
|
|
-- |
|
63
|
|
Executive Engineer
|
Chief Engineer, Building and Bridge, RW CE
|
Letter of acceptance of your Bid for the Work “Construction of 5 nos of class room, one girls common room, one Ridding Room at Derabish College” in the District of Kendrapara for the year 2025-2026.
|
|
-- |
|
64
|
|
Executive Engineer
|
RD - EIC-RW CE, RW CE
|
A Detail Factual report on the engagement / Service history and case history of the petitioner of WPC (OAC) No. 3584 of 2014 field by Ananta Charan Bal vrs state of Odisha.
|
|
-- |
|
65
|
|
Executive Engineer
|
RD - Chief Engineer, Buildings, RW CE
|
Permission for execution of non started PMH building Construction of MPH hall 300 capacity Infront of MPH Qtr Mauja Madhiala and 500 capacity Infront of HP Gas Depot at Mirzapatana.
|
|
-- |
|
66
|
|
Executive Engineer
|
Chief Engineer, Building and Bridge, RW CE
|
Permission for execution of non started PMH building Construction of MPH hall 300 capacity Infront of MPH Qtr Mauja Madhiala and 500 capacity Infront of HP Gas Depot at Mirzapatana.
|
|
-- |
|
67
|
|
Executive Engineer
|
RD - EIC-RW CE, RW CE
|
Change Statement of Sri Suresh Kumar Patnaik, Draughtsman for the Month of May2026.
|
|
-- |
|
68
|
|
Executive Engineer
|
Chief Engineer, Building and Bridge, RW CE
|
Change Statement of Sri Suresh Kumar Patnaik, Draughtsman for the Month of May2026.
|
|
-- |
|
69
|
|
S.E.Central Circle R.W,BBSR
|
RD - Chief Engineer, Plan Roads, RW CE
|
Tender for the work Const of Road form Jamusahi to Kulasara Under MMSY-CMRL in the Dist of Khordha for the year 2025-26.
|
|
-- |
|
70
|
|
S.E.Central Circle R.W,BBSR
|
RD - Chief Engineer, Plan Roads, RW CE
|
Submission of Detailed Estimates Under MMSY- Improvement to Existing RD road for the year 2026-27.
|
|
-- |
|
71
|
|
S.E.Central Circle R.W,BBSR
|
Chief Engineer, Building and Bridge, RW CE
|
Submission of Hydraulic Particulars and Sub-Soil Investigation report for the work Const of H.L Bridge Over Hada river on Gopalipada RD road to Balabhadrapur Patna rpad Under SBY in the dist of Khordha for the year 2025-26.
|
|
-- |
|
72
|
|
S.E.Central Circle R.W,BBSR
|
SE Design, RW CE
|
Submission of Hydraulic Particulars and Sub-Soil Investigation report for the work Const of H.L Bridge Over Hada river on Gopalipada RD road to Balabhadrapur Patna rpad Under SBY in the dist of Khordha for the year 2025-26.
|
|
-- |
|
73
|
|
S.E.Central Circle R.W,BBSR
|
RD-SE Quality control, RW CE
|
Submission of Hydraulic Particulars and Sub-Soil Investigation report for the work Const of H.L Bridge Over Hada river on Gopalipada RD road to Balabhadrapur Patna rpad Under SBY in the dist of Khordha for the year 2025-26.
|
|
-- |
|
74
|
|
S.E.Central Circle R.W,BBSR
|
RD - Chief Engineer, Plan Roads, RW CE
|
Tender for the work Const of road from Radhamohanpur RD road to Brajarajpur Under MMSY-CMRL for the year 2024-25.
|
|
-- |
|
75
|
|
S.E.Central Circle R.W,BBSR
|
RD - Chief Engineer, Plan Roads, RW CE
|
Tender for the work Const of flood resilient road From NH-5 to Parikansari Via Paikakusadiha Road in the Dist of Khordha Under SDMF for the year 2024-25.
|
|
-- |
|
76
|
|
S.E.Central Circle R.W,BBSR
|
RD - Chief Engineer, Plan Roads, RW CE
|
Tender for the work Const of flood resilient road From Begunia to bada Berana Road in the Dist of Khordha Under SDMF for the year 2024-25.
|
|
-- |
|
77
|
|
S.E.Central Circle R.W,BBSR
|
RD - EIC-RW CE, RW CE
|
List of Qualified / Disqualified list Of Tender Online CC- 38 of 2025.
|
|
-- |
|
78
|
|
S.E.Central Circle R.W,BBSR
|
Chief Engineer, Building and Bridge, RW CE
|
List of Qualified / Disqualified list Of Tender Online CC- 38 of 2025.
|
|
-- |
|
79
|
|
S.E.Central Circle R.W,BBSR
|
RD - Chief Engineer, Plan Roads, RW CE
|
Submission of Final Deviation statement for the work Const of Road From Dolagovindapur to Dholamasaka via Paikabankatora road In the Dist of Nayagarh Under MMSY-TRIP for the year 2023-24.
|
|
-- |
|
80
|
|
S.E.Central Circle R.W,BBSR
|
RD - Chief Engineer, Plan Roads, RW CE
|
Tender for the work Const of Flood Resilient road from Nayahat to Kalabuda via Desthali under SDMF in the Dist of Puri for the year 2025-26.
|
|
-- |
|
81
|
|
S.E.Central Circle R.W,BBSR
|
RD - Chief Engineer, Plan Roads, RW CE
|
Submission of Detailed Estimates for the Work Impvt to Sankhei to Baulasahi under MMSY-Improvement to Existing RD Road in the Dist of Nayagarh for the year 2025-26.
|
|
-- |
|
82
|
|
S.E.Central Circle R.W,BBSR
|
Chief Engineer, Building and Bridge, RW CE
|
Submission of Detailed Estimates for the Work Const of H.L Bridge Kutubari Nallah on Salajhari to bhobasara road in the Dist of Nayagarh for the year 2025-26.
|
|
-- |
|
83
|
|
S.E.Central Circle R.W,BBSR
|
RD - Chief Engineer, Plan Roads, RW CE
|
Submission of Detailed Estimates for the Work Impvt to Lenkudiapada to Dhabalai Road under MMSY-Improvement to Existing RD Road in the Dist of Nayagarh for the year 2025-26.
|
|
-- |
|
84
|
|
S.E.Central Circle R.W,BBSR
|
RD - Chief Engineer, Plan Roads, RW CE
|
Tender for the work Const of Flood Resilient road From Niali Nariso Meladanda road In the Dist of Khordha Under SDMF for the year 2025-26.
|
|
-- |
|
85
|
|
S.E.Central Circle R.W,BBSR
|
Chief Engineer, Building and Bridge, RW CE
|
Submission of Hydraulic Particulars along with Sub-Soil Investigation Report for Const of H.L Bridge Over Local Nallah at Ch 1.410 Km On Rd road on Gabasingha On Andhera Ichhapur via Adhena Road Under MMSY-TRIP in the Dist of Puri for the year 2025-26.
|
|
-- |
|
86
|
|
S.E.Central Circle R.W,BBSR
|
SE Design, RW CE
|
Submission of Hydraulic Particulars along with Sub-Soil Investigation Report for Const of H.L Bridge Over Local Nallah at Ch 1.410 Km On Rd road on Gabasingha On Andhera Ichhapur via Adhena Road Under MMSY-TRIP in the Dist of Puri for the year 2025-26.
|
|
-- |
|
87
|
|
S.E.Central Circle R.W,BBSR
|
RD-SE Quality control, RW CE
|
Submission of Hydraulic Particulars along with Sub-Soil Investigation Report for Const of H.L Bridge Over Local Nallah at Ch 1.410 Km On Rd road on Gabasingha On Andhera Ichhapur via Adhena Road Under MMSY-TRIP in the Dist of Puri for the year 2025-26.
|
|
-- |
|
88
|
|
S.E.Central Circle R.W,BBSR
|
RD - Chief Engineer, Plan Roads, RW CE
|
Submission of Detailed Estimates for Const of H.L Bridge Over Local Nalllah on N.B road to Gabanalia Via Badagaon in the Dist of Puri under SBY for the year 2025-26.
|
|
-- |
|
89
|
|
S.E.Central Circle R.W,BBSR
|
RD - Chief Engineer, Plan Roads, RW CE
|
Tender for the work Const of Patapur Balanga to Existing RD road via Chakrakuda Rice Mill, Kanyakuda Siva Temple , Gadachandapur Harijansahi , Dasapurusottampur Majhi sahi road In the dist of Puri.
|
|
-- |
|
90
|
|
S.E.Central Circle R.W,BBSR
|
Chief Engineer, Building and Bridge, RW CE
|
Submission of Sub-Soil Investigation Report for the work Const of Proposed H.L Bridge Over Chilika on RD road to Khirisahi road Under SBY in the Dist of Puri for the year 2024-25.
|
|
-- |
|
91
|
|
S.E.Central Circle R.W,BBSR
|
RD-SE Quality control, RW CE
|
Submission of Sub-Soil Investigation Report for the work Const of Proposed H.L Bridge Over Chilika on RD road to Khirisahi road Under SBY in the Dist of Puri for the year 2024-25.
|
|
-- |
|
92
|
|
S.E.Central Circle R.W,BBSR
|
SE Design, RW CE
|
Submission of Sub-Soil Investigation Report for the work Const of Proposed H.L Bridge Over Chilika on RD road to Khirisahi road Under SBY in the Dist of Puri for the year 2024-25.
|
|
-- |
|
93
|
|
S.E.Central Circle R.W,BBSR
|
Chief Engineer, Building and Bridge, RW CE
|
Submission of Hydraulic Particulars Along with Sub-Soil Investigation report for the work Const of Proposed H.L bridge Over River Bhargavi on Bindeibasta to Kapileswarpur road in the Dist of Puri under SBY for the year 2025-26.
|
|
-- |
|
94
|
|
S.E.Central Circle R.W,BBSR
|
SE Design, RW CE
|
Submission of Hydraulic Particulars Along with Sub-Soil Investigation report for the work Const of Proposed H.L bridge Over River Bhargavi on Bindeibasta to Kapileswarpur road in the Dist of Puri under SBY for the year 2025-26.
|
|
-- |
|
95
|
|
S.E.Central Circle R.W,BBSR
|
RD-SE Quality control, RW CE
|
Submission of Hydraulic Particulars Along with Sub-Soil Investigation report for the work Const of Proposed H.L bridge Over River Bhargavi on Bindeibasta to Kapileswarpur road in the Dist of Puri under SBY for the year 2025-26.
|
|
-- |
|
96
|
|
S.E.Central Circle R.W,BBSR
|
Chief Engineer, Building and Bridge, RW CE
|
Re-Submission of Sub-Soil Investigation Report for the work Const of Proposed H.L Bridge over Kainchakania Nallah on Khirisahi to Mithikua road Under SBY in the Dist of Puri for the year 2024-25.
|
|
-- |
|
97
|
|
S.E.Central Circle R.W,BBSR
|
SE Design, RW CE
|
Re-Submission of Sub-Soil Investigation Report for the work Const of Proposed H.L Bridge over Kainchakania Nallah on Khirisahi to Mithikua road Under SBY in the Dist of Puri for the year 2024-25.
|
|
-- |
|
98
|
|
S.E.Central Circle R.W,BBSR
|
RD-SE Quality control, RW CE
|
Re-Submission of Sub-Soil Investigation Report for the work Const of Proposed H.L Bridge over Kainchakania Nallah on Khirisahi to Mithikua road Under SBY in the Dist of Puri for the year 2024-25.
|
|
-- |
|
99
|
|
S.E.Central Circle R.W,BBSR
|
RD - Chief Engineer, Plan Roads, RW CE
|
Change of alignment of Road Sampur to Olasa Via Harirajpur Mandagiri Road Under CMRL in the Dist f Khordha for the year 2023-24.
|
|
-- |
|
100
|
|
S.E.Central Circle R.W,BBSR
|
RD - Chief Engineer, Plan Roads, RW CE
|
Tender for the work '' Const of Flood Resilient road from Kotaranga Chhak to Andara Ichhapur G.P office in the Dist of Puri Under SDMF for the year 2024-25.
|
|
-- |
|
101
|
|
S.E.Central Circle R.W,BBSR
|
RD - Chief Engineer, Plan Roads, RW CE
|
Tender for the work Impvt to Gabakunda to T1- Nua Budhakera and Madhipur Nuabudhakera road in the Dist of Puri for the year 2024-25.
|
|
-- |
|
102
|
|
S.E.Central Circle R.W,BBSR
|
RD - Chief Engineer, Plan Roads, RW CE
|
Tender for the work Const of Road from Brahmapada of Krushanatar Via Jiripada Khuntapalli Raidiha , Katurikata , Beguniasahi and Dolagovindapur Nuasahi in the Dist of Khordha Under MMSY-TRIP for the year 2024-25.
|
|
-- |
|
103
|
|
S.E.Central Circle R.W,BBSR
|
RD - EIC-RW CE, RW CE
|
2469 dt.30.04.2026 (Tender-Online-C.C-05 of 2026 of C.C.E.C.R.W.C,BBSR)
|
|
-- |
|
104
|
|
S.E.Central Circle R.W,BBSR
|
RD - Chief Engineer, PMGSY, RW CE
|
2469 dt.30.04.2026 (Tender-Online-C.C-05 of 2026 of C.C.E.C.R.W.C,BBSR)
|
|
-- |
|
105
|
|
S.E.Central Circle R.W,BBSR
|
RD - Chief Engineer, Plan Roads, RW CE
|
2469 dt.30.04.2026 (Tender-Online-C.C-05 of 2026 of C.C.E.C.R.W.C,BBSR)
|
|
-- |
|
106
|
|
S.E.Central Circle R.W,BBSR
|
Chief Engineer, Building and Bridge, RW CE
|
2469 dt.30.04.2026 (Tender-Online-C.C-05 of 2026 of C.C.E.C.R.W.C,BBSR)
|
|
-- |
|
107
|
|
S.E.Central Circle R.W,BBSR
|
RD - Chief Engineer, Buildings, RW CE
|
2469 dt.30.04.2026 (Tender-Online-C.C-05 of 2026 of C.C.E.C.R.W.C,BBSR)
|
|
-- |
|
108
|
|
S.E.Central Circle R.W,BBSR
|
RD - EIC-RW CE, RW CE
|
Transfer of RTI application dtd.22.02.2026 of Pradeep Kumar Sahoo, U/s 6(3) of RTI Act 2005.
|
|
-- |
|
109
|
|
S.E.Central Circle R.W,BBSR
|
RD - Chief Engineer, Plan Roads, RW CE
|
Submission of Interim deviation Statement for the work Impvt to MDR-68 to Bodasa road under MMSy-Improvement to Existing RD road in the Dist of Nayagarh for the year 2024-25.
|
|
-- |
|
110
|
|
S.E.Central Circle R.W,BBSR
|
RD - Chief Engineer, Plan Roads, RW CE
|
Submission of Closure Proposal for the work Impvt of Pratap Bhatapada Salia River road in the Dist of Khordha Under MMSY for the year 2021-22.
|
|
-- |
|
111
|
|
RW SE SUNABEDA
|
RD - EIC-RW CE, RW CE
|
Regarding depute of employees for undergoing accounts training at MDRAFM for the year 2026-27 (June-26)
|
|
-- |
|
112
|
|
RW SE SUNABEDA
|
RD - EIC-RW CE, RW CE
|
Allotment of seats for training on Financial Management at Micro Level in virtual mode in the year 2026-27 (Jun-26)
|
|
-- |
|
113
|
|
Executive Engineer
|
RD - EIC-RW CE, RW CE
|
Petition/grievance received in Janasunani portal ticket no C378427 dtd 20.03.2026
|
|
-- |
|
114
|
|
RW SE BALESWAR
|
Chief Engineer, Building and Bridge, RW CE
|
Revised estimate along with Deviation statement for thework Construciton of H.L. Bridge over river Salandi at 7.20 Km. on Kheranga to Hengupati road for 2021-22
|
|
-- |
|
115
|
|
Executive Engineer
|
RD - EIC-RW CE, RW CE
|
Petition/grievance received in Janasunani portal ticket no C345823 dtd 24.08.2025 of CharubalaB
|
|
-- |
|
116
|
|
Executive Engineer
|
RD - EIC-RW CE, RW CE
|
Petition/grievance received in Janasunani portal ticket no DEPT202514200769 dtd 25.11.2025 of Sri Dushmanta Kumar Punji
|
|
-- |
|
117
|
|
RW SE BALESWAR
|
Chief Engineer, Building and Bridge, RW CE
|
Submission of tender documents for the work Construction of C type Judicial Quarter (One Unit Duplex) for JMFC at Basta for 2025-26
|
|
-- |
|
118
|
|
Executive Engineer
|
RD - EIC-RW CE, RW CE
|
Petition/grievance received in Janasunani portal ticket no C381538 dtd 20.03.2026
|
|
-- |
|
119
|
|
Executive Engineer
|
Chief Engineer, Building and Bridge, RW CE
|
OFFICE ORDER
|
|
-- |
|
120
|
|
Executive Engineer
|
RD - Chief Engineer, Buildings, RW CE
|
OFFICE ORDER
|
|
-- |
|
121
|
|
Executive Engineer
|
RD - EIC-RW CE, RW CE
|
Petition/grievance received in Janasunani portal ticket no C37551 dtd 14.02.2026
|
|
-- |
|
122
|
|
Executive Engineer
|
RD - Chief Engineer, Plan Roads, RW CE
|
Requisition of funds for Road Works under Plan Scheme for the year 2026-27.
|
|
-- |
|
123
|
|
Executive Engineer
|
RD - Chief Engineer, Plan Roads, RW CE
|
Requisition of funds for Road Works under Plan Scheme for the year 2026-27.
|
|
-- |
|
124
|
|
Executive Engineer
|
RD - EIC-RW CE, RW CE
|
Requisition of funds for Road Works under Plan Scheme for the year 2026-27.
|
|
-- |
|
125
|
|
Executive Engineer
|
RD - EIC-RW CE, RW CE
|
Petition/grievance received in Janasunani portal ticket no C365353 dtd 09.12.2025
|
|
-- |
|
126
|
|
Executive Engineer
|
RD - Chief Engineer, Plan Roads, RW CE
|
Regarding the submission and appoval of Regular EOT in WAMIS for the work Constn. of Lasarda Lokasahi to Sankhajhara road under MMSY-TRIP in the district of Keonjhar.
|
|
-- |
|
127
|
|
Executive Engineer
|
RD - EIC-RW CE, RW CE
|
Petition/grievance received in Janasunani portal ticket no DM20251299564 dtd 20.08.2025 of Sri Pradeep Kumar Singh
|
|
-- |
|
128
|
|
Executive Engineer
|
RD - EIC-RW CE, RW CE
|
Petition/grievance received in Janasunani portal ticket no DEPT20251300880 dtd 10.10.2025 of Sri Basanta sarabu
|
|
-- |
|
129
|
|
RW SE BALESWAR
|
RD - Chief Engineer, Plan Roads, RW CE
|
Acceptance of tender for the work Impvt. to Ada-Anandapur Via-Maammedpur road under MMSY-Disaster Resilient roads scheme inthe District of Balaosre for the year 2025-26
|
|
-- |
|
130
|
|
Executive Engineer
|
RD - EIC-RW CE, RW CE
|
Petition/grievance received in Janasunani portal ticket no CS20251300882 dtd 13.08.2025 of Sri Basanta Sarabu
|
|
-- |
|
131
|
|
Executive Engineer
|
RD - EIC-RW CE, RW CE
|
Petition/grievance received in Janasunani portal ticket no C342868 dtd 07.08.2025
|
|
-- |
|
132
|
|
RW SE BALESWAR
|
RD - Chief Engineer, Plan Roads, RW CE
|
Submission of DPRs for project proposals under MMSY-Impvt. to existing RD road for the year 2026-27 for Accordance of A/A
|
|
-- |
|
133
|
|
RW SE BALESWAR
|
Chief Engineer, Building and Bridge, RW CE
|
Tender for the work Construction of HL Bridge over Pejagala Nallah at 5.10 Km. on Sanakhudi to Paikadiha in the District of Balaosre for 2025-26
|
|
-- |
|
134
|
|
RW SE BALESWAR
|
Chief Engineer, Building and Bridge, RW CE
|
Tender for the work Construction of H.L. Bridge over Parbati Jore at Parbati on HLC-III (Akhuapada to Bhandaripokhari) road in the District of Bhadrak for 2025-26
|
|
-- |
|
135
|
|
RW SE BALESWAR
|
Chief Engineer, Building and Bridge, RW CE
|
Submission of final Revised estimate along with deviaiton statement for the work Construction of New PHC Day Care Building at Bolanga PHC Baliapal uner State Plan Budget in the District of Balasore for 2024-25
|
|
-- |
|
136
|
|
Executive Engineer
|
RD - EIC-RW CE, RW CE
|
Petition/grievance received in Janasunani portal ticket no DM20251413356 dtd 29.01.2026 of Sri Raju Sahu
|
|
-- |
|
137
|
|
RW SE BALESWAR
|
Chief Engineer, Building and Bridge, RW CE
|
Submission of EOT application for the work Construction of New PHC Day Care Building at Bolanga PHC Baliapal uner State Plan Budget in the District of Balasore for 2024-25
|
|
-- |
|
138
|
|
Executive Engineer
|
RD - EIC-RW CE, RW CE
|
Petition/grievance received in Janasunani portal ticket no C353562 dtd 28.09.2025
|
|
-- |
|
139
|
|
RW SE BALESWAR
|
RD - Chief Engineer, Plan Roads, RW CE
|
Acceptance of tender for the work Construction of road from Haripur Panigrahisahi to Barunei (Palia) Via-Jurugadia under MMSY-CMRL Scheme in the District of Bhadrak for 2025-26
|
|
-- |
|
140
|
|
Executive Engineer
|
RD - EIC-RW CE, RW CE
|
Petition/grievance received in Janasunani portal ticket no DM20251413839 dtd 31.01.2026 of Sri Pramod Sahu
|
|
-- |
|
141
|
|
RW SE BALESWAR
|
Chief Engineer, Building and Bridge, RW CE
|
Submission of Bridge estimate for accordance of Administrative Approval
|
|
-- |
|
142
|
|
Executive Engineer
|
RD - Chief Engineer, Buildings, RW CE
|
Requirement for placement of funds for Construction of day care PHC building at behera in the district of kalahandi for the year 2023-24
|
|
-- |
|
143
|
|
Executive Engineer
|
RD - Chief Engineer, Plan Roads, RW CE
|
Requirement for placement of funds
|
|
-- |
|
144
|
|
Executive Engineer
|
RD - Chief Engineer, Plan Roads, RW CE
|
Requirement for placement of funds
|
|
-- |
|
145
|
|
Executive Engineer
|
RD - Chief Engineer, Plan Roads, RW CE
|
Requirement of funds for MMSY-Improvement to existing RD road.
|
|
-- |
|
146
|
|
Executive Engineer
|
RD - Chief Engineer, Plan Roads, RW CE
|
Requirement of funds for MMSY/TRIP Road.
|
|
-- |
|
147
|
|
Executive Engineer
|
RD - Chief Engineer, Plan Roads, RW CE
|
Shifting of water pipe line in the road work for construction of Baramile to Purusottampur road under MMSY-Improvement to existing RD road in the District of Balasore.
|
|
-- |
|
148
|
|
Executive Engineer
|
RD - Executive Engineer Establishment, RW CE
|
Submission of SLP No.155445 of 2024
|
|
-- |
|
149
|
|
Executive Engineer
|
RD - EIC-RW CE, RW CE
|
Submission of SLP No.155445 of 2024
|
|
-- |
|
150
|
|
Executive Engineer
|
RD - Chief Engineer, Plan Roads, RW CE
|
Submission of Estimate under the scheme MMSY for the year 2026-27
|
|
-- |
|
151
|
|
Executive Engineer
|
RD - Empowered Officer OSRRA, RW CE
|
Requisition for Authorization under PMGSY Administrative Expensive Fund
|
|
-- |
|
152
|
|
Executive Engineer
|
Chief Engineer, Building and Bridge, RW CE
|
Requisition for allotment of funds for an amount of Rs.11.06 Lakhs for the works Construction of HL Bridge over Local Nallah on Kakabul Road to Pelar of Luhanger GP for the year 2023-24 under the scheme BSY span 1x30.64mtr.
|
|
-- |
|
153
|
|
Executive Engineer
|
RD - EIC-RW CE, RW CE
|
Pension case of Sri Abani Kumar Rout, Executive Engineer (Retired).
|
|
-- |
|
154
|
|
Executive Engineer
|
Chief Engineer, Building and Bridge, RW CE
|
Requirement of fund for on-going R.I. Office building.
|
|
-- |
|
155
|
|
Executive Engineer
|
RD - Chief Engineer, Plan Roads, RW CE
|
Requirement of fund for MMSY-Improvement to existing RD.
|
|
-- |
|
156
|
|
Executive Engineer
|
RD - EIC-RW CE, RW CE
|
Preparedness for possible summer Cyclone in the month of May-2026.
|
|
-- |
|
157
|
|
Executive Engineer
|
RD - Chief Engineer, Plan Roads, RW CE
|
Regarding shifting of Electric poles from the road alignment of the work Construction of road from Dudhiasole to Mayurbhanja Border in the District of Balasore under MMSY-CMRL for the Year 2025-26 vide Agreement No. 03 P1 of 2026-27.
|
|
-- |
|
158
|
|
Executive Engineer
|
RD - Chief Engineer, Plan Roads, RW CE
|
Regarding shifting of Electric poles from the road alignment of the work Construction of road from JBC road at 14th km. Samptia road in the District of Balasore under MMSY-Improvement to existing RD Road for the Year 2025-26 vide Agreement No. 206 P1 of 2025-26.
|
|
-- |
|
159
|
|
Executive Engineer
|
RD - Chief Engineer, Plan Roads, RW CE
|
Requirement of funds for MMSY-CMRL road.
|
|
-- |
|
160
|
|
Executive Engineer
|
RD - Chief Engineer, Plan Roads, RW CE
|
Requirement of fund for MMSY-Improvement to existing RD Road.
|
|
-- |
|
161
|
|
Executive Engineer
|
RD - Chief Engineer, Plan Roads, RW CE
|
Requirement of fund for MMSY-Improvement to existing RD.
|
|
-- |
|
162
|
|
Executive Engineer
|
RD - Empowered Officer OSRRA, RW CE
|
Requirement of funds
|
|
-- |
|
163
|
|
Executive Engineer
|
RD - Chief Engineer, PMGSY, RW CE
|
Requirement of funds
|
|
-- |
|
164
|
|
Executive Engineer
|
RD - Empowered Officer OSRRA, RW CE
|
Requirement of funds
|
|
-- |
|
165
|
|
Executive Engineer
|
RD - Chief Engineer, PMGSY, RW CE
|
Requirement of funds
|
|
-- |
|
166
|
|
Executive Engineer
|
RD - EIC-RW CE, RW CE
|
Placement of Allotment under demand No. 28-2059
|
|
-- |
|
167
|
|
Executive Engineer
|
RD - EIC-RW CE, RW CE
|
Submission of Approval Para Wise Comments on Case W.P (C) No.31283 of 2025 filed by Shyam Sundar Rath
|
|
-- |
|
168
|
|
Executive Engineer
|
Chief Engineer, Building and Bridge, RW CE
|
Construction of HL bridge over river Salandi on Dhanunagar under Gujidarada GP.
|
|
-- |
|
169
|
|
RW SE BHABANIPATNA
|
RD - Chief Engineer, PMGSY, RW CE
|
Revised estimate and deviation statement for the PMGSY Package No.OR-24-303/PMGSY-III in the district of Nuapada
|
|
-- |
|
170
|
|
RW SE BHABANIPATNA
|
RD - Chief Engineer, Plan Roads, RW CE
|
Tender for the Work: “Construction of Badkhrimal to Palsijharan via Tentulichuan Road” in the district of Kalahandi under MMSY-TRIP
|
|
-- |