1
|
|
Executive Engineer
|
RD - EIC-RW CE, RW CE
|
Request for early listing and disposal of WP(C) No.31359 of 2024.
|
|
-- |
|
2
|
|
Executive Engineer
|
RD - Chief Engineer, Plan Roads, RW CE
|
Requirement of funds in IOTMS/WAMIS for payment of pending bills.
|
|
-- |
|
3
|
|
Executive Engineer
|
RD - Chief Engineer, PMGSY, RW CE
|
Submission of revised estimate and final deviation statement for the work- Annual Maintenance Plan for 5 years completed PMGSY (Post DLP) roads under Pkg. No.PM/PURI/53/2024-25
|
|
-- |
|
4
|
|
Executive Engineer
|
RD - EIC-RW CE, RW CE
|
Requisition of funds under OSRRA Administrative expenses Fundrnfor the month of March-2026.
|
|
-- |
|
5
|
|
Executive Engineer
|
RD - Chief Engineer, PMGSY, RW CE
|
Requisition of funds under OSRRA Administrative expenses Fundrnfor the month of March-2026.
|
|
-- |
|
6
|
|
Executive Engineer
|
RD - EIC-RW CE, RW CE
|
Requisition of funds under PIU Administrative expenses Fund forrnthe month of Marchy-2026.
|
|
-- |
|
7
|
|
Executive Engineer
|
RD - Chief Engineer, PMGSY, RW CE
|
Requisition of funds under PIU Administrative expenses Fund forrnthe month of Marchy-2026.
|
|
-- |
|
8
|
|
Executive Engineer
|
RD - EIC-RW CE, RW CE
|
Requisition of funds for payment of staff salary and other bills ofrnRCTRC for the month of March-2026.
|
|
-- |
|
9
|
|
Executive Engineer
|
RD - Chief Engineer, PMGSY, RW CE
|
Requisition of funds for payment of staff salary and other bills ofrnRCTRC for the month of March-2026.
|
|
-- |
|
10
|
|
Executive Engineer
|
RD - EIC-RW CE, RW CE
|
Financial Control and management of Govt. Funds during the financialrnYear 2026-27.
|
|
-- |
|
11
|
|
Executive Engineer
|
RD - EIC-RW CE, RW CE
|
Submission of list of works under State Funded Projects along with Deposit worksrn(Road/Bridge/Building) for assignment of Quality Monitors for the month of April 2026.
|
|
-- |
|
12
|
|
Executive Engineer
|
RD - EIC-RW CE, RW CE
|
Submission of Acknowledgement copy of provisional Gradation list of the Junior Clerks.
|
|
-- |
|
13
|
|
Executive Engineer
|
RD - Chief Engineer, Plan Roads, RW CE
|
Surrender of fund under D No. 42-2245-RANC-02-106-1192-21071-049 for the year 2025-26 S.D.R.F
|
|
-- |
|
14
|
|
Executive Engineer
|
RD - EIC-RW CE, RW CE
|
Surrender of fund under D No. 42-2245-RANC-02-106-1192-21071-049 for the year 2025-26 S.D.R.F
|
|
-- |
|
15
|
|
Executive Engineer
|
RD - Chief Engineer-I, RW CE
|
Surrender of fund under D No. 42-2245-RANC-02-106-1192-21071-049 for the year 2025-26 S.D.R.F
|
|
-- |
|
16
|
|
Executive Engineer
|
RD - EIC-RW CE, RW CE
|
Joining of Miss Smaranika Mohapatra, Asst. Executive Engineer, R.W. Sub-Division, Khallikote
|
|
-- |
|
17
|
|
Executive Engineer
|
RD - EIC-RW CE, RW CE
|
Assembly question Answer No. 3433 of Hon' ble MLA Sri Prasant Beherarn
|
|
-- |
|
18
|
|
Executive Engineer
|
RD - Chief Engineer-I, RW CE
|
Submission of UC for the month 03/2026
|
|
-- |
|
19
|
|
Executive Engineer
|
RD - Chief Engineer-I, RW CE
|
SLP No.154554 of 2024 (arising out of OA No.1390/2024 fiels by S.Behera
|
|
-- |
|
20
|
|
Executive Engineer
|
Chief Engineer, Building and Bridge, RW CE
|
Requirement of funds
|
|
-- |
|
21
|
|
Executive Engineer
|
RD - Chief Engineer-I, RW CE
|
Payment of outstanding electricity dues
|
|
-- |
|
22
|
|
Executive Engineer
|
RD - Empowered Officer OSRRA, RW CE
|
Requisition of BA for payment of Administrative expenses
|
|
-- |
|
23
|
|
Executive Engineer
|
RD - Chief Engineer, PMGSY, RW CE
|
Requisition of BA for payment of Administrative expenses
|
|
-- |
|
24
|
|
Executive Engineer
|
Chief Engineer, Building and Bridge, RW CE
|
Requirement of funds
|
|
-- |
|
25
|
|
Executive Engineer
|
Chief Engineer, Building and Bridge, RW CE
|
Requirement of funds
|
|
-- |
|
26
|
|
Executive Engineer
|
Chief Engineer, Building and Bridge, RW CE
|
Requirement of funds
|
|
-- |
|
27
|
|
Executive Engineer
|
RD - Chief Engineer-I, RW CE
|
WPC No.8311/2026 field by Pravakar Panda
|
|
-- |
|
28
|
|
Executive Engineer
|
RD - Chief Engineer, Plan Roads, RW CE
|
WPC No.8311/2026 field by Pravakar Panda
|
|
-- |
|
29
|
|
Executive Engineer
|
RD - Chief Engineer, Plan Roads, RW CE
|
Requirement of funds
|
|
-- |
|
30
|
|
Executive Engineer
|
RD - Chief Engineer-I, RW CE
|
Requirement of funds
|
|
-- |
|
31
|
|
Executive Engineer
|
Chief Engineer, Building and Bridge, RW CE
|
Submission of Geo-Technical investigation report and Hydraulic Particulars with compliance for the work- Construction of Bridge over river Balunga Patia on Charmania to Udayanathpur road in the District of Jajpur under SBY for the year 2024-25
|
|
-- |
|
32
|
|
Executive Engineer
|
RD - EIC-RW CE, RW CE
|
Submission of Geo-Technical investigation report and Hydraulic Particulars with compliance for the work- Construction of Bridge over river Balunga Patia on Charmania to Udayanathpur road in the District of Jajpur under SBY for the year 2024-25
|
|
-- |
|
33
|
|
Executive Engineer
|
RD - Chief Engineer, Buildings, RW CE
|
Submission of Geo-Technical investigation report and Hydraulic Particulars with compliance for the work- Construction of Bridge over river Balunga Patia on Charmania to Udayanathpur road in the District of Jajpur under SBY for the year 2024-25
|
|
-- |
|
34
|
|
Executive Engineer
|
RD - Chief Engineer, Plan Roads, RW CE
|
Requirement of funds
|
|
-- |
|
35
|
|
Executive Engineer
|
RD - Chief Engineer-I, RW CE
|
Requirement of funds
|
|
-- |
|
36
|
|
Executive Engineer
|
RD-Executive Engineer-Quality Control, RW CE
|
Submission of Soil investigation report for providing detailed drawing & Design for Construction of retaining wall for the work -Construction of H.L bridge over Kani Nallah at 2nd km on Mallikapur to Pallasahi road in the District of Jajpur
|
|
-- |
|
37
|
|
Executive Engineer
|
RD - EIC-RW CE, RW CE
|
Submission of Soil investigation report for providing detailed drawing & Design for Construction of retaining wall for the work -Construction of H.L bridge over Kani Nallah at 2nd km on Mallikapur to Pallasahi road in the District of Jajpur
|
|
-- |
|
38
|
|
Executive Engineer
|
RD-SE Quality control, RW CE
|
Submission of Soil investigation report for providing detailed drawing & Design for Construction of retaining wall for the work -Construction of H.L bridge over Kani Nallah at 2nd km on Mallikapur to Pallasahi road in the District of Jajpur
|
|
-- |
|
39
|
|
Executive Engineer
|
RD - Chief Engineer, Buildings, RW CE
|
Submission of revised estimate and 2nd interim Deviation statement for the work-Construction of Multipurpose Cyclone Shelter Type-A (3000sft) at Jayachandi High School , Kayan under Dasarathpur block for the year 2020-21 in the District of Jajpur
|
|
-- |
|
40
|
|
Executive Engineer
|
Chief Engineer, Building and Bridge, RW CE
|
Submission of revised estimate and 2nd interim Deviation statement for the work-Construction of Multipurpose Cyclone Shelter Type-A (3000sft) at Jayachandi High School , Kayan under Dasarathpur block for the year 2020-21 in the District of Jajpur
|
|
-- |
|
41
|
|
Executive Engineer
|
RD - Chief Engineer, Buildings, RW CE
|
Submission of Interim revised Estimate & Deviation statement for the work- Construction of New PHC building at Kuhika under Sukinda Block in the District of Jajpur for the year 2023-24
|
|
-- |
|
42
|
|
Executive Engineer
|
Chief Engineer, Building and Bridge, RW CE
|
Submission of Interim revised Estimate & Deviation statement for the work- Construction of New PHC building at Kuhika under Sukinda Block in the District of Jajpur for the year 2023-24
|
|
-- |
|
43
|
|
Executive Engineer
|
RD - Chief Engineer, PMGSY, RW CE
|
Submission of final revised and final deviation Package No.OR-02-PMGSY-PM-04
|
|
-- |
|
44
|
|
Executive Engineer
|
RD - EIC-RW CE, RW CE
|
Information on CDA Regarding better financial control & management of Govt. funds during the financial year 2026-27
|
|
-- |
|
45
|
|
Executive Engineer
|
RD - Chief Engineer-I, RW CE
|
Submission of DPR of projects
|
|
-- |
|
46
|
|
Executive Engineer
|
RD - Chief Engineer, Plan Roads, RW CE
|
Submission of DPR of projects
|
|
-- |
|
47
|
|
Executive Engineer
|
RD - Chief Engineer, Plan Roads, RW CE
|
Requirement of funds
|
|
-- |
|
48
|
|
Executive Engineer
|
RD - Chief Engineer-I, RW CE
|
Requirement of funds
|
|
-- |
|
49
|
|
Executive Engineer
|
RD - Chief Engineer, Buildings, RW CE
|
Submission of interim revised Estimate & deviation statement for the work -Construction of RI office cum Residence building at Dhaneswar under Korei block in the District of Jajpur for year 2022-23
|
|
-- |
|
50
|
|
Executive Engineer
|
Chief Engineer, Building and Bridge, RW CE
|
Submission of interim revised Estimate & deviation statement for the work -Construction of RI office cum Residence building at Dhaneswar under Korei block in the District of Jajpur for year 2022-23
|
|
-- |
|
51
|
|
Executive Engineer
|
Chief Engineer, Building and Bridge, RW CE
|
Requirement of funds
|
|
-- |
|
52
|
|
Executive Engineer
|
RD - Chief Engineer-I, RW CE
|
Reply AQ No.3979 put by Sri Sauvik Biswal Honble MLA
|
|
-- |
|
53
|
|
Executive Engineer
|
RD - Chief Engineer-I, RW CE
|
Reply AQ No.2694 put by Sri Padmalochan Panda Honble MLA
|
|
-- |
|
54
|
|
Executive Engineer
|
RD - Chief Engineer-I, RW CE
|
Submission of Allotment DANA
|
|
-- |
|
55
|
|
Executive Engineer
|
RD - Executive Engineer Establishment, RW CE
|
Joining report of Asmita Dey AEE RW Sub Division Bahanaga
|
|
-- |
|
56
|
|
Executive Engineer
|
RD - Executive Engineer-I, RW CE
|
Joining report of Asmita Dey AEE RW Sub Division Bahanaga
|
|
-- |
|
57
|
|
Executive Engineer
|
RD - Chief Engineer-I, RW CE
|
Joining report of Asmita Dey AEE RW Sub Division Bahanaga
|
|
-- |
|
58
|
|
Executive Engineer
|
RD - Executive Engineer-Establishment & allied works, RW CE
|
Joining report of Asmita Dey AEE RW Sub Division Bahanaga
|
|
-- |
|
59
|
|
Executive Engineer
|
RD - Chief Engineer-I, RW CE
|
Joining report of Asmita Dey AEE RW Sub Division Bahanaga
|
|
-- |
|
60
|
|
Executive Engineer
|
Chief Engineer, Building and Bridge, RW CE
|
Requirement of funds
|
|
-- |
|
61
|
|
Executive Engineer
|
Chief Engineer, Building and Bridge, RW CE
|
Requirement of funds
|
|
-- |
|
62
|
|
Executive Engineer
|
Chief Engineer, Building and Bridge, RW CE
|
Construction of HL Bridge over Bandheisuni Nallah at falada Sasan at KhairarnRoad in the District of Balasore under BSY for the year 202L-22rnRegarding incentive proposal of the work
|
|
-- |
|
63
|
|
Executive Engineer
|
RD - Chief Engineer-I, RW CE
|
Information of NMR/DLR/work charged employees
|
|
-- |
|
64
|
|
Executive Engineer
|
RD - Chief Engineer, Plan Roads, RW CE
|
Requirement of funds
|
|
-- |
|
65
|
|
Executive Engineer
|
Chief Engineer, Building and Bridge, RW CE
|
Construction of H.L Bridge over river Tantighai at 3rd km on MDR-14 to Kantia via Bhanra -Bhurunga road for the year 2022-23
|
|
-- |
|
66
|
|
Executive Engineer
|
RD - Chief Engineer, Buildings, RW CE
|
Construction of H.L Bridge over river Tantighai at 3rd km on MDR-14 to Kantia via Bhanra -Bhurunga road for the year 2022-23
|
|
-- |
|
67
|
|
Executive Engineer
|
RD - EIC-RW CE, RW CE
|
Assembly Question Answer No. 2574 of Hon' ble MLA Sri Soubhik Biswal
|
|
-- |
|
68
|
|
Executive Engineer
|
Chief Engineer, Building and Bridge, RW CE
|
Submission of UC
|
|
-- |
|
69
|
|
Executive Engineer
|
RD - Chief Engineer-I, RW CE
|
Revised submission of requisition
|
|
-- |
|
70
|
|
Executive Engineer
|
RD - Chief Engineer, PMGSY, RW CE
|
Revised submission of requisition
|
|
-- |
|
71
|
|
Executive Engineer
|
RD - Chief Engineer, PMGSY, RW CE
|
Requisition of funds for PMGSY-III
|
|
-- |
|
72
|
|
Executive Engineer
|
RD - Chief Engineer, Plan Roads, RW CE
|
Requirement of funds
|
|
-- |
|
73
|
|
Executive Engineer
|
RD - Chief Engineer, Plan Roads, RW CE
|
Requirement of funds
|
|
-- |
|
74
|
|
Executive Engineer
|
Chief Engineer, Building and Bridge, RW CE
|
Requirement of funds
|
|
-- |
|
75
|
|
Executive Engineer
|
RD - Chief Engineer-I, RW CE
|
AQ No.3433 put by Sri Prasanta Kumar Behera Honble MLA
|
|
-- |
|
76
|
|
Executive Engineer
|
RD - Chief Engineer, Plan Roads, RW CE
|
Submission of DPRs for new road project proposal under the scheme SDMF during the current financial year in the District of Jajpur
|
|
-- |
|
77
|
|
Executive Engineer
|
RD - Chief Engineer-I, RW CE
|
AQ No.2342 put by Sri Ranedra Pratap Swain Honble MLA
|
|
-- |
|
78
|
|
Executive Engineer
|
RD - Chief Engineer-I, RW CE
|
Submission of Form-51 for the month of 02/2026
|
|
-- |
|
79
|
|
Executive Engineer
|
RD - EIC-RW CE, RW CE
|
Submission of Form-51 for the month of 02/2026
|
|
-- |
|
80
|
|
Executive Engineer
|
RD - Chief Engineer-I, RW CE
|
AQ No.3485 put by Sri Padmalochan Panda Honble MLA
|
|
-- |
|
81
|
|
Executive Engineer
|
RD - Chief Engineer-I, RW CE
|
AQ No.2378 put by Sri Madhab Dhada Honble MLA
|
|
-- |
|
82
|
|
RW SE KEONJHAR
|
RD - Chief Engineer, Buildings, RW CE
|
Submission of detailed estimates for the Bridges work under SBY for Technical Sanction.
|
|
-- |
|
83
|
|
Executive Engineer
|
RD - Chief Engineer, PMGSY, RW CE
|
Submission of deviation Post DLP Package No.OR-02-PMGSY PM-03
|
|
-- |
|
84
|
|
Executive Engineer
|
RD - Chief Engineer, PMGSY, RW CE
|
Submission of deviation Post DLP Package No.OR-02-PMGSY PM-05
|
|
-- |
|
85
|
|
Executive Engineer
|
RD - EIC-RW CE, RW CE
|
Submission of Final ATR on inspection of PMGSY works by N.Q.M.
|
|
-- |
|
86
|
|
Executive Engineer
|
RD-SE Quality control, RW CE
|
Submission of Final ATR on inspection of PMGSY works by N.Q.M.
|
|
-- |
|
87
|
|
Executive Engineer
|
RD - EIC-RW CE, RW CE
|
OGFR-2 Handed over / Taken over Charges
|
|
-- |
|
88
|
|
Executive Engineer
|
RD - EIC-RW CE, RW CE
|
Submission of Revised estimate and 2nd interim Deviation statement for the work- Construction of Multipurpose Cyclone Shelter Type-A (3000 sft) at BCJ High school Jari under Binjharpur block for the year 2020-21 in the District of Jajpur
|
|
-- |
|
89
|
|
Executive Engineer
|
RD - Chief Engineer-I, RW CE
|
Submission of Revised estimate and 2nd interim Deviation statement for the work- Construction of Multipurpose Cyclone Shelter Type-A (3000 sft) at BCJ High school Jari under Binjharpur block for the year 2020-21 in the District of Jajpur
|
|
-- |
|
90
|
|
Executive Engineer
|
Chief Engineer, Building and Bridge, RW CE
|
Submission of final reised estimate & eviation statement for the work - Construction of Bridge over Rahania Nallah at 1st km on R&B road to Rahania Sahi (Ranapur village ) road for the year 2018-19 under BSY
|
|
-- |
|
91
|
|
Executive Engineer
|
RD - Chief Engineer, Buildings, RW CE
|
Submission of final reised estimate & eviation statement for the work - Construction of Bridge over Rahania Nallah at 1st km on R&B road to Rahania Sahi (Ranapur village ) road for the year 2018-19 under BSY
|
|
-- |
|
92
|
|
Executive Engineer
|
RD - Chief Engineer, Buildings, RW CE
|
Submission of final revised estimate & Deviation statement for the work-Construction of R.I office cum residence building at Bangarkota under Danagadi block in the District of Jajpur for the year 2022-23
|
|
-- |
|
93
|
|
Executive Engineer
|
Chief Engineer, Building and Bridge, RW CE
|
Submission of final revised estimate & Deviation statement for the work-Construction of R.I office cum residence building at Bangarkota under Danagadi block in the District of Jajpur for the year 2022-23
|
|
-- |
|
94
|
|
Executive Engineer
|
RD - Chief Engineer, PMGSY, RW CE
|
Requirement of funds for Payment to the Outsourced agency towards supply of one number of Accounts Clerk for the Month of March-2026 out of PMGSY Administrative fund.
|
|
-- |
|
95
|
|
Executive Engineer
|
RD-SE Quality control, RW CE
|
Construction of Bridge over Ganda Nallah on Daniabar chhak to Marutikara RD road in the District of Jajpur under BSY for the year 2023-24
|
|
-- |
|
96
|
|
Executive Engineer
|
RD-Executive Engineer-Quality Control, RW CE
|
Construction of Bridge over Ganda Nallah on Daniabar chhak to Marutikara RD road in the District of Jajpur under BSY for the year 2023-24
|
|
-- |
|
97
|
|
Executive Engineer
|
RD - EIC-RW CE, RW CE
|
Construction of Bridge over Ganda Nallah on Daniabar chhak to Marutikara RD road in the District of Jajpur under BSY for the year 2023-24
|
|
-- |
|
98
|
|
Executive Engineer
|
RD - EIC-RW CE, RW CE
|
Joining of Sri Anish Subudhi Ray, Asst Executive Engineer, Rural Works Division, Kendrapara.
|
|
-- |
|
99
|
|
Executive Engineer
|
RD - Chief Engineer-I, RW CE
|
Submission of monthly expenditure 02/2026
|
|
-- |
|
100
|
|
Executive Engineer
|
RD - Chief Engineer-I, RW CE
|
Submission of monthly expenditure 02/2026
|
|
-- |
|
101
|
|
Executive Engineer
|
Chief Engineer, Building and Bridge, RW CE
|
Submission of requisition
|
|
-- |
|
102
|
|
Executive Engineer
|
RD - Chief Engineer, PMGSY, RW CE
|
Requisition of funds
|
|
-- |
|
103
|
|
Executive Engineer
|
RD - Empowered Officer OSRRA, RW CE
|
Requisition of funds
|
|
-- |
|
104
|
|
Executive Engineer
|
RD - EIC-RW CE, RW CE
|
Reply to Assembly Question No.2888 put by Sri Ranendra Pratap Swain, MLA
|
|
-- |
|
105
|
|
Executive Engineer
|
RD - Chief Engineer, Plan Roads, RW CE
|
Work Order for the work PWD road to Saralia RD road
|
|
-- |
|
106
|
|
Executive Engineer
|
RD - Chief Engineer-I, RW CE
|
Work Order for the work Biranchipur to Kuagadia road
|
|
-- |
|
107
|
|
Executive Engineer
|
RD - Chief Engineer, Plan Roads, RW CE
|
Work Order for the work Biranchipur to Kuagadia road
|
|
-- |
|
108
|
|
Executive Engineer
|
SE Design, RW CE
|
Submission of Sub soil investigation report
|
|
-- |
|
109
|
|
Executive Engineer
|
RD - Chief Engineer-I, RW CE
|
Submission of Sub soil investigation report
|
|
-- |
|
110
|
|
Executive Engineer
|
RD - Chief Engineer-I, RW CE
|
Reply AQ No1756 put by Sri Padmalochan Panda Honble MLA
|
|
-- |
|
111
|
|
Executive Engineer
|
RD - Chief Engineer, Plan Roads, RW CE
|
CONTC No.442/2026 Sri R.Panda
|
|
-- |
|
112
|
|
Executive Engineer
|
Chief Engineer, Building and Bridge, RW CE
|
Requirement of funds
|
|
-- |
|
113
|
|
Executive Engineer
|
RD - Chief Engineer-I, RW CE
|
Reply AQ No.1760 put by Sri A.Ku.Nayak Honble MLA
|
|
-- |
|
114
|
|
Executive Engineer
|
RD - Chief Engineer-I, RW CE
|
Reply AQ No.2468 put by Sri Tara Pr.Bahinipati Honble MLA
|
|
-- |
|
115
|
|
Executive Engineer
|
RD - Chief Engineer-I, RW CE
|
Reply AQ No.2550 put by Sri R.Ch.Behera Honble MLA
|
|
-- |
|
116
|
|
Executive Engineer
|
RD - Chief Engineer, Plan Roads, RW CE
|
Requirement of funds
|
|
-- |
|
117
|
|
Executive Engineer
|
RD - Chief Engineer, Plan Roads, RW CE
|
Requirement of funds
|
|
-- |
|
118
|
|
Executive Engineer
|
RD - Chief Engineer, PMGSY, RW CE
|
Revised funds for PMGSY-III
|
|
-- |
|
119
|
|
Executive Engineer
|
RD - Empowered Officer OSRRA, RW CE
|
Revised funds for PMGSY-III
|
|
-- |
|
120
|
|
Executive Engineer
|
RD - Chief Engineer-I, RW CE
|
Work order for the work
|
|
-- |
|
121
|
|
Executive Engineer
|
RD - Chief Engineer, Plan Roads, RW CE
|
Work order for the work
|
|
-- |
|
122
|
|
Executive Engineer
|
Chief Engineer, Building and Bridge, RW CE
|
Requirement of funds
|
|
-- |
|
123
|
|
Executive Engineer
|
RD-SE Quality control, RW CE
|
Construction of H.L Bridge over Nuadihi Nallah at 0.40 km on Nuadihi to Pimpudia (PS) road in the District of Jajpur under BSY for the year 223-24 vide Divisional Agreement No. 354 P1 of 2023-24
|
|
-- |
|
124
|
|
Executive Engineer
|
RD-Executive Engineer-Quality Control, RW CE
|
Construction of H.L Bridge over Nuadihi Nallah at 0.40 km on Nuadihi to Pimpudia (PS) road in the District of Jajpur under BSY for the year 223-24 vide Divisional Agreement No. 354 P1 of 2023-24
|
|
-- |
|
125
|
|
Executive Engineer
|
RD - EIC-RW CE, RW CE
|
Construction of H.L Bridge over Nuadihi Nallah at 0.40 km on Nuadihi to Pimpudia (PS) road in the District of Jajpur under BSY for the year 223-24 vide Divisional Agreement No. 354 P1 of 2023-24
|
|
-- |
|
126
|
|
Executive Engineer
|
RD - Chief Engineer-I, RW CE
|
Submission of Surrender proposal for repair , renovation & restoration road (Non-Plan) work for the year 2025-26
|
|
-- |
|
127
|
|
Executive Engineer
|
RD - EIC-RW CE, RW CE
|
Submission of Surrender proposal for repair , renovation & restoration road (Non-Plan) work for the year 2025-26
|
|
-- |
|
128
|
|
Executive Engineer
|
RD - Chief Engineer-I, RW CE
|
Submission of Estimate for CWA road during the year 2025-26
|
|
-- |
|
129
|
|
Executive Engineer
|
RD - EIC-RW CE, RW CE
|
Submission of Estimate for CWA road during the year 2025-26
|
|
-- |
|
130
|
|
Executive Engineer
|
RD - Chief Engineer, PMGSY, RW CE
|
Requisition of funds for Shifting & Construction of 10 KVA S/S & L.T Line for the work Construction of road CD eorks MRL Sukinda to Sansailo chhak NH 53 to via-Patapur road under PMGSY Pkg No. OR-13-422
|
|
-- |
|
131
|
|
Executive Engineer
|
RD - EIC-RW CE, RW CE
|
Assembly Question Answer No. 1028 of Hon' ble MLA Sri Madhab Dhada
|
|
-- |
|
132
|
|
Executive Engineer
|
RD - EIC-RW CE, RW CE
|
Submission of allotment expenditure and surrender of fund under D.No.42-2254-RANC-02-flood, Cyclone etc-106-Repair and restration of damaged road and bridges-1192-repair, renovation and restoration-21071-repair roads-049-other Revenue expenditure for the year 2025-26 S.
|
|
-- |
|
133
|
|
Executive Engineer
|
SE Design, RW CE
|
Submission of lists of works under state funded projects along with Deposit works Road/ Bridges/ Building for assignment of Quality Monitors for the month on April'2026.
|
|
-- |
|
134
|
|
Executive Engineer
|
RD-SE Quality control, RW CE
|
Submission of lists of works under state funded projects along with Deposit works Road/ Bridges/ Building for assignment of Quality Monitors for the month on April'2026.
|
|
-- |
|
135
|
|
Executive Engineer
|
RD - Chief Engineer-I, RW CE
|
Regarding simultaneous payment of Dearness Relif DR Dearness Allowance DA to Government Officials.
|
|
-- |
|
136
|
|
Executive Engineer
|
Chief Engineer, Building and Bridge, RW CE
|
Submission of requisition of Health Deptt
|
|
-- |
|
137
|
|
Executive Engineer
|
Chief Engineer, Building and Bridge, RW CE
|
Requirement of funds
|
|
-- |
|
138
|
|
Executive Engineer
|
RD - Chief Engineer, Plan Roads, RW CE
|
Escalation claim bill for the work
|
|
-- |
|
139
|
|
Executive Engineer
|
Chief Engineer, Building and Bridge, RW CE
|
Requirement of token allotment
|
|
-- |
|
140
|
|
Executive Engineer
|
RD - EIC-RW CE, RW CE
|
Engagement of Data Entry Operator on Outsourcing basis in Rural Works Division Officer, Jajpur
|
|
-- |
|
141
|
|
Executive Engineer
|
RD - Chief Engineer-I, RW CE
|
AQ No.1073 put by Sri Pabitra Saunta Honble MLA
|
|
-- |
|
142
|
|
Executive Engineer
|
RD - Chief Engineer, Plan Roads, RW CE
|
Request to un-locl the work lD (42/5654) for the work,,constn. of road from RD road chakapada to road via Hara N4ohapatra sahi under MMsy-TRlp for zo23_24, in wAMts portalfor preparation of final bill
|
|
-- |
|
143
|
|
Executive Engineer
|
RD - Chief Engineer-I, RW CE
|
Request to un-locl the work lD (42/5654) for the work,,constn. of road from RD road chakapada to road via Hara N4ohapatra sahi under MMsy-TRlp for zo23_24, in wAMts portalfor preparation of final bill
|
|
-- |
|
144
|
|
Executive Engineer
|
Chief Engineer, Building and Bridge, RW CE
|
Requirement of funds for completion of on-going bridge projects underrnSetu Bandhan Yojana
|
|
-- |
|
145
|
|
Executive Engineer
|
RD - Chief Engineer, Plan Roads, RW CE
|
Requirement of funds under CMRL Head of Account for payment of nrnning
|
|
-- |
|
146
|
|
Executive Engineer
|
RD - EIC-RW CE, RW CE
|
Submission of Estimate for CWA road during the year 2025-26
|
|
-- |
|
147
|
|
Executive Engineer
|
RD - Chief Engineer-I, RW CE
|
Submission of Estimate for CWA road during the year 2025-26
|
|
-- |
|
148
|
|
Executive Engineer
|
RD - Chief Engineer, Plan Roads, RW CE
|
Surrender of funds under the Head of Account 28-5054-04-337-2373-78203-073-21-1-1.
|
|
-- |
|
149
|
|
Executive Engineer
|
Chief Engineer, Building and Bridge, RW CE
|
Surrender of funds under the head of Account 28-4059-01-789-2148-37114-072-21-1-2.
|
|
-- |
|
150
|
|
Executive Engineer
|
RD - Chief Engineer-I, RW CE
|
AQ No.1028 put by Sri Madhab Dhada Honble MLA
|
|
-- |
|
151
|
|
Executive Engineer
|
RD - Chief Engineer, Plan Roads, RW CE
|
Requirement of funds under MMSY Improvement to existing RD road for payment of running bill
|
|
-- |
|
152
|
|
Executive Engineer
|
Chief Engineer, Building and Bridge, RW CE
|
Submission of up to date UC construction of Sub center building XV-FC for 2022-23
|
|
-- |
|
153
|
|
Executive Engineer
|
RD - Chief Engineer, Plan Roads, RW CE
|
Requirement of funds under MMSY-Improvement to existing RD road
|
|
-- |
|
154
|
|
Establishment - II
|
RD - EIC-RW CE, RW CE
|
PAY PARTICUOLARS IN FAVOUR OF ER. DEVI PRASAD MOHAPATRA
|
|
-- |