1
|
|
RW EE BALASORE - I
|
RD - EIC-RW CE, RW CE
|
Grievance petition under CPGRAM filed by Chinmay Rana
|
|
-- |
|
2
|
|
RW EE BALASORE - I
|
RD - Chief Engineer, PMGSY, RW CE
|
Grievance petition under CPGRAM filed by Chinmay Rana
|
|
-- |
|
3
|
|
RW EE BALASORE - I
|
Chief Engineer, Building and Bridge, RW CE
|
Submission of revised estimate and deviation statement for the work HL Bridge over River Sono on Matiali to Baincha road for the year 2021-22
|
|
-- |
|
4
|
|
RW EE BALASORE - I
|
RD - Chief Engineer, Plan Roads, RW CE
|
Regarding requirement of funds for allotment as well as authorisation
|
|
-- |
|
5
|
|
RW EE BALASORE - I
|
RD - EIC-RW CE, RW CE
|
Joining of Dri Himansu Sekhar Pratihari AEE R.W.Sub-Division, Nilgiri
|
|
-- |
|
6
|
|
Executive Engineer
|
RD - Chief Engineer, Buildings, RW CE
|
Regarding Payment of Utility Shifting for the work-Construction of Bridge over river Baitarani at 0.50 km on Beherapatana to Balipokhari PS road under BSY in the District of Jajpur for the year 2023-24
|
|
-- |
|
7
|
|
Executive Engineer
|
Chief Engineer, Building and Bridge, RW CE
|
Regarding Payment of Utility Shifting for the work-Construction of Bridge over river Baitarani at 0.50 km on Beherapatana to Balipokhari PS road under BSY in the District of Jajpur for the year 2023-24
|
|
-- |
|
8
|
|
Executive Engineer
|
Chief Engineer, Building and Bridge, RW CE
|
Submission of DPRs for new Bridge project proposal under the scheme SBY for the the year 2026-27 in the District of Jajpur
|
|
-- |
|
9
|
|
Executive Engineer
|
RD - Chief Engineer, Buildings, RW CE
|
Submission of DPRs for new Bridge project proposal under the scheme SBY for the the year 2026-27 in the District of Jajpur
|
|
-- |
|
10
|
|
Executive Engineer
|
Chief Engineer, Building and Bridge, RW CE
|
Submission of DPRs for new Bridge project proposal under the scheme SBY for the the year 2025-26 in the District of Jajpur
|
|
-- |
|
11
|
|
Executive Engineer
|
RD - Chief Engineer, Buildings, RW CE
|
Submission of DPRs for new Bridge project proposal under the scheme SBY for the the year 2025-26 in the District of Jajpur
|
|
-- |
|
12
|
|
Executive Engineer
|
RD - Chief Engineer, PMGSY, RW CE
|
Final show cause for delay in completion of work-Impvt. to Road and CD work under PMGSY Pkg No. OR-13-396 Uttarkhajuria to Sundarpokhari via Tarakote in the District of Jajpur for the year 2022-23
|
|
-- |
|
13
|
|
Executive Engineer
|
RD - Chief Engineer, PMGSY, RW CE
|
Final show cause for the work -Improvement to road & CD work under PMGSY Pkg No. OR-13-402 (PMGSY-III) (NH 215 to Fartipur) in the district of Jajpur 2022-23
|
|
-- |
|
14
|
|
Executive Engineer
|
RD - EIC-RW CE, RW CE
|
2nd and final Reminder for complieance of defect liability period DLP obligation and pending ATRs under PMGSY of Package No OR-06-63
|
|
-- |
|
15
|
|
Executive Engineer
|
RD - Chief Engineer, Plan Roads, RW CE
|
2nd and final Reminder for complieance of defect liability period DLP obligation and pending ATRs under PMGSY of Package No OR-06-63
|
|
-- |
|
16
|
|
Executive Engineer
|
RD - Chief Engineer-III, RW CE
|
Submission of details status report for correctness of all ongoing works executed by M/s Shree Infra and Co
|
|
-- |
|
17
|
|
Executive Engineer
|
RD - EIC-RW CE, RW CE
|
Submission of details status report for correctness of all ongoing works executed by M/s Shree Infra and Co
|
|
-- |
|
18
|
|
Executive Engineer
|
RD - EIC-RW CE, RW CE
|
Submission of substitute proposal under AMP 2026-27
|
|
-- |
|
19
|
|
Executive Engineer
|
RD - Chief Engineer, PMGSY, RW CE
|
Requisition of Bank authorization for post 5 year completed post DLP PMGSY roads under periodical Maintenance.
|
|
-- |
|
20
|
|
Executive Engineer
|
RD - EIC-RW CE, RW CE
|
Requisition of Bank authorization for post 5 year completed post DLP PMGSY roads under periodical Maintenance.
|
|
-- |
|
21
|
|
Executive Engineer
|
RD - EIC-RW CE, RW CE
|
Repair of road from Jaitalanga to Dalana RD road for Car festival.
|
|
-- |
|
22
|
|
Executive Engineer
|
RD - EIC-RW CE, RW CE
|
Joining Report of Er. Sipijimi Behera, Junior Engineer.
|
|
-- |
|
23
|
|
Executive Engineer
|
Chief Engineer, Building and Bridge, RW CE
|
Submission of testing report for the work Construction of H.L Bridge over river Alaka near Rasalpur High School at Kaliabora P.S road under Setu Bandhan Yojana (SBY) for the year 2024-25 in the District of Jagatsinghpur.
|
|
-- |
|
24
|
|
Executive Engineer
|
RD - EIC-RW CE, RW CE
|
Submission of testing report for the work Construction of H.L Bridge over river Alaka near Rasalpur High School at Kaliabora P.S road under Setu Bandhan Yojana (SBY) for the year 2024-25 in the District of Jagatsinghpur.
|
|
-- |
|
25
|
|
Executive Engineer
|
RD - Chief Engineer, Plan Roads, RW CE
|
Slow progress for the work Improvement to Jagannathpur Garam road under MMSY-Improvement to existing RD road for the year 2025-26 in the District of Jagatsinghpur.
|
|
-- |
|
26
|
|
Executive Engineer
|
RD - EIC-RW CE, RW CE
|
Slow progress for the work Improvement to Jagannathpur Garam road under MMSY-Improvement to existing RD road for the year 2025-26 in the District of Jagatsinghpur.
|
|
-- |
|
27
|
|
Executive Engineer
|
RD - EIC-RW CE, RW CE
|
Requisition of pending Bills.
|
|
-- |
|
28
|
|
Executive Engineer
|
RD - Chief Engineer, Plan Roads, RW CE
|
Requisition of pending Bills.
|
|
-- |
|
29
|
|
Executive Engineer
|
RD - EIC-RW CE, RW CE
|
Submission of Final ATR on SQM's Reports.
|
|
-- |
|
30
|
|
Executive Engineer
|
RD-SE Quality control, RW CE
|
Submission of Final ATR on SQM's Reports.
|
|
-- |
|
31
|
|
Executive Engineer
|
RD - EIC-RW CE, RW CE
|
Requisition of pending Bills.
|
|
-- |
|
32
|
|
Executive Engineer
|
RD - Chief Engineer, Plan Roads, RW CE
|
Requisition of pending Bills.
|
|
-- |
|
33
|
|
Executive Engineer
|
RD - Chief Engineer, Plan Roads, RW CE
|
Request for placement of fund under Demand No. 28-5054-80-796-1230-37341-073rn(MMSY-CMRL).
|
|
-- |
|
34
|
|
Executive Engineer
|
RD - Chief Engineer, Buildings, RW CE
|
Regarding permission for inviting fresh tender up-gradation high school, Konkarada under Polasara block.
|
|
-- |
|
35
|
|
Executive Engineer
|
Chief Engineer, Building and Bridge, RW CE
|
Tender for the work- Construction of. PHC(N) Building at Rahada under Beguniapada Block in the district of Ganjam for the year 2024-25.
|
|
-- |
|
36
|
|
Executive Engineer
|
Chief Engineer, Building and Bridge, RW CE
|
Construction of RW Section Office building Beguniapada-I for the year 2025-26.
|
|
-- |
|
37
|
|
SE RW Kendrapara
|
RD - EIC-RW CE, RW CE
|
RTI Application on dtd. 19.06.2026 of Sri Surya Kanta Prusty.
|
|
-- |
|
38
|
|
SE RW Kendrapara
|
RD - EIC-RW CE, RW CE
|
RTI Application on dd. 05.06.2026 of Sri Adarsh Agrawal
|
|
-- |
|
39
|
|
SE RW Kendrapara
|
RD - EIC-RW CE, RW CE
|
RTI Application on dtd. 06.06.2026 of Sri Adarsh Agrawal
|
|
-- |
|
40
|
|
Executive Engineer
|
RD - EIC-RW CE, RW CE
|
Joining report of Sri Sanjeep Kumar Rath, Assistant Executive Engineer.
|
|
-- |
|
41
|
|
Executive Engineer
|
RD - EIC-RW CE, RW CE
|
Information on ongoing works awarded in favour of M/s Shree Infra and Co.
|
|
-- |
|
42
|
|
Executive Engineer
|
RD - Chief Engineer, Buildings, RW CE
|
2nd Corrigendum to Tender call Notice No- Tender Online RWD/KPD - 02 of 2026-27
|
|
-- |
|
43
|
|
Executive Engineer
|
RD - Chief Engineer, Plan Roads, RW CE
|
2nd Corrigendum to Tender call Notice No- Tender Online RWD/KPD - 02 of 2026-27
|
|
-- |
|
44
|
|
Executive Engineer
|
RD - EIC-RW CE, RW CE
|
2nd Corrigendum to Tender call Notice No- Tender Online RWD/KPD - 02 of 2026-27
|
|
-- |
|
45
|
|
Executive Engineer
|
RD - EIC-RW CE, RW CE
|
2nd Corrigendum to Tender call Notice No- Tender Online RWD/KPD - 01 of 2026-27
|
|
-- |
|
46
|
|
Supt. Engineer
|
RD - EIC-RW CE, RW CE
|
Transfer of RTI application
|
|
-- |
|
47
|
|
Supt. Engineer
|
RD - EIC-RW CE, RW CE
|
Transfer of RTI application
|
|
-- |
|
48
|
|
Supt. Engineer
|
RD - EIC-RW CE, RW CE
|
Transfer of RTI application
|
|
-- |
|
49
|
|
Supt. Engineer
|
RD - EIC-RW CE, RW CE
|
Transfer of RTI application
|
|
-- |
|
50
|
|
Supt. Engineer
|
RD - EIC-RW CE, RW CE
|
Transfer of RTI application
|
|
-- |
|
51
|
|
Supt. Engineer
|
RD - EIC-RW CE, RW CE
|
Transfer of RTI application
|
|
-- |
|
52
|
|
Supt. Engineer
|
RD - EIC-RW CE, RW CE
|
Transfer of RTI application
|
|
-- |
|
53
|
|
Supt. Engineer
|
RD - EIC-RW CE, RW CE
|
Transfer of RTI application
|
|
-- |
|
54
|
|
Supt. Engineer
|
RD - EIC-RW CE, RW CE
|
Transfer of RTI application
|
|
-- |
|
55
|
|
Supt. Engineer
|
RD - EIC-RW CE, RW CE
|
Transfer of RTI application
|
|
-- |
|
56
|
|
Supt. Engineer
|
RD - EIC-RW CE, RW CE
|
Transfer of RTI application
|
|
-- |
|
57
|
|
Executive Engineer
|
RD - EIC-RW CE, RW CE
|
Submission of monthly expenditure statement under salaries of work charged employees for July 2026.
|
|
-- |
|
58
|
|
Executive Engineer
|
RD - EIC-RW CE, RW CE
|
Submission of monthly expenditure statement for the month of July 2026.
|
|
-- |
|
59
|
|
Executive Engineer
|
RD - EIC-RW CE, RW CE
|
Joining Intimation of J.Es under this Division.
|
|
-- |
|
60
|
|
Executive Engineer
|
Chief Engineer, Building and Bridge, RW CE
|
Letter of Acceptance for work- Construction of H.L Bridge On Satapuri to Niali raod via- Miteipur
|
|
-- |
|
61
|
|
Executive Engineer
|
Chief Engineer, Building and Bridge, RW CE
|
Letter of Acceptance for work- Construction of bridge over Local Nallah on Panichhatra to Suhagpur road in the Dist of Puri for 2024-25 under SBY.
|
|
-- |
|
62
|
|
Executive Engineer
|
Chief Engineer, Building and Bridge, RW CE
|
Requirement of Token Money for Bridge works.
|
|
-- |
|
63
|
|
Executive Engineer
|
RD - Chief Engineer, Plan Roads, RW CE
|
Request to drop the road proposal - N.A road to Bhogasalada road under MMSY-Improvement to Existing R.D road.
|
|
-- |
|
64
|
|
Executive Engineer
|
RD - EIC-RW CE, RW CE
|
Request to drop the road proposal - N.A road to Bhogasalada road under MMSY-Improvement to Existing R.D road.
|
|
-- |
|
65
|
|
Executive Engineer
|
RD - EIC-RW CE, RW CE
|
e-Procurement Notice for 09 nos. of Building works.
|
|
-- |
|
66
|
|
Executive Engineer
|
RD - Chief Engineer, Plan Roads, RW CE
|
e-Procurement Notice for 09 nos. of Building works.
|
|
-- |
|
67
|
|
Executive Engineer
|
RD - EIC-RW CE, RW CE
|
1st Corrigendum to Bid Identification No- Tender-Online-Divn-NPR-04/2026-27 dtd. 10.06.2026 invited by The Superintending Engineer, Rural Works Division, Nimapara vide Letter No- 3297 dtd. 16.06.2026.
|
|
-- |
|
68
|
|
Executive Engineer
|
RD - Chief Engineer, Plan Roads, RW CE
|
Requirement of funds for work- Construction of road from Mallada College road to Ankua Via Amarual for 2024-25.
|
|
-- |
|
69
|
|
Executive Engineer
|
RD - EIC-RW CE, RW CE
|
Promotion of J.E Civil to the rank of A.E
|
|
-- |
|
70
|
|
Executive Engineer
|
RD - Chief Engineer, Plan Roads, RW CE
|
Submission of DPR for work- N.A road to Ansalo for year2026-27.
|
|
-- |
|
71
|
|
Executive Engineer
|
RD - Chief Engineer, Plan Roads, RW CE
|
Requirement of funds for work.
|
|
-- |
|
72
|
|
Executive Engineer
|
RD - Chief Engineer, Plan Roads, RW CE
|
Requirement of funds for work- construction of udayapur Banti to Kakatpur Konark PWD road via- Swain Sahi
|
|
-- |
|
73
|
|
RW SE KEONJHAR
|
RD - EIC-RW CE, RW CE
|
Office Order No. 3410
|
|
-- |
|
74
|
|
RW SE KEONJHAR
|
RD - EIC-RW CE, RW CE
|
Transfer of RTI Application of Sri Rajkumar Yadav on dated 09.06.2026.
|
|
-- |
|
75
|
|
RW SE KEONJHAR
|
RD - EIC-RW CE, RW CE
|
Transfer of RTI Application of Sri Simanchala Mishra on dated 10.06.2026.
|
|
-- |
|
76
|
|
RW SE CUTTACK
|
RD - EIC-RW CE, RW CE
|
RTI application on dt.15.06.2026 of Sankarsan Baghar
|
|
-- |
|
77
|
|
RW SE CUTTACK
|
RD - EIC-RW CE, RW CE
|
RTI application on dt.05.06.2026 of Adarsh Agarwal
|
|
-- |
|
78
|
|
RW SE CUTTACK
|
RD - Chief Engineer, PMGSY, RW CE
|
1st corrigendum Tender Online RWC 10/26
|
|
-- |
|
79
|
|
RW SE CUTTACK
|
RD - Chief Engineer, Plan Roads, RW CE
|
1st corrigendum Tender Online RWC 10/26
|
|
-- |
|
80
|
|
RW SE CUTTACK
|
RD - EIC-RW CE, RW CE
|
1st corrigendum Tender Online RWC 10/26
|
|
-- |
|
81
|
|
RW SE CUTTACK
|
RD - Chief Engineer, Buildings, RW CE
|
1st corrigendum Tender Online RWC 10/26
|
|
-- |
|
82
|
|
RW SE CUTTACK
|
RD - Chief Engineer, Plan Roads, RW CE
|
Submission of EOT application for the work Costn of RD Road to Alara to Nandaksihorepur
|
|
-- |
|
83
|
|
RW SE CUTTACK
|
RD - Chief Engineer, Buildings, RW CE
|
Approval of EOT application for the work Costn of Day Care Sub center BLG at Binishpur
|
|
-- |
|
84
|
|
RW SE CUTTACK
|
RD - Chief Engineer, Plan Roads, RW CE
|
Acceptance of tender for the work Costn of road from Kamalpur to Naranpur
|
|
-- |
|
85
|
|
Executive Engineer
|
Chief Engineer, Building and Bridge, RW CE
|
Resubmission of 02 Nos DPR copy of bridge projects under SBY 2025-26 after compliance
|
|
-- |
|
86
|
|
Executive Engineer
|
RD - EIC-RW CE, RW CE
|
Resubmission of 02 Nos DPR copy of bridge projects under SBY 2025-26 after compliance
|
|
-- |
|
87
|
|
Executive Engineer
|
Chief Engineer, Building and Bridge, RW CE
|
Submission of Interim devistion and revised estimate for the work.
|
|
-- |
|
88
|
|
Executive Engineer
|
RD - Chief Engineer, Buildings, RW CE
|
Submission of Interim devistion and revised estimate for the work.
|
|
-- |
|
89
|
|
Executive Engineer
|
RD - Chief Engineer, Plan Roads, RW CE
|
Resubmission of Road proposal of Patna Assembly Constituency related to mining area along with feasibility report of roads as recommended by Honorable MLA Patna to be developed under OMBADC Scheme.
|
|
-- |
|
90
|
|
RW SE BALESWAR
|
Chief Engineer, Building and Bridge, RW CE
|
Submission of Revised estimate along with deviaiton statement for the work Construction of H.L. Bridge over Sono at 1200 Km. on Matiali to Baincha road under BSY in the District of Balasore for 2022-23.
|
|
-- |
|
91
|
|
RW SE BALESWAR
|
Chief Engineer, Building and Bridge, RW CE
|
Submission of Revised estimate along with deviaiton statement for the work Construction of H.L. Bridge over river Coast canal from Kamargaon Balimed PWD road to Near Laxmidaspur Chhak in the District of Bhadrak for 2023-24.
|
|
-- |
|
92
|
|
RW SE BALESWAR
|
RD - EIC-RW CE, RW CE
|
Allotment of seats for Accounts training of Ministerial Staff during the Month of August 2026-27
|
|
-- |
|
93
|
|
RW SE BALESWAR
|
RD - Chief Engineer, Plan Roads, RW CE
|
Office Order
|
|
-- |
|
94
|
|
RW SE BALESWAR
|
Chief Engineer, Building and Bridge, RW CE
|
Approval of Schedule of adjustment data for the work Construction of Bridge over Patharkata Nallah at Ch. 0.800 from PS road on Brahmachari to Kalia Kurunta to PS road under BSY for 2021-22
|
|
-- |
|
95
|
|
RW SE BALESWAR
|
Chief Engineer, Building and Bridge, RW CE
|
Submission of tender documents for the work Construction of H.L. Bridge over river Reba on HLC-III on Bhandaripokhari to Bhadrak road in the District of Bhadrak under SBY for 2025-26
|
|
-- |
|
96
|
|
Executive Engineer
|
RD - Chief Engineer, Buildings, RW CE
|
Submission of Utilisation Certificate under deposit work.
|
|
-- |
|
97
|
|
Executive Engineer
|
RD - EIC-RW CE, RW CE
|
CONTC No.705 of 2026 filed by Sri Bhikari Charan Mohanty
|
|
-- |
|
98
|
|
Executive Engineer
|
RD - EIC-RW CE, RW CE
|
Office Order of Sri Bhikari Charan Mohanty,Ex-Electrician
|
|
-- |
|
99
|
|
Executive Engineer
|
RD - EIC-RW CE, RW CE
|
Regarding drawal of agreement for Hiring Vehicle on monthly basis for the Official use of the Astt Executive Engineer Elect Rural Works Elect Sub- Division,Khurdha,BBSR.
|
|
-- |
|
100
|
|
RD - SE, Banspal
|
RD - EIC-RW CE, RW CE
|
Office Order.
|
|
-- |
|
101
|
|
RD - SE, Banspal
|
RD - EIC-RW CE, RW CE
|
Intimation regarding Joining of Er. Muniram Marndi, Junior Engineer.
|
|
-- |
|
102
|
|
Executive Engineer,R.W.D-II, Nayagarh
|
RD - EIC-RW CE, RW CE
|
Representation of Sri Prakash Chandra Pradhan, Peon of R.W. Division-II, Nayagarh for transfer of self
|
|
-- |
|
103
|
|
RW SE Angul
|
RD - Chief Engineer, Plan Roads, RW CE
|
Submission of tender documents for the work Constn of road from RD road to Sankarada Via- Nuapada Chhelikhal Bisipali road in the District of Boudh under MMSY TRIP for the year 2025-26
|
|
-- |
|
104
|
|
RW SE Angul
|
RD - Chief Engineer, Plan Roads, RW CE
|
Submission of tender documents for the work Constn of road from Kanpa to Batepanga under MMSY CUVDA for the year 2024-25
|
|
-- |
|
105
|
|
RW SE Angul
|
RD - Chief Engineer, Plan Roads, RW CE
|
Submission of tender documents for the work Constn of road from RD road to Sankarada Via- Nuapada Chhelikhal Bisipali road in the District of Boudh under MMSY TRIP for the year 2025-26
|
|
-- |
|
106
|
|
RW SE Angul
|
Chief Engineer, Building and Bridge, RW CE
|
Resubmission of EOT for the work Constn of HL Bridge over Darjani Nallah at Dhalapada of Bhuban Block in the District of Dhenkanal for the year 2023-24
|
|
-- |
|
107
|
|
RW SE Angul
|
RD-SE Quality control, RW CE
|
Slbmission of Hydraulic particulars for the work ..Construction of H.L.Bridge over Local Nallah at 1/32KM on PWD road to Kanisimiti Via-Via-Dumatpokhal Scheme MMSY-Gramadoya for the year 2026_27,,.
|
|
-- |
|
108
|
|
RW SE Angul
|
RD - Chief Engineer, Plan Roads, RW CE
|
Submission of DPR Projects approver under MMSY-Impvt to existing RD road in the District of Boudh for the year 2026-27 accordance of A./A
|
|
-- |
|
109
|
|
Executive Engineer
|
RD - Chief Engineer, PMGSY, RW CE
|
Requisition of Bank Authorisation for release of Security Deposit and Performance Security Deposit of PMGSY works
|
|
-- |
|
110
|
|
Executive Engineer
|
RD - EIC-RW CE, RW CE
|
Requisition of Bank Authorisation for release of Security Deposit and Performance Security Deposit of PMGSY works
|
|
-- |
|
111
|
|
RW SE BHABANIPATNA
|
RD - EIC-RW CE, RW CE
|
Service verification certificate of Sri Arjuna Behera, CCE, RW Circle, Bhawanipatna
|
|
-- |