1
|
|
Executive Engineer
|
RD - Empowered Officer OSRRA, RW CE
|
Permission for digital payment for PMGSY works.
|
|
-- |
|
2
|
|
Executive Engineer
|
RD - EIC-RW CE, RW CE
|
Activate the district access in e-MARG of Avijit Barik, SE instead of Nirmal Chandra Jena, SE.
|
|
-- |
|
3
|
|
Executive Engineer
|
RD - Chief Engineer, PMGSY, RW CE
|
Activate the district access in e-MARG of Avijit Barik, SE instead of Nirmal Chandra Jena, SE.
|
|
-- |
|
4
|
|
Executive Engineer
|
RD - Chief Engineer, Plan Roads, RW CE
|
Requirement of funds in IOTMS/WAMIS for Payment of pending bills Under H/A 28-5054-04-337-2161-37342-073
|
|
-- |
|
5
|
|
Executive Engineer
|
RD - EIC-RW CE, RW CE
|
Submission of retirement pension gratuity and verification of earned leave account in respect of Sri Kartik Charan Pradhan, EE Civil (Retd.)
|
|
-- |
|
6
|
|
Executive Engineer
|
RD - EIC-RW CE, RW CE
|
Submission of revised Hydraulic Particular for the work Construction of HL Bridge over river Mahanadi at 0.50 Km on SH-12 (Bhandua) to Saharadia PS road in the District of Jagatsinghpur under SBY for the year 2022-23.
|
|
-- |
|
7
|
|
Executive Engineer
|
Chief Engineer, Building and Bridge, RW CE
|
Submission of revised Hydraulic Particular for the work Construction of HL Bridge over river Mahanadi at 0.50 Km on SH-12 (Bhandua) to Saharadia PS road in the District of Jagatsinghpur under SBY for the year 2022-23.
|
|
-- |
|
8
|
|
Executive Engineer
|
RD - EIC-RW CE, RW CE
|
Publication of e-Procurement Notie Tender Online No. 07 of 2026-27 of Rural Works Division, Jagatsinghur for road works.
|
|
-- |
|
9
|
|
Executive Engineer
|
Chief Engineer, Building and Bridge, RW CE
|
Regarding completion of civil work at Temporary accommodation of court Building at Naugason now functioning at R.W Rest, Naugaon.
|
|
-- |
|
10
|
|
Executive Engineer
|
RD - EIC-RW CE, RW CE
|
Regarding completion of civil work at Temporary accommodation of court Building at Naugason now functioning at R.W Rest, Naugaon.
|
|
-- |
|
11
|
|
Executive Engineer
|
RD - EIC-RW CE, RW CE
|
Office Order.
|
|
-- |
|
12
|
|
Executive Engineer
|
Chief Engineer, Building and Bridge, RW CE
|
Office Order.
|
|
-- |
|
13
|
|
Executive Engineer
|
Chief Engineer, Building and Bridge, RW CE
|
Office Order.
|
|
-- |
|
14
|
|
Executive Engineer
|
RD - EIC-RW CE, RW CE
|
Office Order.
|
|
-- |
|
15
|
|
Executive Engineer
|
Chief Engineer, Building and Bridge, RW CE
|
Office Order.
|
|
-- |
|
16
|
|
Executive Engineer
|
RD - EIC-RW CE, RW CE
|
Office Order.
|
|
-- |
|
17
|
|
Executive Engineer
|
RD - EIC-RW CE, RW CE
|
Release of funds for payment of legal expenses relating to Exe-Case 703/2022 of Civil Judge commerical court Cuttack.
|
|
-- |
|
18
|
|
Executive Engineer
|
RD - EIC-RW CE, RW CE
|
Release of funds for payment of legal expenses relating to Exe-Case 703/2022 of Civil Judge commerical court Cuttack.
|
|
-- |
|
19
|
|
Executive Engineer
|
Chief Engineer, Building and Bridge, RW CE
|
Release of funds for payment of legal expenses relating to Exe-Case 703/2022 of Civil Judge commerical court Cuttack.
|
|
-- |
|
20
|
|
Executive Engineer
|
RD - Chief Engineer, Plan Roads, RW CE
|
Submission of Counter Affidavit against WP(C) No. 22909/2026 field by Sri Kailash Chandra Behera Vrs State of Odisha and others.
|
|
-- |
|
21
|
|
Executive Engineer
|
RD - EIC-RW CE, RW CE
|
Submission of Counter Affidavit against WP(C) No. 22909/2026 field by Sri Kailash Chandra Behera Vrs State of Odisha and others.
|
|
-- |
|
22
|
|
Executive Engineer
|
RD - EIC-RW CE, RW CE
|
Training on Full Depth Reclamation (FDR) is scheduled to be held on dtd. 03.112026 for Departemental Engineers on Hybrid (Both Online and Offline) followed by field visit on Dtd. 04.11.2026.
|
|
-- |
|
23
|
|
Executive Engineer
|
Chief Engineer, Building and Bridge, RW CE
|
Utilisation certificate for the work Infrastructure development of Balikuda College Building, Balikudas Block, Jagatsinghur under world Bank assistasnt programme OHPEE Phase-II in the District of Jagatsinghpur.
|
|
-- |
|
24
|
|
Executive Engineer
|
RD - EIC-RW CE, RW CE
|
Utilisation certificate for the work Infrastructure development of Balikuda College Building, Balikudas Block, Jagatsinghur under world Bank assistasnt programme OHPEE Phase-II in the District of Jagatsinghpur.
|
|
-- |
|
25
|
|
Executive Engineer
|
Chief Engineer, Building and Bridge, RW CE
|
Provide budget provision for the work Construction of Hazi Seikh Samiruddin Govt. Higher secondaryd school at krishnandapur under Tirtol Block for the year 2025-26 in the District of Jagatsinghpur.
|
|
-- |
|
26
|
|
Executive Engineer
|
RD - EIC-RW CE, RW CE
|
Provide budget provision for the work Construction of Hazi Seikh Samiruddin Govt. Higher secondaryd school at krishnandapur under Tirtol Block for the year 2025-26 in the District of Jagatsinghpur.
|
|
-- |
|
27
|
|
Executive Engineer
|
Chief Engineer, Building and Bridge, RW CE
|
Office Order.
|
|
-- |
|
28
|
|
Executive Engineer
|
RD - EIC-RW CE, RW CE
|
Office Order.
|
|
-- |
|
29
|
|
Executive Engineer
|
Chief Engineer, Building and Bridge, RW CE
|
Format for Requisition of funds for on-going works under prograsmme expenditure for the year 2026-27 Revised.
|
|
-- |
|
30
|
|
Executive Engineer
|
RD - EIC-RW CE, RW CE
|
Format for Requisition of funds for on-going works under prograsmme expenditure for the year 2026-27 Revised.
|
|
-- |
|
31
|
|
Executive Engineer
|
RD - EIC-RW CE, RW CE
|
Submission of Utilisation certificate of three Nos. Judicial Departement Building at kujanga in the District of Jagatsinghpur.
|
|
-- |
|
32
|
|
Executive Engineer
|
Chief Engineer, Building and Bridge, RW CE
|
Submission of Utilisation certificate of three Nos. Judicial Departement Building at kujanga in the District of Jagatsinghpur.
|
|
-- |
|
33
|
|
Executive Engineer
|
RD - Chief Engineer, Plan Roads, RW CE
|
Submission of Detailed Project Reports of road projects under the scheme MMSY-TRIP road for the year 2026-27.
|
|
-- |
|
34
|
|
Executive Engineer
|
RD - Chief Engineer-I, RW CE
|
Submission of Addl. Annual Maintenance Plan (AMP) of New Proposal of road works underrnAdministrative Expenditure (Non-Plan) for the financial year 2026-27.
|
|
-- |
|
35
|
|
Executive Engineer
|
RD - Chief Engineer, PMGSY, RW CE
|
Request for replacement of the Maintenance fund due to inafvertent booking of expenditure under the maintenance instead of the Administrative fund
|
|
-- |
|
36
|
|
Executive Engineer
|
RD - EIC-RW CE, RW CE
|
Request for replacement of the Maintenance fund due to inafvertent booking of expenditure under the maintenance instead of the Administrative fund
|
|
-- |
|
37
|
|
Executive Engineer
|
RD - Empowered Officer OSRRA, RW CE
|
Requisition of Bank Authorization for release of SD performance security Deposit of PMGSY works
|
|
-- |
|
38
|
|
Executive Engineer
|
RD - EIC-RW CE, RW CE
|
Requisition of Bank Authorization for release of SD performance security Deposit of PMGSY works
|
|
-- |
|
39
|
|
Executive Engineer
|
RD - Chief Engineer, PMGSY, RW CE
|
Requisition of Bank Authorization for release of SD performance security Deposit of PMGSY works
|
|
-- |
|
40
|
|
EE JHARSUGUDA
|
RD - Executive Engineer Establishment, RW CE
|
Requirement of allotment for payment of the Samaja Oriya Newspaper
|
|
-- |
|
41
|
|
EE JHARSUGUDA
|
RD - EIC-RW CE, RW CE
|
Requirement of allotment for payment of the Samaja Oriya Newspaper
|
|
-- |
|
42
|
|
Executive Engineer
|
RD - Chief Engineer, Plan Roads, RW CE
|
Submission for Budget provision regarding A/A Transfer.
|
|
-- |
|
43
|
|
Executive Engineer
|
RD-SE Quality control, RW CE
|
submission of Final Action Taken Report (ATR) of (pkg. no-326) sQM on inspection of sQM.
|
|
-- |
|
44
|
|
Executive Engineer
|
RD - EIC-RW CE, RW CE
|
submission of Final Action Taken Report (ATR) of (pkg. no-326) sQM on inspection of sQM.
|
|
-- |
|
45
|
|
Executive Engineer
|
RD - Chief Engineer, PMGSY, RW CE
|
submission of Final Action Taken Report (ATR) of (pkg. no-326) sQM on inspection of sQM.
|
|
-- |
|
46
|
|
Executive Engineer
|
Chief Engineer, Building and Bridge, RW CE
|
Submisslon of requisition of funds for payment of bills. lmvt to PWD Road to Matikapur road under MMSY- lmvt to Existing RD Road
|
|
-- |
|
47
|
|
Executive Engineer
|
RD - EIC-RW CE, RW CE
|
Submisslon of requisition of funds for payment of bills. lmvt to PWD Road to Matikapur road under MMSY- lmvt to Existing RD Road
|
|
-- |
|
48
|
|
Executive Engineer
|
RD - Chief Engineer-I, RW CE
|
Submission of Addl. Annual Maintenance plan for Rural roads for 2026-27
|
|
-- |
|
49
|
|
Executive Engineer
|
RD - Chief Engineer-I, RW CE
|
Requirement of funds
|
|
-- |
|
50
|
|
Executive Engineer
|
RD - Chief Engineer, Plan Roads, RW CE
|
Requirement of funds
|
|
-- |
|
51
|
|
Executive Engineer
|
RD - Chief Engineer-I, RW CE
|
submission of estimate of 2 nos work towards emergency road repair
|
|
-- |
|
52
|
|
Executive Engineer
|
RD - Chief Engineer, Plan Roads, RW CE
|
Requirement of funds
|
|
-- |
|
53
|
|
Executive Engineer
|
RD - Chief Engineer-I, RW CE
|
Requirement of funds
|
|
-- |
|
54
|
|
Executive Engineer
|
RD - Chief Engineer, Buildings, RW CE
|
Requirement of funds
|
|
-- |
|
55
|
|
Executive Engineer
|
RD - Chief Engineer-I, RW CE
|
Requirement of funds
|
|
-- |
|
56
|
|
Executive Engineer
|
Chief Engineer, Building and Bridge, RW CE
|
Requirement of funds
|
|
-- |
|
57
|
|
Executive Engineer
|
RD - Chief Engineer-I, RW CE
|
Requirement of funds
|
|
-- |
|
58
|
|
Executive Engineer
|
RD - Chief Engineer, Plan Roads, RW CE
|
Requirement of funds
|
|
-- |
|
59
|
|
Executive Engineer
|
RD - Chief Engineer, Plan Roads, RW CE
|
Requirement of funds
|
|
-- |
|
60
|
|
Executive Engineer
|
RD - Chief Engineer-I, RW CE
|
Requirement of funds
|
|
-- |
|
61
|
|
Executive Engineer
|
RD - Chief Engineer-I, RW CE
|
Capacity building of master trainers
|
|
-- |
|
62
|
|
RW SE KEONJHAR
|
RD - Chief Engineer, Plan Roads, RW CE
|
Submission of E.O.T application for the work :- Improvement of road from Durgasahi to Alutuma road from 0/00 Km. to 4/010 Km. under DMF for the year 2025-26 in the District of Kendujhar.
|
|
-- |
|
63
|
|
RW SE KEONJHAR
|
RD - Chief Engineer, Plan Roads, RW CE
|
Acceptance of the tender for the work :- “Construction of road from Kushunpur School Chhak to Phulpahadi Golabandha road under MMSY-TRIP in the district of Kendujhar for the year 2025-26.
|
|
-- |
|
64
|
|
RW SE KEONJHAR
|
RD - Chief Engineer, Plan Roads, RW CE
|
Tender documents for the work :- Construction Road from Khadikapada to Gojapathar via-Gohira under MMSY-TRIP in the district of Kendujhar for the year 2025-26.
|
|
-- |
|
65
|
|
RW SE KEONJHAR
|
RD - Chief Engineer, PMGSY, RW CE
|
Reminder for submission of estimates for invitation of tender under Periodical Renewal work of 5yr completed PMGSY (Post DLP) roads for the year 2026-27 under state Budget Grant in the district of Kendujhar.
|
|
-- |
|
66
|
|
Executive Engineer
|
RD - Chief Engineer, Plan Roads, RW CE
|
Requirement of funds for work- Construction of Singharapal Cyclone Shelter to Tandahara via- Udayakani.
|
|
-- |
|
67
|
|
Executive Engineer
|
RD - Chief Engineer, Plan Roads, RW CE
|
Requirement of funds for work- Construction of Udayapur Banti R.D road culvert to Kakatpur-Konark PWD road Via- Swain Sahi.
|
|
-- |
|
68
|
|
RW SE CUTTACK
|
RD - Chief Engineer, Plan Roads, RW CE
|
Show cause notice regarding identical quoted percentage for multiple road works situated at different geographical location
|
|
-- |
|
69
|
|
RW SE CUTTACK
|
RD - Chief Engineer, Plan Roads, RW CE
|
Show cause notice regarding identical quoted percentage for multiple road works situated at different geographical location
|
|
-- |
|
70
|
|
RW SE CUTTACK
|
RD - Chief Engineer, Plan Roads, RW CE
|
Show cause notice regarding identical quoted percentage for multiple road works situated at different geographical location
|
|
-- |
|
71
|
|
RW SE CUTTACK
|
RD - Chief Engineer, Plan Roads, RW CE
|
Show cause notice regarding identical quoted percentage for multiple road works situated at different geographical location
|
|
-- |
|
72
|
|
RW SE CUTTACK
|
RD - Chief Engineer, Plan Roads, RW CE
|
Show cause notice regarding identical quoted percentage for multiple road works situated at different geographical location
|
|
-- |
|
73
|
|
RW SE CUTTACK
|
RD - Chief Engineer, Buildings, RW CE
|
Submission of EOT application for the work Costn of new MPH
|
|
-- |
|
74
|
|
RW SE CUTTACK
|
RD - Chief Engineer, PMGSY, RW CE
|
Submission of revised estimate and deviation statement for the work Impt to Road andCD work PMGSY pkg no.OR-07-336
|
|
-- |
|
75
|
|
RW SE CUTTACK
|
RD - Chief Engineer, Plan Roads, RW CE
|
Submission DPR of road projects approved under the scheme
|
|
-- |
|
76
|
|
RW SE CUTTACK
|
RD - Chief Engineer, Buildings, RW CE
|
Submission of revised estimate and Deviation statement for the work Costn of E Type qtr GHD Dahigaon
|
|
-- |
|
77
|
|
RW SE CUTTACK
|
RD - Chief Engineer, Plan Roads, RW CE
|
Administrative approval
|
|
-- |
|
78
|
|
RW SE CUTTACK
|
SE Design, RW CE
|
Submission of hydraulic particular for the work Costn of HL Bridge over Rana
|
|
-- |
|
79
|
|
RW SE CUTTACK
|
RD-SE Quality control, RW CE
|
Submission of hydraulic particular for the work Costn of HL Bridge over Rana
|
|
-- |
|
80
|
|
RW SE CUTTACK
|
RD - Chief Engineer, Plan Roads, RW CE
|
Submission of approved parawise comments of WPC no.20849
|
|
-- |
|
81
|
|
Executive Engineer
|
RD - EIC-RW CE, RW CE
|
Submission of requisition for allocation authorization of fund in respect of Health Department projects taken up pertaining to R.W.Division, Mohana in shape of challan deposit for remittance towards for placement of authorization of funds.
|
|
-- |
|
82
|
|
Executive Engineer
|
Chief Engineer, Building and Bridge, RW CE
|
Submission of requisition for allocation authorization of fund in respect of Health Department projects taken up pertaining to R.W.Division, Mohana in shape of challan deposit for remittance towards for placement of authorization of funds.
|
|
-- |
|
83
|
|
Executive Engineer
|
RD - EIC-RW CE, RW CE
|
Intimation regarding pending Audit para against Sri Kishore Kumar Pani, Ex-Assistant Engineer of this division.
|
|
-- |
|
84
|
|
Executive Engineer
|
RD - Chief Engineer, Plan Roads, RW CE
|
Show Cause Notice for delay in performance of Construction of Kamarsahi Chhak to Baunsabani R.D. road Via- Ghuthuna Chhak under MMSY TRIP road vide Agreement No. 177 P1 of 2023-24.
|
|
-- |
|
85
|
|
Executive Engineer
|
RD - Chief Engineer, Plan Roads, RW CE
|
Requirement of fund for MMSY-TRIP Road.
|
|
-- |
|
86
|
|
Executive Engineer
|
RD - Chief Engineer, Plan Roads, RW CE
|
Requirement of fund for MMSY-CMRL Road.
|
|
-- |
|
87
|
|
Executive Engineer
|
Chief Engineer, Building and Bridge, RW CE
|
Execution case No. 02 of 2020 and 03/2020 filed by Coroganon India Pvt. Ltd.
|
|
-- |
|
88
|
|
Executive Engineer
|
Chief Engineer, Building and Bridge, RW CE
|
Requirement of funds of Hand FW deptt.Non Residential Building for 2026-27
|
|
-- |
|
89
|
|
Executive Engineer
|
RD - EIC-RW CE, RW CE
|
Srnubmission of draft para wise comments on W.P (C) No. 34469 of 2026 filed by Sri Amarendra Sarangi and Others
|
|
-- |
|
90
|
|
Executive Engineer
|
RD - Chief Engineer, Plan Roads, RW CE
|
Regarding Verification for Shifting of work Construction of Road from Suksanda Patna to Panisanda via Suksanda road in the Dist, of Baleshwar
|
|
-- |
|
91
|
|
Executive Engineer
|
RD - EIC-RW CE, RW CE
|
Submission of Properly justified Extension of Time EOT application for overdue works WAMIS compliance
|
|
-- |
|
92
|
|
Executive Engineer
|
RD - EIC-RW CE, RW CE
|
Submission of Properly justified Extension of Time EOT application for overdue works WAMIS compliance
|
|
-- |
|
93
|
|
Executive Engineer
|
RD - EIC-RW CE, RW CE
|
Submission of Properly justified Extension of Time EOT application for overdue works WAMIS compliance
|
|
-- |
|
94
|
|
Executive Engineer
|
RD - EIC-RW CE, RW CE
|
Submission of Properly justified Extension of Time EOT application for overdue works WAMIS compliance
|
|
-- |
|
95
|
|
Executive Engineer
|
RD - EIC-RW CE, RW CE
|
Submission of Properly justified Extension of Time EOT application for overdue works WAMIS compliance
|
|
-- |
|
96
|
|
Executive Engineer
|
RD - EIC-RW CE, RW CE
|
Submission of Properly justified Extension of Time EOT application for overdue works WAMIS compliance
|
|
-- |
|
97
|
|
Executive Engineer
|
RD - EIC-RW CE, RW CE
|
Submission of verified Projects completion certificates PPCs final bills and work-wise WAMIS compliance report-regardng
|
|
-- |
|
98
|
|
Executive Engineer
|
RD - EIC-RW CE, RW CE
|
Submission of verified Projects completion certificates PPCs final bills and work-wise WAMIS compliance report-regardng
|
|
-- |
|
99
|
|
Executive Engineer,R.W.D-II, Nayagarh
|
RD - EIC-RW CE, RW CE
|
Requisition format for maintenance of completed MMSY works
|
|
-- |
|
100
|
|
Executive Engineer,R.W.D-II, Nayagarh
|
RD - Chief Engineer, Plan Roads, RW CE
|
Requisition format for maintenance of completed MMSY works
|
|
-- |
|
101
|
|
Executive Engineer,R.W.D-II, Nayagarh
|
Chief Engineer, Building and Bridge, RW CE
|
Submission of requisition of Health Department Projects of State Plan under Head of Account D. No- 12-4216-01-106-3261-18078-072-21-1-1
|
|
-- |
|
102
|
|
Executive Engineer,R.W.D-II, Nayagarh
|
RD - Chief Engineer, Buildings, RW CE
|
Submission of requisition of Health Department Projects of State Plan under Head of Account D. No- 12-4216-01-106-3261-18078-072-21-1-1
|
|
-- |
|
103
|
|
Executive Engineer,R.W.D-II, Nayagarh
|
RD - EIC-RW CE, RW CE
|
Submission of requisition of Health Department Projects of State Plan under Head of Account D. No- 12-4216-01-106-3261-18078-072-21-1-1
|
|
-- |
|
104
|
|
Executive Engineer
|
RD - EIC-RW CE, RW CE
|
Submission of verified Projects completion certificates PPCs final bills and work-wise WAMIS compliance report-regardng
|
|
-- |
|
105
|
|
Executive Engineer
|
RD - Chief Engineer, Buildings, RW CE
|
Submission of UC of Star Building
|
|
-- |
|
106
|
|
Executive Engineer
|
RD - Chief Engineer, PMGSY, RW CE
|
Permission for Revised Budget Allocation for execution of periodical Renewal work of 5 year Completed PMGSY (Post DLP) Road for financial year under State Budget Grant
|
|
-- |
|
107
|
|
Executive Engineer
|
Chief Engineer, Building and Bridge, RW CE
|
Progress of the work Construction of H.L Bridge over Kolab river near Gupteswar temple at Ch 1st km on Siribeda to CG Boundary under Boipariguda Block in the dist of Koraput
|
|
-- |
|
108
|
|
Executive Engineer
|
Chief Engineer, Building and Bridge, RW CE
|
Progress of the work Construction of H.L Bridge over river Saberi on Podapadar to Tentuligumma road in the dist of Koraput
|
|
-- |
|
109
|
|
Executive Engineer
|
RD - EIC-RW CE, RW CE
|
Submission of Reply to Preliminary Audit Observation Complaince Para
|
|
-- |
|
110
|
|
RW SE Angul
|
RD - Chief Engineer, Plan Roads, RW CE
|
Tender Call Notice BID ID NO-Bridge Online AGL-27/2026-27
|
|
-- |
|
111
|
|
RW SE Angul
|
Chief Engineer, Building and Bridge, RW CE
|
Tender Call Notice BID ID NO-Bridge Online AGL-27/2026-27
|
|
-- |
|
112
|
|
RW SE Angul
|
RD - EIC-RW CE, RW CE
|
Tender Call Notice BID ID NO-Bridge Online AGL-27/2026-27
|
|
-- |
|
113
|
|
RW SE Angul
|
Chief Engineer, Building and Bridge, RW CE
|
Submission of 2nd interim deviation statement for the work Constn of HL Bridge over Badajore Nallah on Bhulpur Sankarpur road under BSY in the District of Dhenkanal for the year 2023-24
|
|
-- |
|
114
|
|
RW SE Angul
|
Chief Engineer, Building and Bridge, RW CE
|
Submission of EOT for the work Constn of Day Care PHC Buyilding at Kantiokateni for the year 2023-24
|
|
-- |
|
115
|
|
RW SE Angul
|
RD - EIC-RW CE, RW CE
|
Submission of application under Rehabilitation Assistance Scheme of Sri Gourisankar Sahoo S/o Late Sahadeba Sahoo Jeep Driver (Work charged) of Rural Works Division Dhenkanal
|
|
-- |
|
116
|
|
RW SE Angul
|
RD - EIC-RW CE, RW CE
|
Office Order
|
|
-- |
|
117
|
|
RW SE Angul
|
RD - EIC-RW CE, RW CE
|
Flood-Cum-Cyclone Control Cell
|
|
-- |
|
118
|
|
Executive Engineer
|
RD - EIC-RW CE, RW CE
|
Submission of order dtd.19.01.2024 passed by the Honble High Court (0), Cuttack on W.P. (C ) No.36146 of 2023 and I.A No-17490 of 2023 field by the Superintending Engineer, Rural Works Division, BBSR, -vrs- Assistant Provident Fund Commissioner (COMP), EPFO,Bhubaneswar
|
|
-- |
|
119
|
|
Executive Engineer
|
Chief Engineer, Building and Bridge, RW CE
|
Plugging proposal for AL and AR for the work Construction of Bridge over river Dhanua at KrushnapurrnCh.7.230 km on Chanahat -Raja road in the dist of khordha.
|
|
-- |
|
120
|
|
Executive Engineer
|
RD - EIC-RW CE, RW CE
|
Plugging proposal for AL and AR for the work Construction of Bridge over river Dhanua at KrushnapurrnCh.7.230 km on Chanahat -Raja road in the dist of khordha.
|
|
-- |
|
121
|
|
Executive Engineer
|
RD - EIC-RW CE, RW CE
|
Permission for laying Optical fibre Cable by HDD method from Kushupall PMGSY road to Simore Main road for a length of 1.60 Km
|
|
-- |
|
122
|
|
Executive Engineer
|
RD - EIC-RW CE, RW CE
|
Transfer of funds towards registration fees for nomination of Official on behalh of RuralrnDevelopment, Govt.of Odisha to attend the 85th Annual Session of Indian Road Congressrnscheduled to be held from 19th to 22th November,2026 at the HITEX Exhibition Centre inrnHydr
|
|
-- |
|
123
|
|
Executive Engineer
|
RD - Chief Engineer, Schemes, RW CE
|
Tender -Online -Divn. BBSR -19 / 2026-27.
|
|
-- |
|
124
|
|
Executive Engineer
|
RD - Chief Engineer, PMGSY, RW CE
|
Tender -Online -Divn. BBSR -19 / 2026-27.
|
|
-- |
|
125
|
|
Executive Engineer
|
RD - Chief Engineer, Plan Roads, RW CE
|
Tender -Online -Divn. BBSR -19 / 2026-27.
|
|
-- |
|
126
|
|
Executive Engineer
|
RD - Chief Engineer, Buildings, RW CE
|
Tender -Online -Divn. BBSR -19 / 2026-27.
|
|
-- |
|
127
|
|
Executive Engineer
|
RD - EIC-RW CE, RW CE
|
Tender -Online -Divn. BBSR -19 / 2026-27.
|
|
-- |
|
128
|
|
Executive Engineer
|
RD - EIC-RW CE, RW CE
|
Tender for the work : Construction of Godi to Kokasingh via Podapatna road underrnMMSY-Transferred Road Improvement Programme (MMSY-TRIP) in the District ofrnKhordha for the year 2025-26.
|
|
-- |
|
129
|
|
Executive Engineer
|
RD - EIC-RW CE, RW CE
|
Your R.T.I. Application Dtd.08.10.2026 of Sri Sujit Kumar Tripathy received by this office 28.10.2026
|
|
-- |
|
130
|
|
Executive Engineer
|
RD - EIC-RW CE, RW CE
|
Submission of reply as per Your R.T.I. Application
|
|
-- |
|
131
|
|
Executive Engineer
|
RD - EIC-RW CE, RW CE
|
Submission of reply as per Your R.T.I. Application
|
|
-- |
|
132
|
|
Executive Engineer
|
RD - EIC-RW CE, RW CE
|
Submission of reply as per Your R.T.I. Application.
|
|
-- |
|
133
|
|
Executive Engineer, R.W. Dvin.-I, Cuttack
|
RD - EIC-RW CE, RW CE
|
Regarding transfer of Sri Sadasiba Jena,Peon of Rural Works Division-I,Kataka tornRural Works Division-II,Nayagarh.
|
|
-- |
|
134
|
|
Executive Engineer, R.W. Dvin.-I, Cuttack
|
RD - EIC-RW CE, RW CE
|
Submission of DPR for the work 'Construction of Bridge over rver 'Sedua' connecting tornBalibaman pitha from 42 mouza on 8th Km. on Pratapnagari Atha ga road in the District ofrnKataka'.
|
|
-- |
|
135
|
|
Executive Engineer, R.W. Dvin.-I, Cuttack
|
Chief Engineer, Building and Bridge, RW CE
|
Submission of DPR for the work 'Construction of Bridge over rver 'Sedua' connecting tornBalibaman pitha from 42 mouza on 8th Km. on Pratapnagari Atha ga road in the District ofrnKataka'.
|
|
-- |
|
136
|
|
Executive Engineer, R.W. Dvin.-I, Cuttack
|
RD - EIC-RW CE, RW CE
|
Information regarding construction work for Private Organization taken previously by R.D.rnDepartment.
|
|
-- |
|
137
|
|
Executive Engineer, R.W. Dvin.-I, Cuttack
|
Chief Engineer, Building and Bridge, RW CE
|
Information regarding construction work for Private Organization taken previously by R.D.rnDepartment.
|
|
-- |
|
138
|
|
Executive Engineer, R.W. Dvin.-I, Cuttack
|
RD - EIC-RW CE, RW CE
|
Submission of following Estimates of 'MMSY-Imp. to Existing R.D Road' for the year 2026-27.
|
|
-- |
|
139
|
|
Executive Engineer, R.W. Dvin.-I, Cuttack
|
RD - Chief Engineer, Plan Roads, RW CE
|
Submission of following Estimates of 'MMSY-Imp. to Existing R.D Road' for the year 2026-27.
|
|
-- |
|
140
|
|
Executive Engineer
|
Chief Engineer, Building and Bridge, RW CE
|
Requirement of funds under D.No.28-5054-80-796-0186-22115-073
|
|
-- |
|
141
|
|
Executive Engineer
|
RD - Chief Engineer, PMGSY, RW CE
|
Requisition for Bank Authorisation for 5 years completed PMGSY Roads
|
|
-- |
|
142
|
|
Executive Engineer
|
Chief Engineer, Building and Bridge, RW CE
|
Requirement of funds for building works different department under programme expenditure for the year 2026-27 (Requirement for Health Department)
|
|
-- |
|
143
|
|
Executive Engineer
|
Chief Engineer, Building and Bridge, RW CE
|
Submission of Requisition of health department projects in shape of Challan Deposit form.
|
|
-- |
|
144
|
|
Executive Engineer
|
RD - Chief Engineer, PMGSY, RW CE
|
Requisition of funds for PMGSY-II, works.
|
|
-- |
|
145
|
|
Executive Engineer
|
Chief Engineer, Building and Bridge, RW CE
|
Submission of detail estimate for cost of both Residental and Non-Residential building for accordance A/A
|
|
-- |