Sl# Letter No. Sent By Sent To Letter Subject PDF Encl.
1
991 03 Nov 2023
1
Executive Engineer WORKS - CCE,NH CIRCLE, KEONJHAR(Supdt Engineer NH)
Submission of draft tender schedule-H for the work Strengthening of stretches from (35/480 to 71/120) except from 59/594 to 60/042 and 60/292 to 63/400 of NH-220 under Annual Plan 2023-24 pdf-file --
2
984 02 Nov 2023
1
Executive Engineer Mayurbhanj(Collector cum DM)
Submission of report Regarding Preservation of Heritage Building beautification of the Bisoi NH IB of MBJ Dist. pdf-file --
3
979 01 Nov 2023
2
Executive Engineer Director, Nanda Infra Constn. Pvt., Ltd, Bhubanesw(other)
Reschedule for Eviction in Mouza Nuagan pdf-file --
4
977 30 Oct 2023
1
Executive Engineer Rabindra Das A Class Contractor(other)
Providing CC paver Block to Road berm at stretches of NH-220 from 36/0 to 71/727 for 22-23 Show cause Notice to slow progress of the work pdf-file --