1
|
|
Chief Construction Engineer
|
|
Regarding plantation at Lower Suktel R.R Colonies and Damsite.
|
|
-- |
2
|
|
P.A. to Chief Construction Engineer
|
|
OFFICE ORDER
|
|
-- |
3
|
|
P.A. to Chief Construction Engineer
|
CCE, Lower Suktel, Bolangir(Chief Construction Engineer)
|
Information sought for under RTI Act, 2005 by Sri Deepak Rai reg.
|
|
-- |
4
|
|
P.A. to Chief Construction Engineer
|
EE, LS Dam Division(Chief Construction Engineer)
|
Transfer of the RTI application of Sri Sankarshan Baghar
|
|
-- |
5
|
|
Chief Construction Engineer
|
|
''e'' PROCUREMENT NOTICE, Constn. of cement concrete precast interlocking paver block.
|
|
-- |
6
|
|
Chief Construction Engineer
|
Director,Treasuries Inspection,Odisha(Treasury Office)
|
Re-submission of application for availing benefit of family pension upon in-service death.
|
|
-- |
7
|
|
P.A. to Chief Construction Engineer
|
EE, LS Dam Division(Chief Construction Engineer)
|
Advertisement bill of PRAMEYA
|
|
-- |
8
|
|
P.A. to Chief Construction Engineer
|
CRO, LS Q.C. Divn.(Chief Construction Engineer)
|
Regarding return of sanction estimate.
|
|
-- |
9
|
|
P.A. to Chief Construction Engineer
|
EE, LS Canal Divn. No.I Bolagir(Chief Construction Engineer)
|
Submission compliance against observation for GA of forced water lubrication system.
|
|
-- |
10
|
|
P.A. to Chief Construction Engineer
|
EE, LS Canal Divn. No.I Bolagir(Chief Construction Engineer)
|
Compliance against Observation for design and GAD of header pipe at pump house.
|
|
-- |
11
|
|
Chief Construction Engineer
|
Keonjhar(Collector cum DM)
|
Submission of Attestation form of Miss Rojalin Dehury, Peon.
|
|
-- |
12
|
|
P.A. to Chief Construction Engineer
|
|
Representation of villagers of MUDALSAR TAMIAN reg.
|
|
-- |
13
|
|
Chief Construction Engineer
|
|
On the event of 75th Republic day on 26th january 2024 reg.
|
|
-- |
14
|
|
P.A. to Chief Construction Engineer
|
EE, LS RR CB Division Bolangir(Chief Construction Engineer)
|
Grievance petition of Kailash Padhan others received from Collector Balangir, Regd. No-2024423688
|
|
-- |
15
|
|
Chief Construction Engineer
|
EE, LS Canal Divn. No.I Bolagir(Chief Construction Engineer)
|
Observation of design GAD of monifold for pump house at L.S. for left command.
|
|
-- |
16
|
|
Chief Construction Engineer
|
Union Bank of India, Acharya vihar(Banks)
|
Release of pledged T.D.R of Sri Radheshyam Tripathy.
|
|
-- |
17
|
|
Chief Construction Engineer
|
AGA and E(Account General Odisha)
|
Regarding Pension paper of
|
|
-- |
18
|
|
P.A. to Chief Construction Engineer
|
EE, LS RR CB Division Bolangir(Chief Construction Engineer)
|
Regarding return of approved estimate.
|
|
-- |
19
|
|
P.A. to Chief Construction Engineer
|
CHIEF ENGINEER ME(Engineer-in-Chief, WR)
|
Information undertaken in DoWR for MO SARAKAR.
|
|
-- |
20
|
|
Chief Construction Engineer
|
EE, LS RR CB Division Bolangir(Chief Construction Engineer)
|
Relieve Order of Sri Niranjan Bhoi, Regular wages
|
|
-- |
21
|
|
Chief Construction Engineer
|
EIC, Water Resources, Bhubaneswar(Engineer-in-Chief, WR)
|
Nomination of Delegates for exposure visits to Singapore and Dubai reg.
|
|
-- |
22
|
|
Chief Construction Engineer
|
CCE, Lower Suktel, Bolangir(Chief Construction Engineer)
|
Inspection of transformer at manufacturing yard of M/s VOLTECH Manufacturing company
|
|
-- |
23
|
|
Chief Construction Engineer
|
EE, LS Canal Divn. No.II Loisinga(Chief Construction Engineer)
|
Observation on the document 110V DC Battery and battery charger sizing calculation
|
|
-- |
24
|
|
Chief Construction Engineer
|
CCE, Lower Suktel, Bolangir(Chief Construction Engineer)
|
Revised design and drawing of pump house pump floor above super structure of LSIP.
|
|
-- |
25
|
|
P.A. to Chief Construction Engineer
|
EE, Lower Suktel Canal Divin No-II Loisingha
EE, LS Canal Divn. No.I Bolagir(Chief Construction Engineer)
|
Redressal of grievance petition of Sri Dwija Dalpati reg.
|
|
-- |
26
|
|
P.A. to Chief Construction Engineer
|
CCE, Lower Suktel, Bolangir(Chief Construction Engineer)
|
Inspection of HDPE pipes at manufacturing yard
|
|
-- |
27
|
|
P.A. to Chief Construction Engineer
|
EE, LS RR CB Division Bolangir(Chief Construction Engineer)
|
Regarding return of approved estimate.
|
|
-- |
28
|
|
P.A. to Chief Construction Engineer
|
CCE, Lower Suktel, Bolangir(Chief Construction Engineer)
|
Submission of document for 6.6kv HT Switchgear panel for execution of pressurized UGPL for Right command reg.
|
|
-- |
29
|
|
P.A. to Chief Construction Engineer
|
CCE, Lower Suktel, Bolangir(Chief Construction Engineer)
|
Submission of QAP for 6.6KV Switchgear panel to be used for the work
|
|
-- |
30
|
|
P.A. to Chief Construction Engineer
|
EE, LS RR CB Division Bolangir(Chief Construction Engineer)
|
Grievance petition of Sri Prahalad Sahu of Kakhal, reg. survey of his house.
|
|
-- |