1
|
|
Supdt Engg. NH, Sambalpur
|
Works - Chief Engineer, National Highways(Chief Engineer)
|
Submission of 5th EOT application for the work Widening existing 2 lane to 2 lane carriageway with 1.5mtr paved shoulder from km 0/00 to 81/00 km and Km 93/00 to 119/00 km of NH- 157 in the state of Odisha on EPC mode
|
|
-- |
2
|
|
Supdt Engg. NH, Sambalpur
|
Works - Chief Engineer, National Highways(Chief Engineer)
|
Construction of Road Over Bridge No. 542 crossing the NH-57 near village Sarsara under Boudh District in connection with ( Khordha - Bolangir ) New BG Rail Link Project - Submission of Joint Inspection Report regarding
|
|
-- |
3
|
|
Supdt Engg. NH, Sambalpur
|
Works - EE NH Rourkela(Executive Engineer NH)
|
Absentee Statement of Smt Jyotsnamayee Biswal J.E. Initial appointee
|
|
-- |
4
|
|
Supdt Engg. NH, Sambalpur
|
Works - Chief Engineer, National Highways(Chief Engineer)
|
Construction of four lane ROB with approaches in lieu of existing Level Crossing No.RV-172 at Km 176 on NH.201 (Present NH.26) at Kesinga including land acquisition in the State of Odisha on EPC Mode : Regarding release of Bid Security
|
|
-- |
5
|
|
Supdt Engg. NH, Sambalpur
|
Works - Chief Engineer, National Highways(Chief Engineer)
|
Tender for the work Construction of Grround Floor NH Division office Building at Kesinga for the year 2022-23 - Regarding finalization of Tender
|
|
-- |
6
|
|
Supdt Engg. NH, Sambalpur
|
Works - Chief Engineer, National Highways(Chief Engineer)
|
P/R to NH-57 from Km 140/900 to 162/010 km in the State of Odisha on EPC Mode for the year 2021-22 : Regarding Issue of Completion Certicate
|
|
-- |
7
|
|
Supdt Engg. NH, Sambalpur
|
Works - Chief Engineer, National Highways(Chief Engineer)
|
Submission of Revised compensation estimate amount of Additional 3(G) of acquisition of land of Jharsuguda District Portion i.e. from km 269/300 to 328/200 km of NH-49 ( Jharsuguda- Bhojpur Section
|
|
-- |
8
|
|
Supdt Engg. NH, Sambalpur
|
Works - EE NH Sambalpur(Executive Engineer NH)
|
Submission of 12th IPC Bill for the work, “Construction of road from Km 0/00 to 72/00 Km of NH.26 such as 4 Lane from Km 0/00 to 21/00 (Bargarh to Barpali) and Widening and Strengthening of double lane with paved shoulder from Km 21/00 to 72/00 Km (Barpali to Bolangir)
|
|
-- |
9
|
|
Supdt Engg. NH, Sambalpur
|
Works - Chief Engineer, National Highways(Chief Engineer)
|
Submission of expenditure statement under D.No. 7-2059-PW-001-General-80-Direction and Administration for the month of Nov 2022
|
|
-- |
10
|
|
Supdt Engg. NH, Sambalpur
|
Tahasildar Athamallik(other)
|
Widening and Strengthening of two lane to two lane with paved shoulder from Km 58/00 to 116/100 Km (Total 58.10 Km)of N.H.153(B) on EPC Mode in the State of Odisha vide Agreement No.CENH-EPC-06 of 2017-18 : Hindrances of encroachment for execution of Kiakata Major Junct
|
|
-- |
11
|
|
Supdt Engg. NH, Sambalpur
|
Works - Chief Engineer, National Highways(Chief Engineer)
|
Requisition of funds under supervision charges for making expenditure during the financial year 2022-23 for the work, Consultancy to provide key personnel to assist Departmental Authoritys Engineer for supervision of Construction of road from Km 0/00 to 72/00 Km of N.H.
|
|
-- |
12
|
|
Supdt Engg. NH, Sambalpur
|
|
RTI of Sri Ranjan Kumar Bhagat
|
|
-- |
13
|
|
Supdt Engg. NH, Sambalpur
|
|
RTI of Smt Pratibha
|
|
-- |
14
|
|
Supdt Engg. NH, Sambalpur
|
Works - Chief Engineer, National Highways(Chief Engineer)
|
Submission of Revised LA cost estimate 3(G) Bhawanipatna Bypss on NH-26
|
|
-- |
15
|
|
Supdt Engg. NH, Sambalpur
|
Works - EE NH Bolangir
Works - EE NH Sambalpur(Executive Engineer NH)
|
Construction of road from Km 0/0 to 72/0 Km of N.H.26 such as 4 lane from Km 0/0 to 21/0 Km (Bargarh to Barpali) and Widening and Strengthening of double lane with paved shoulder from Km 21/0 to 72/0 (Barpali to Bolangir) in the State of Odisha on EPC Mode”: Regarding h
|
|
-- |
16
|
|
Supdt Engg. NH, Sambalpur
|
Works - Chief Engineer, National Highways(Chief Engineer)
|
Assembly Question No. 494 put by Sri Souvik Biswal Honble ML
|
|
-- |
17
|
|
Supdt Engg. NH, Sambalpur
|
Works - Chief Engineer, National Highways(Chief Engineer)
|
Regarding performance report for the work (1) Widening and Strengthening of existing single lane/intermediate lane to two lane carriageway with paved shoulder including geometric improvement from Km 68/260 to 118/370 Km of NH.59 (Erstwhile Km 213/890 to 264/000 of NH.21
|
|
-- |
18
|
|
Supdt Engg. NH, Sambalpur
|
Works - Chief Engineer, National Highways(Chief Engineer)
|
REPLY TO S.A.Q.NO.704 PUT BY SRI DHRUBA CHARAN SAHOO,HONBLE MLA
|
|
-- |
19
|
|
Supdt Engg. NH, Sambalpur
|
Chief Manager SBI Cuttack coomercial Branch OSIC Building(other)
|
Verifcation of Bank Guarantee for an amount of Rs 2,37,00,000/- of Rajlaxmi Construction Ltd
|
|
-- |
20
|
|
Supdt Engg. NH, Sambalpur
|
Works - Chief Engineer, National Highways(Chief Engineer)
|
Construction of road form Km 0/0 to 72/0 such as 4 lane road from km 0/0 to 21/0 ( Bargarh to Barpali ) and Widening and Strengthening of double lane with paved shoulder form km 21/0 to 72/0 ( Barpali to Bolangir ) of NH-26 in the state of Odisha on EPC mode vide Agreem
|
|
-- |
21
|
|
Supdt Engg. NH, Sambalpur
|
Works - Chief Engineer, National Highways(Chief Engineer)
|
Construction of compound wall of School Building at Ch.200.100(RHS) of NH.130C for the year 2022-23.
|
|
-- |
22
|
|
Supdt Engg. NH, Sambalpur
|
Works - Chief Engineer, National Highways(Chief Engineer)
|
Submission of revised compensation estimate of 3(G) for acquisition of land of Jharsuguda District portion i.e. from Km 269/300 to Km 328/200 Km of NH.49 (Jharsuguda-Bhojpur Section)
|
|
-- |
23
|
|
Supdt Engg. NH, Sambalpur
|
Tahasildar cum CALA Nuapada(other)
|
Construction of four lane ROB and its approaches in lieu of existing level Crossing no. RV-71 at Km 435 on NH-217 ( New NH-353) at Khariar including land acquisition under Annual Plan of 2021-22 - Regarding delay in Land Acquisition
|
|
-- |
24
|
|
Supdt Engg. NH, Sambalpur
|
Shivam Condev Pvt Ltd(other)
|
Tender for the work Reconstruction of HL Bridge across river Tel near Sonepur at Km 51/200 ( Design Chainage 51.140 km ) of NH-57 in the state of Odisha on EPC mode _ Regarding submission of work progrramme and balance 50% of the performance Security
|
|
-- |
25
|
|
Supdt Engg. NH, Sambalpur
|
Works - Chief Engineer, National Highways(Chief Engineer)
|
Additional requirment of fund
|
|
-- |
26
|
|
Supdt Engg. NH, Sambalpur
|
Collector DM Jharsuguda(other)
|
Submission of 3 (G) estimate for the work Construction of Bypass to Jharsuguda town including LA on NH-49
|
|
-- |
27
|
|
Supdt Engg. NH, Sambalpur
|
Works - EE NH Kesinga(Executive Engineer NH)
|
1.Widening of existing 2 lane to 2 lane with paved shoulder form km 181/00 to 239/280 km of (Bhawanipatna - Koksara NH-26 ) in the state of Odisha on EPC Mode 2.. Widening and strengthening of existing single lane / intermediate lane to two lane carriageway with paved s
|
|
-- |
28
|
|
Supdt Engg. NH, Sambalpur
|
Works - EE NH Sambalpur(Executive Engineer NH)
|
Repairing of NH IB Bargarh for use during Bargarh Dhanuyatra 2022-23
|
|
-- |
29
|
|
Supdt Engg. NH, Sambalpur
|
AVR Infratech Pvt Ltd(other)
|
Construction of Truck parking at Bijakhaman of Balangir town from Km 79/700 to Km 80/000 adjacent to NH.26 in the state of Odisha on EPC Mode: Reminder for submission of EOT proposal
|
|
-- |
30
|
|
Supdt Engg. NH, Sambalpur
|
Works - EE NH Rourkela(Executive Engineer NH)
|
Transmission of both Original and Duplicate Service Book in favour of Sri Arun Kumar Pandey , Executive Engineer
|
|
-- |